HomeMy WebLinkAboutPIP 05-25x1A; HCP Bressi Ranch PA 2; Planned Industrial Permit (PIP) (5)BRESS/ RANCH PlANNING AREA 2 HYDROMODIFICATION MANAGEMENT STUDY 1 . PROJECT DESCRIPTION October 20 7 7 This Hydromodification Management Study analyzes the potential hydromodification impacts of Bressi Ranch Planning Area 2 project, and has been prepared based on the requirements set forth in the Final Hydromodification Management Plan (HMP) for the County of San Diego, prepared by Brown and Caldwell and dated March 2011. This 23.09± acre project site consists of eight (8) existing, mass-graded, undeveloped lots which will be graded to accommodate the construction of eight (8) new two-story buildings with a parking structure, associated on-grade parking and site improvements. The project site is bordered on the north by Gateway Road, to the east by Alicante Road, to the south by Town Garden Road and west by El Camino Real. The immediate surrounding area is comprised primarily of industrial and commercial uses as well as some single family residential as planned for in the Bressi Ranch master plan. Interstate 5 is approximately 3.5 miles to the west of the project site along Palomar Airport Road. The project site is currently located in the zone designated as P-M, planned industrial. 2. SITE INFORMATION The following sections summarize the site conditions which relate to drainage and hydromodification, including the geotechnical conditions, drainage basins, and the low flow threshold determination. 2.1 Geotechnical Conditions A Geotechnical Update Study was completed by Leighton and Associates, Inc. dated April 12, 2011 (Project No. 971 009-065) which details the subsurface conditions for the project. Selected excerpts from the report are as follows: Site Location and As-Graded Description: "The Bressi Ranch Industrial Planning Area 2 site is located south of Palomar Airport Road and east of El Camino Real Road in Carlsbad, California (Figure 7 ). The mass grading operations for the site were performed between June 2003 and January 2004 (Leighton, 2004b). The mass grading of the site resulted in three terraced sheet-graded pads separated by south-and west-facing slopes approximately 5 to 8 feet in height and three desilting basins along Town Garden Road, the southern boundary of the site. In addition, along Town Garden Road there is a south-to southeast facing 2 to 7 fill slope, which ranges from 5 to 15 feet in height. In general, the mass grading of the site included: 7) the removal of potentially compressible desiccated older fill soils, undocumented fill soils, topsoil, colluvium, alluvium, landslide deposits, and weathered formational material; 2) preparation of areas to receive fill; 3) the placement of a subdrain system in the canyon bottom; 4) excavation of formational material; 5) the placement of compacted fill soils, and 6) excavation of stability fill keys. Up to approximately 15 feet of cut was excavated and a maximum of approximately 90 feet of fill was placed during the mass grading operations within the limits of the site. "The sheet-graded pads of Planning Areas 2 consist of both cut and fills. The cut/fill transition conditions on the sheet-graded pads were not mitigated during the mass grading operations. As """"" reported, once the site improvements on the pads of the planning areas are determined, specific ""-"' recommendations concerning the cut/fill transition conditions were to be provided in an update report 2 BRESS/ RANCH PLANNING AREA 2 HYDROMOD/F/CATION MANAGEMENT STUDY October 20 11 for the site. In general, the cut/fill transition conditions can be mitigated by the overexcavation of the cut portion of the pad or by designing deep foundations that extend through the fill." Geologic Setting: "The subject site is located in the coastal section of the Peninsular Range Province, a geomorphic province with a long and active geologic history throughout Southern California. Throughout the last 54 million years, the area known as the "San Diego Embayment" has undergone several episodes of marine inundation and subsequent marine regression, resulting in the deposition of a thick sequence of marine and nonmarine sedimentary rocks on the basement rock of the Southern California batholith. Gradual emergence of the region from the sea occurred in Pleistocene time, and numerous wave-cut platforms, most of which were covered by relatively thin marine and nonmarine terrace deposits, formed as the sea receded from the land. Accelerated fluvial erosion during periods of heavy rainfall, coupled with the lowering of the base sea level during Quaternary time, resulted in the rolling hills, mesas, and deeply incised canyons which characterize the landforms we see in the general site area today." Geologic Units: "The geologic units encountered during our update study included both recent artificial fill and the Tertiary-aged Santiago Formation. The artificial fill (Af) was placed during the mass grading operations and generally consist of silty sands to sandy silts/clays. The approximate limits of the artificial fill soils are