HomeMy WebLinkAboutPIP 02-05; Canyon Ridge Business Park; Planned Industrial Permit (PIP) (9)CITY OF CARLSBAD ENGINEERING DEPARTMENT DEVELOPMENT SERVICES February 21,2003 TO: Van Lynch - Associate Planner FROM: David Rick - Assistant Engineer ISSUES REVIEW PROJECT ID: PIP 02-05 CANYON RIDGE BUSINESS PARK The Engineering Department has completed its review of the above referenced project for compliance with the previously determined issues. The project still has issues that must be addressed. The following is a list of these issues: 1. The letter from Geocon Incorporated addressing the required distance between the building foundation and drainage swale indicates that there must be a horizontal distance of 7 feet yet only 3 feet is provided. Please revise plans accordingly. In addition, the letter should specify whether the drainage swale is an earth drainage swale or a concrete brow ditch. 2. On the grading plan, add a note next to the notes to the Type ‘F’ Catch Basin Inlets stating that Flo-Guard or equivalent filters will be installed. In addition, provide a detail showing the filter’s configuration inside the catch basin. It appears that the filters will interfere with the first step on the inlet. The depth of the existing drain is approximately 12 feet and this catch basin must be equipped with steps since the catch basin is deeper than 4 feet. In addition, the depth of the pipe according to the improvement plans on file at the City is approximately 12 feet, not 9 feet as shown. Please correct. 3. Locate the concrete brow ditches within the parking lot at the end of the stalls against the curb. In addition, the ditch located near the west property line appears to terminate at the curb and there is no mentioning of an opening at the curb. How will water drain at this location? If you or the applicant has any questions regarding the above, please either see or call me at extension 2781. Assistant Engineer - Engineering Development Services Division H:\LIBRARYENG\WPDATAWISC‘COMPREV