Loading...
HomeMy WebLinkAboutPIP 02-03; Carlsbad Office Park; Planned Industrial Permit (PIP) (13)CITY OF CARLSBAD ENGINEERING DEPARTMENT LAND USE REVIEW August 5,2002 TO: Saima Qureshy - Associate Planner FROM: David Rick -Assistant Engineer COMPLETENESS REVIEW PROJECT ID: PIP 02-03 CARLSBAD OFFICE PARK The Engineering Department has completed its review of the above referenced project. Engineering staff does not have any comments to add to the project. Please add the following conditions of approval to the approving resolution: FF-DITIONS NOTE Unless specifically stated in the condition, all of the following conditions, upon the approval of this proposed tentative map, must be met prior to approval of a building or grading permit whichever occurs first. General 1. Prior to hauling dirt or construction materials to or from any proposed construction site within this project, Developer shall apply for and obtain approval from, the City Engineer for the proposed haul route. 2. Prior to issuance of any building permit, Developer shall comply with the requirements of the City’s anti-graffiti program for wall treatments if and when such a program is formally established by the City. 3. Developer shall install sight distance corridors at all street intersections in accordance with Engineering Standards. 4. Developer shall comply with the project’s “Standard Urban Stormwater Management Plan” prepared July 28, 2002 and on file with the City. As stated in the Plan, the proposed Continuous Deflective Separation Unit shall be equipped with Oil Sorbent Material unless an alternative application for hydrocarbon removal is used and approved by the City Engineer. 5. Based upon a review of the proposed grading and the grading quantities shown on the site plan, a grading permit for this project is required. Developer shall apply for and obtain a grading permit from the City Engineer prior to issuance of a building permit for the project. H:U.IBRARY\ENG\WPDATAWISCCOMPREV 6. Developer shall cause Owner to make an irrevocable offer of dedication to the City and/or other appropriate entities for all public streets and other easements shown on the site plan. The offer shall be made by separate recorded document. All land so offered shall be offered free and clear of all liens and encumbrances and without cost. Streets that are already public are not required to be rededicated. 7. Additional drainage easements may be required. Developer shall dedicate and provide or install drainage structures, as may be required by the City Engineer, prior to or concurrent with any grading or building permit. 8. Developer shall execute and record a City standard Development Improvement Agreement to install and secure with appropriate security as provided by law, public improvements shown on the site plan/grading plan and the following improvements including, but not limited to: a) Sidewalk, b) A pedestrian ramp at the intersection of Camino Vida Roble and Corte Del Nogal, c) Grading, clearing and grubbing, d) Installation of sewer and water facilities, e) Fire hydrants, 9 Retaining walls. Said improvements shall be installed to City Standards to the satisfaction of the City Engineer. A list of the above shall be placed on an additional map sheet on the Final Map per the provisions of Sections 66434.2 of the Subdivision Map Act. Improvements listed above shall be constructed within 18 months of approval of the subdivision or development improvement agreement or such other time as provided in said agreement. 9. Prior to occupancy, developer shall have design, apply for and obtain approval of the City Engineer, for the structural section for the access aisles with a traffic index of 5.0 in accordance with City Standards due to truck access through the parking area and/or aisles with an ADT greater than 500. The structural pavement design of the aisle ways shall be submitted together with required R-value soil test information and approved by the City Engineer as part of the building or grading plan review whichever occurs first. 10. Prior to the issuance of building permits, the developer shall provide the City with proof that SDG&E has granted permission to grade within their easement as shown on the grading plan. IO. The Average Daily Trips (ADT) and floor area contained in the staff report and shown on the site plan are for planning purposes only. Developer shall pay traffic impact and sewer impact fees based on Section 18.42 and Section 13.10 of the City of Carlsbad Municipal H:!LIBRARWNG\WPDATA\MISC!COMPREV Code, respectively. Water/Sewer 11 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. The Developer shall design and construct public facilities within public right-of-way or within minimum 20-feet wide easements granted to the District or the City of Carlsbad. At the discretion of the District Engineer, wider easements may be required for adequate maintenance, access and/or joint utility purposes. Prior to issuance of building permits, Developer shall pay all fees, deposits, and charges for connection to public facilities. Developer shall pay the San Diego County Water Authority capacity charge(s) prior to issuance of Building Permits. The Developer shall prepare a colored recycled water use map and submit this map to the Planning Department for processing and approval by the District Engineer. The Developer shall design landscape and irrigation plans utilizing recycled water as a source. Said plans shall be submitted to the satisfaction of the District Engineer. The Developer shall install potable water and recycled water services and meters at a location approved by the District Engineer. The locations of said services shall be reflected on public improvement plans. The Developer shall install sewer laterals and clean-outs at a location approved by the District Engineer. The locations of sewer laterals shall be reflected on public improvement plans. The Developer shall design and construct public water, sewer, and recycled water facilities substantially as shown on the grading plan to the satisfaction of the District Engineer. Proposed public facilities shall be reflected on public improvement plans. This project is approved upon the express condition that building permits will not be issued for the development of the subject property, unless the District Engineer has determined that adequate water and sewer facilities are available at the time of occupancy. Prior to issuance of building permits, the entire potable water, recycled water, and sewer system shall be evaluated in detail to ensure that adequate capacity, pressure, and flow demands can be met to the satisfaction of the District Engineer. A fire flow system shall be required for this industrial development and it shall be constructed as a looped system. The Developer shall complete the looped water system by tying into the existing waterline system on Corte Del Nogal and Camino Vida Roble to the satisfaction of the District Engineer. The Developer shall coordinate with the District Engineer regarding the looped system and easements. If you or the applicant has any questions regarding the above, please either see or call me at extension 2781. Assistant Engineer - Development Services Division H:LIBRARY\ENG\WPDATA\MISC\MMPREV