presented on the Geotechnical Map (Plate 1 ). In addition to the fill limits, the elevations of the bottom of the fill are provided on the geotechnical map so that potential fill differentials across the site can be identified." "In accordance with the project geotechnical recommendations, the fill soils in the lower portions of the deep fill areas (i.e. fill areas generally deeper than approximately 40 feet below the proposed finish grade elevations of the sheet-graded pads) were compacted to at least 95 percent of the maximum dry density in accordance with ASTM Test Method D 1557. Fill soils placed within 40 feet of the finish grade surface were compacted to a minimum 90 percent relative compaction (based on with ASTM Test Method D 1557)." "The Tertiary-aged Santiago Formation, as encountered during the mass grading operations, consisted primarily of massively bedded sandstones and claystones/siltstones. The sandstone generally consisted of orange-brown (iron oxide staining) to light brown, damp to moist, dense to very dense, silty very fine to medium grained sandstone. The siltstones and claystones were generally olive-green to gray (unweathered), damp to moist, stiff to hard, moderately weathered, and occasionally fractured and moderately sheared. Several well cemented fossiliferous sandstone beds were encountered during the mass grading operations. It should be noted that high to very high expansive formational claystones and siltstones are present at the existing finish grade elevation of the sheet-graded pad in the eastern portion of Planning Area 2 (see Geotechnical Map -Plate 1 ). " Ground Water: "During the original site grading, perched ground water was encountered in the alluvial soils located in the lower portions of the main canyon and in some of the lower tributary canyons on the east side of Planning Area 2. In addition, several seepage zones were also encountered along the base of a number of the relatively permeable sandstone units in the lower portion of the canyon on the southwest 3 ·.""-' BRESS/ RANCH PLANNING AREA 2 HYDROMODIFICA.TION MANAGEMENT STUDY October 20 11 Grading by Project Design Consultants, dated October, 2004 on file with the City of Carlsbad under CT 00-06, DWG 400-SA, 400-SC and 400-80. 5 BRESS/ RANCH PlANNING AREA 2 HYDROMODIFICATION MANAGEMENT STUDY 2.3 Drainage Basins October 20 7 7 The site currently does not have any storm drain infrastructure installed on-site, but public storm drain infrastructure is located in the adjacent public rights-of-way along Town Garden Road and Alicante Road. Storm drain laterals have been installed during the previous mass-grading operation to serve the temporary desilting basins located on site. These storm drain laterals will be used for the new private storm drain systems associated with the project's development. Presently, the site sheet flows to temporary desilting basins located on each lot. The site generally drains to the south and to the east toward the public storm drain infrastructure located in Town Garden Road and Alicante Road. Runoff from the project site enters the public storm drain system through the existing storm drain laterals, and flows to two storm drain outfalls south of the project in an unnamed canyon. The westerly outfall discharges through a concrete energy dissipater and over a rip rap apron. The easterly outfall discharges into a detention basin and flow continues to the south after existing the detention basin through a concrete energy dissipater and rip rap apron. The two flows confluence after this point and continue to flow to the south in swales through the future Alga Norte Community Park site. The runoff then crosses under Poinsettia Lane, flows across the La Costa Resort golf course, crosses under Alga Road, continues to flow through the La Costa Resort golf course and enters San Marcos Creek near the intersection of El Camino Real and La Costa Avenue. Near this intersection, San Marcos Creek drains to the west and discharges into Batiquitos Lagoon and ultimately the Pacific Ocean. A detailed description of the drainage patterns and flows onsite are discussed in the report titled Drainage Study for Bressi Ranch Planning Area 2 prepared by Fuscoe Engineering, dated October 2011. Additional information on the downstream storm drain system and detention facility is contained in the Drainage Report for Bressi Ranch Mass Grading & Backbone Improvements by Project Design Consultants, dated February, 2003 and Addendum to Drainage Report for Bressi Ranch Mass Grading by Project Design Consultants, dated October, 2004 on file with the City of Carlsbad under CT 00-06, DWG 400-8A, 400-8C and 400-8D. 2.4 Hydromodification Applicability The Bressi Ranch Planning Area 2 project does not qualify for any exemptions listed in the Final Hydromodification Management Plan, and ~ therefore subject to hydromodification mitigation requirements. 