Loading...
HomeMy WebLinkAboutPIP 02-03; Carlsbad Office Park; Planned Industrial Permit (PIP) (8)MEMO 16842 Von Karman Ave., Suite 300, Itvine, CA. 92606-4927 www.leesak.com E-Mail: leesak@leesak.com TEL: (949) 261-1100 FAX: (949) 261-1 144 DATE: April 30,2002 TO: Mr. Gary Wayne, Asst. Planning Director c/o Ms. Saima Qureshy Planning Department - City of Carlsbad FROM: Ron Sakahara cc: Richard Boureston - Boureston Development Jim Schreder - Danjon Engineering Charles Trowbridge - Charles Trowbridge Assoc. Wayne Edwards - Diffenbaugh Steve Gossett - Diffenbaugh Greg Holzem - Diffenbaugh Michael Heinrich - Leesak Chor Chow - Leesak RE: Prelim. Review Comments from the City of Carlsbad dated 4/10/02 PRE 02-09 Carlsbad Office Park L.S. #Y1051 APN: 21 3-061-25 The following is a response to your April 10, 2002 letter: PLAN N I NG : Item 1. Planned Industrial Permit (PIP) required. Item 2. Submittal package to be forwarded to the Airport Land Use Commission for review. Item 3. Building “D” has been shifted to the west, along with the parking between Buildings C & D. Building “C” has also been slightly rotated. The top of slope line has been more accurately confirmed from a top0 map. Mr. Gary Wayne I c/o Ms. Saima Qureshy Prelim. Review Comments City of Carlsbad, California Item 4. Item 5. Item 6. Item 7. Item 8. Item 9. April 30, 2002 Page 2 A. Building “D” is now setback from the east properly line by approximately 44 feet versus the 31 feet from the original site plan. The distance of the building to top of slope has significantly been increased (see revised site plan). ENGINEER1 NG: The employee eating area located within the 50’ required front yard has been relocated. All of these areas are in a private area and incorporated with landscape. The landscaped area, excluding the required setback area is 53% of the parking area. In addition, minimum of 3% of the area shall be planted with plant material on the Official City list. All HVAC roof mounted equipment shall be screened from public view. See attached sight line sections. Landscape strips have been provided at the standard stalls adjacent to the retaining wall. This bumper over-ride strip shall be planted with a climbing vine type plant material to cover the retaining wall. Where compacts spaces are adjacent to this retaining wall, and code does not allow bumper over-ride landscape strips at compacts, we have provided plant “niches” for the climbing vine. These niches are placed at every other parking stall at the compacts. Refer to the revised Site Plan. A six feet high retaining wall is proposed to gain the additional pad to assure that we obtain significant landscape adjacent and between the buildings. The six feet high wall will not require special engineering and is still low enough to create a human- scale look. This retaining wall will be eventually fully covered with a climbing vine to create a green wall that will blend in with the slope. Additional exterior elevations, including the ones facing Camino Roble and Code Del Nogal will be submitted. In addition, soil prep, plant types, sizes and location, irrigation system plans, and a full site lighting plan shall be submitted. Item 1. The driveway approaches on the opposite side of Corte Del Nogal have been shown. Due to the perimeter slopes on this street and the existing SDG&E EasementlEquipment, the access driveway into our site is limited to the location we have shown. t Mr. Gary Wayne / c/o Ma. Saima Qureshy Prelim. Review Comments City of Carlsbad, California April 30, 2002 Page 3 Item 2. Parking stalls at the corners where back ends of the spaces are adjacent to each other, have been revised. Items 3,4,5,6,8 (See Civil Engineers Comment) Item 7. The trash enclosures shall meet the City Standard #GS-I 6. GENERAL ISSUES Item 1. A recent Preliminary Title Report shall be submitted. Item 2. We are aware that the formal project application submittal constitutes the actual package for City review. P:\2001\Y1051 - Carlsbad Ofiices\Project Data\lnfo\RS.Wayne-Pre.Rev.Comflls.doc - James D. Schreder 71 45726850 Monday, April 29, 2002 4;Ol PM - DANJON ENGINEERING, Inc. April 29, 2002 Profesnioiial Civil Engineering Services 33 1-005.1 hlr. Gary Wayne &si ytant Planning Director City of Carlybad 1635 Faraday Avenue Carlubad, CA 92008 Subject: Pre-iYe ## 02-09 - Carlubad Office Park APN 213-061-25 Dear Mr. Wayne: Thank you foi- reviewing the pre-file application, t-he following is DANJON’R renponlre to the city‘s civil engineering comments: 1. Item # 1: BR divcuvned with David Rick. tlie driveways alignment can‘t be aligned due to grade reasons and the driveways are over 100-feet apait. Thus there is no conilict given the minimum traffic flow on Corte Del Nogal. Item # 3: A public water line system will he deqignetl around the huildinge. Item # 4: The project will comply with the RCXQCS San Diego Region Order e 200 1- 01. 4. Item # 5: The inta-hection eight didance is shown on the conceptual grading plan. 5. Item # 6: The building WAY move to accommodate drainage at the top of slope. 6. Item # 8: All driveways are lehs than 12-percent. 2. 3. Please feel free to call me if you have any questions or need additional infoimation. Sincerely, DANJON ENGINEERING. Inc. James D. Schreder, P.E Principal p.02 895 E k’nlba Luda Blvd , ## 202, Placeritla CA 02870 Ipns@danjc?nenpeemg corn fan (714) 572-6850 I (71 4) 572-6800