HomeMy WebLinkAboutPIP 02-03; Carlsbad Office Park; Planned Industrial Permit (PIP) (7)- City of Carlsbad
January 30,2003
Richard Boureston
Boureston Development
5500 Trabuco Road, Suite 100
Irvine, CA 92620-5705
COMPLETION OF IMPROVEMENT PLANCHECK FOR: DWG 404-3
PROJECT NAME & NO.: Carlsbad Office Park, PIP 02-03
The purpose of this correspondence is to inform you that the City Engineer has signed the
improvement plans for the project noted above. These plans are now the property of the City of
Carlsbad and have been filed for permanent record with this office.
The City of Carlsbad requires that contractors obtain a right-of-way permit prior to constructing any
improvements within publicly dedicated streets or easements. Since the improvements reflected on your improvement plans fall within this category, you must first obtain a right-of-way permit prior to
initiating your construction activities. You may obtain a right-of-way permit by making application at
our Engineering Development Services Counter at 1635 Faraday Avenue. This is a "no-fee" permit.
A Right-of Way Permit Submittal Package is attached for your convenience.
The following items need to be submitted and/or approved prior to the issuance of a right-of-way
permit:
1. Completed application form.
2.
3.
4.
5.
6.
7.
Contractors state license number and class (type).
City of Carlsbad Business License number.
Certificate of insurance in the amount of $1,000,000 naming the City of Carlsbad as
"additional insured" and as "certificate holder".
Traffic Control Plan (if not included in the improvement plan).
Four (4) blueline sets [three (3) bluelines and one (1) 11 x 17 reduced set] of the
signed improvement plans (one set of bluelines is for the Utilities Department).
As part of your permit approval, application with the Utilities Department will be
required to tap into sewer, water and/or reclaimed water lines.
In addition, if your project requires a grading permit you must complete the items listed on the
completion of Grading Plancheck Letter and receive approval on a grading permit prior to or
concurrent with the issuance of a right-of-way permit. You may obtain the blueline sets and any
other plan reproductions you desire through one of the several bonded blue print firms in the area at
your cost.
Your Right of Way Permit will be issued when all the above noted requirements have been
completed. After permit issuance, contact the Engineering Inspection Request Line at 760-438-3891
to set up a preconstruction meeting with your inspector. You will receive your copy of the permit
during the preconstruction meeting with your inspector. DO NOT BEGIN CONSTRUCTION UNTIL
H Ulavelomenl Servlces\Maslers\Lers .UmpmVoenl Uanoheck COmplelmn Ur Rev 1lmRMn
1635 Faraday Avenue - Carlsbad, CA 92008-731 4 (760) 602-2720 - FAX (760) 602-8562 @
Boureston Development
January 30,2003
Page 2 of 2
YOU HAVE RECEIVED YOUR PERMIT FROM THE PUBLIC WORKS INSPECTOR.
Thank you for your cooperation and assistance in this matter. It has been a pleasure working with
you through the plancheck process. If you have project related questions, please feel free to give me
a call at 760-602-2781.
In an effort to improve our customer service, the Community Development Department is soliciting
your comments on the service you have received in processing your project. Enclosed is a
Customer Service Survey form. Please take a few minutes to complete this form and return it to the
City. Your help is greatly appreciated.
Respectfully, 3 I
DAVID RICK
Assistant Engineer
C: "r:
Inspection: Office Specialist
Permit Station
File
Attachments - Right-of-way Permit Submittal Package
Customer Service Survey