2.5 Domain of Analysis A Hydromodification Screening assessment was completed by Chang Consultants dated October 18, 2011 which analyzes the project's point of compliance, domain of analysis and low flow threshold for the project. Selected excerpts from the report are as follows: "The downstream domain of analysis for the study area has been determined by assessing and comparing the four bullet items above. The proiect runoff will discharge into the natural canyon at the easterly and westerly points of compliance (POC). The downstream domain of analysis will be below these POCs." 6 .. ,.,., BRESS I RANCH PLANNING AREA 2 HYOROMODIFICATION MANAGEMENT STUDY October 20 11 "Per the first bullet item, the first permanent grade control below the discharge location is at 72-inch RCP at the north end of Alga Norte Community Park. Since the storm drain containing this RCP continues for over a thousand feet south, one reach (656 feet) downstream of the grade control will be within a non-erodible pipe. Therefore, the downstream domain of analysis based on the first bullet item will be the grade control created by the 72-inch RCP entrance. 11 "The second bullet item is the tidal backwater or lentic (still) waterbody location. The nearest tidal backwater or lentic waterbody is Batiquitos Lagoon, which is over 2 miles south of the POCs." "The final two bullet items are related to the tributary drainage area. According to Project Design Consultants' February 2003, Drainage Report, Bressi Ranch Mass Grading & Backbone Improvements, the areas tributary to the easterly and westerly POCs are 749.7 and 23.7 acres, respectively (the proposed project will generally maintain these drainage areas). The equal order tributary is the point below the easterly and westerly POC's with the same drainage area as the POCs. For the easterly POC, the equal order tributary will be beyond Alga Norte Community Park. For the westerly POC, the equal order tributary will be within the natural canyon. Since the natural canyon is not a stream system or urban conveyance system, the fourth bullet point does not apply." "Based on the above information, the 72-inch RCP was selected as the downstream domain of analysis point for both POCs. The downstream domain of analysis for the westerly POC could have been selected as the point in the natural canyon with a tributary area of 23. 1 acres, but since the easterly POC analysis point is at the 72-inch RCP, this was chosen for the westerly POC as we//. Per the first bullet item, the downstream domain of analysis begins one reach below the 72-inch RCP grade control. As discussed above, a reach is not to exceed 200 meters (656 feet). Since the storm drain system containing this RCP continues for over a thousand feet, one reach downstream of the grade control will be within a non-erodible pipe. Therefore, the downstream domain of analysis based on the first bullet item will be the grade control created at the 72-inch RCP entrance. 11 "Upstream Domain of Analysis The area upstream of the RCP outlet of each POC is an existing graded 2: 1 fill slope with landscaping. The only storm runoff on the slope is from direct precipitation. Consequently, the slope is not anticipated to erode (erosion was not observed during a recent site visit) and the upstream domain of analysis for both POCs will be at each RCP outlet, i.e., the 42-inch RCP outlet and its D-41 establishes the upstream domain of analysis for the westerly POC, and the 24/30-inch RCP outlets and their D-41 establish the upstream domain of analysis for the easterly POC." "Study Reaches within Domain of Analysis The entire domain of analysis extends from each of the POCs to the 72-inch RCP at the north end of Alga Norte Community Park. The total domain of analysis covers approximately 2,300 feet. The domain of analysis was subdivided into three study reaches with similar characteristics (see the Study Area Exhibit). Reach 7 {upper reach) extends from the westerly POC to the easterly POC. Reach 2 (middle reach) continues from the easterly POC downstream to a large existing berm crossing the lower third of the natural canyon. The berm is earthen and the center portion was breached sometime in the past. The canyon runoff currently flows through the breach. Reach 3 (lower reach) extends from the earthen berm to the 72-inch RCP." "Each reach is longer than the 656 feet maximum reach length specified by SCCWRP. Review of topographic mapping, aerial photographs, and field conditions reveals that the physical (channel geometry and longitudinal slope), vegetative, hydraulic, and soil conditions within each reach are 7 BRESS/ RANCH PlANNING AREA 2 HYDROMODIF/CATION MANAGEMENT STUDY October 20 11 relatively uniform. Subdividing the reaches into smaller subreaches of less than 656 feet will not yield significantly varying results within a reach. Although the screening tool was applied across the entire ·..........-length of each of the three reaches, the results will be similar for shorter subreaches within each reach." 