Loading...
HomeMy WebLinkAboutPIP 02-03; Carlsbad Office Park; Planned Industrial Permit (PIP) (7)- City of Carlsbad January 30,2003 Richard Boureston Boureston Development 5500 Trabuco Road, Suite 100 Irvine, CA 92620-5705 COMPLETION OF IMPROVEMENT PLANCHECK FOR: DWG 404-3 PROJECT NAME & NO.: Carlsbad Office Park, PIP 02-03 The purpose of this correspondence is to inform you that the City Engineer has signed the improvement plans for the project noted above. These plans are now the property of the City of Carlsbad and have been filed for permanent record with this office. The City of Carlsbad requires that contractors obtain a right-of-way permit prior to constructing any improvements within publicly dedicated streets or easements. Since the improvements reflected on your improvement plans fall within this category, you must first obtain a right-of-way permit prior to initiating your construction activities. You may obtain a right-of-way permit by making application at our Engineering Development Services Counter at 1635 Faraday Avenue. This is a "no-fee" permit. A Right-of Way Permit Submittal Package is attached for your convenience. The following items need to be submitted and/or approved prior to the issuance of a right-of-way permit: 1. Completed application form. 2. 3. 4. 5. 6. 7. Contractors state license number and class (type). City of Carlsbad Business License number. Certificate of insurance in the amount of $1,000,000 naming the City of Carlsbad as "additional insured" and as "certificate holder". Traffic Control Plan (if not included in the improvement plan). Four (4) blueline sets [three (3) bluelines and one (1) 11 x 17 reduced set] of the signed improvement plans (one set of bluelines is for the Utilities Department). As part of your permit approval, application with the Utilities Department will be required to tap into sewer, water and/or reclaimed water lines. In addition, if your project requires a grading permit you must complete the items listed on the completion of Grading Plancheck Letter and receive approval on a grading permit prior to or concurrent with the issuance of a right-of-way permit. You may obtain the blueline sets and any other plan reproductions you desire through one of the several bonded blue print firms in the area at your cost. Your Right of Way Permit will be issued when all the above noted requirements have been completed. After permit issuance, contact the Engineering Inspection Request Line at 760-438-3891 to set up a preconstruction meeting with your inspector. You will receive your copy of the permit during the preconstruction meeting with your inspector. DO NOT BEGIN CONSTRUCTION UNTIL H Ulavelomenl Servlces\Maslers\Lers .UmpmVoenl Uanoheck COmplelmn Ur Rev 1lmRMn 1635 Faraday Avenue - Carlsbad, CA 92008-731 4 (760) 602-2720 - FAX (760) 602-8562 @ Boureston Development January 30,2003 Page 2 of 2 YOU HAVE RECEIVED YOUR PERMIT FROM THE PUBLIC WORKS INSPECTOR. Thank you for your cooperation and assistance in this matter. It has been a pleasure working with you through the plancheck process. If you have project related questions, please feel free to give me a call at 760-602-2781. In an effort to improve our customer service, the Community Development Department is soliciting your comments on the service you have received in processing your project. Enclosed is a Customer Service Survey form. Please take a few minutes to complete this form and return it to the City. Your help is greatly appreciated. Respectfully, 3 I DAVID RICK Assistant Engineer C: "r: Inspection: Office Specialist Permit Station File Attachments - Right-of-way Permit Submittal Package Customer Service Survey