2.6 low Flow Threshold Determination "The SCCWRP channel screening tools were used to assess the downstream channel susceptibility for the Bressi Ranch project. The project runoH will discharge into a natural canyon south of the site at an easterly and westerly point of compliance. Each POC contains RCP discharging through D-41 concrete energy dissipaters. The assessment was made for the natural canyon from the POCs to Alga Norte Community Park, which is just under 0.5 miles south of the site (domain of analysis). The assessment was performed based on oflice analyses and field work. The results indicate a low threshold for vertical and lateral susceptibilities." "The HMP requires that these results be compared with the critical stress calculator results incorporated in the County of San Diego's BMP Sizing Calculator. The BMP Sizing Calculator critical stress results are included in Appendix B for Reach 1, 2, and 3. Based on these values, the critical stress results returned a low threshold. Therefore, the SCCWRP analyses and critical stress calculator demonstrate that the project can be designed assuming a low susceptibility, i.e., 0.502." "The SCCWRP results are consistent with the physical condition of the natural canyon within the domain of analysis, which is densely vegetated environmental preserve. None of the three study reaches nor D-41 outlets exhibit signs of extensive, ongoing erosion." Based upon the information provided above and the full study performed for the project by Chang Consultants, the low-flow threshold for the project shall be 0.5Q2• Please see the study Hydromodification Screening for Bressi Ranch Planning Area 2 by Chang Consultants, dated October 18, 2011 under separate cover for the full study which is also on file with the City of Carlsbad. 8 BRESS/ RANCH PlANNING AREA 2 HYDROMODIF/CA.TION MANAGEMENT STUDY 3. METHODOLOGY October 20 11 The hydromodification analysis for Bressi Ranch Planning Area 2 project has been done in accordance with the Final Hydromodification Management Plan, dated March 2011. 3.1 Drainage Management Strategy The drainage management strategy for the project utilizes Low Impact Development principles and practices to provide water quality treatment and hydromodification mitigation. Portions of the site which consist of almost entirely pervious surfaces will be identified as self-treating areas. Where possible, the majority of the project's impervious surfaces, including roofs and hardscape, will drain to flow-through planters. Depending on site constraints, some drainage areas may drain to permeable pavers underlain by a gravel storage layer and sand filter layer which serves as an inverted flow- through planter. The following sections will provide detailed descriptions of each of the BMPs utilized. To size the BMPs, the tributary areas to each BMP were delineated into Drainage Management Areas (DMAs). The DMAs were further broken down into proposed impervious areas, such as roofs and pavement, and proposed pervious areas, including landscaping and slopes. Refer to the Hydromodification Management Exhibit in Appendix 2. The San Diego Hydromodification Sizing Calculator Version 3.0, developed by Brown and Caldwell, was utilized to size the BMPs. As the proposed BMPs are low-impact development features, the "LID Sizer" feature of the calculator was used. The BMPs were sized for "Treatment + Flow Control". The prevalent hydrologic soil group for the project is Group D, and the project site is located within the Oceanside rainfall basin. The calculator's Point of Compliance screen was utilized and the vertical and lateral susceptibility were entered as "low". This allowed the BMPs to be sized using the correct low-flow threshold of 0.5Q2. The existing site slopes are flat (0-5%) for all the project basins. The output from the calculator can be found in Appendix 5. 3.2 Flow-Through Planters Flow-through planters are proposed in the majority of the project's DMAs throughout the site. The flow-through planters will receive runoff from building downspouts, pavement areas, hardscape and adjacent landscaped areas. The majority flow-through planters have been placed and sized to provide water quality treatment and hydromodification flow control for their respective DMAs. A few flow-through planter IMPs will required subsurface detention to meet hydromodification orifice flows, which are modeled in the Calculator as bioretention plus vault. Runoff from small storm events will pond up on the surface of the planter, being treated by vegetative update and biofiltration as it percolates through a 24" soil layer. An overflow catch basin will be located 1 0" above the bottom of the planting area to allow for up to 1 0" of pending. Then runoff will enter an 18" deep storage reservoir consisting of #57 stone with 40% void space. Treated water will be collected by a subdrain at the bottom the planter. Outflow through the subdrain will be controlled by a galvanized steel plate with a drilled orifice placed at the outfall of the subdrain pipe when it enters a downstream storm drain structure. The system's orifice has been sized per the San Diego Hydromodification Calculator. 9 BRESS/ RANCH PLANNING AREA 2 HYDROMODIFICAT/ON MANAGEMENT STUDY 4. CALCULATIONS/RESULTS 4.1 Flow-Through Planters October 20 7 7 As described in Section 3.2, the flow-through planters were sized using the BMP Calculator. The table below summarizes each of the DMAs which flow to the flow-through planters, as well as the required and provided area for each BMP. As noted in Section 3.5 above, the orifice size produced by the Calculator is applicable to these BMPs, and is also listed in the table. FLOW-THROUGH PLANTERS BMP Drainage Management Areas (DMAs) Sizing Factor Calculations (0.5 Q 2) Size Provided Impervious Pervious Total Area Low Flow Orifice Area Basin DMA Area Required Threshold Diameter Provided (s.f.) (s.f.) (s.f.) (s .f.) (cfs) (in.) (s.f.) 1 47 13,736 2,910 14,030 975 0.028 0.8 990 1 49 6,580 818 6,670 457 0.013 0.6 470 1 50 7,187 1,547 7,350 518 0.014 0.6 520 1 51 10,060 4,209 10,490 731 0.021 0.7 800 1 52 8,003 4,404 8,450 579 0.016 0.6 600 2 34 44,741 13,862 46,130 3,232 0.092 2.0 3,300 2 35 21,012 2,423 21,260 1,494 0.042 1.0 1,500 2 39 17,378 7,545 18,140 1,280 0.036 1.0 1,280 2 40 11,315 6,798 12,000 853 0.024 0.8 900 2 41 13A64 4,056 13,870 975 0.028 0.8 1,000 2" 42 7,682 ---7,690 548 0.015 0.6 600 3 1 17,380 4,020 17,790 1,250 0.035 1.0 1,300 3 23 13,186 ---13,190 1,768 0.050 1.0 1,800 3 24 3,827 1,136 3,950 274 0.007 0.4 300 3 25 7,059 1,029 7,170 487 0.014 0.6 600 3 26 3,084 1,013 3,190 213 0.006 0.4 300 3 27 1,430 831 1,520 91 0.002 0.2 110 3 29 6,170 ---6,170 426 0.012 0.5 440 3 30 8,627 ---8,630 609 0.017 0.7 700 3 31 6,562 ---6,570 457 0.013 0.6 500 3 32 8,872 3,793 9,260 640 0.018 0.7 700 3 33 10,473 1,142 10,590 731 0.021 0.7 750 3 54 2,809 996 3,000 213 0.006 0.4 300 4 2 13,307 ---13,310 945 0.027 0.8 1,000 4 3 13,186 ---13,190 914 0.026 0.8 1,000 4 5 4,803 2,373 5,050 365 0.010 0.5 400 4 9 11,965 ---11,970 823 0.023 0.8 920 4 10 12,949 ---12,950 914 0.026 0.8 1,000 4 20 7,044 ---7,050 487 0.014 0.6 500 4 8 13,035 ---13,040 914 0.026 0.8 1,000 5 13 10,754 3,328 11,090 762 0.021 0.7 800 5 14 13,229 4,062 13,640 945 0.027 0.8 1,000 5 15 6,806 ---6,810 487 0.014 0.6 500 5 16 10,901 2,471 11,150 792 0.022 0.8 500 13 ----~"----------~-------- BRESS/ RANCH PLANNING AREA 2 HYDROMODIFICATION MANAGEMENT STUDY 5.0 MAINTENANCE Designated Responsible Party: HCP LS Carlsbad, LLC c/o Project Management Advisors 462 Stevens Avenue, Suite 1 06 Solana Beach, CA 92075 (858) 704-1980 October 20 11 Below are the suggested maintenance activities for the underground storage systems; these are minimum requirements only. The frequency and/or scope may be increased, if necessary, to meet and/or maintain the level of storm water quality treatment and flow control required of this project. For additional information on maintenance of the various storm water treatment control BMPs, please refer to the project's Storm Water Management Plan for the Bressi Ranch Planning Area 2 project prepared by Fuscoe Engineering under separate cover. Underground Storage Systems Safety: Before entering into any storm sewer or underground storage system, check to make sure that all OSHA and local safety regulations and guidelines are observed during the maintenance process. Hard hats, steel-toed boots and any other appropriate personal protective equipment shall be worn at all times. Inspection Frequency: Inspections are recommended at a mm1mum on an annual basis. The first year of operation may require more frequent inspections. Frequency of inspections will vary significantly on the local site weather and site conditions. An inspection schedule should be established for each installation. Inspections: Inspection is the key to effective maintenance and is easily performed. The entire storm water treatment train should be inspected and maintained beginning with the upstream device and continuing downstream to the discharge orifice located immediately downstream of the underground storage system. Maintenance: The underground storage systems are accessed through manholes above each system. Underground storage systems should be inspected at regular intervals and maintained when necessary to ensure optimum performance. The rate at which the system accumulates silt and sediment will depend on the local site weather and site conditions or the configuration of the system. Silt and sediment should be removed, especially it accumulated materials are interfering with the operation of the system (i.e. blocking outlet orifices, pipes or reducing the storage capacity). It is easiest to maintain a system when there is no flow entering. For this reason, cleanout/maintenance of the system should be scheduled during dry weather. The maintenance of this system should be coordinated with the maintenance of the other storm water treatment control BMPs on site to limit the potential for pollutants to be flushed downstream inadvertently. A vector truck or similar device can be used to remove silt and sediment from the underground storage system. High pressure water jets can be used to dislodge and remove any accumulated sediment or debris and the vacuum truck will collect and properly dispose of the resulting runoff. Once maintenance is complete, replace all manhole rims and access covers as necessary. 15 ·- BRESS/ RANCH PLANNING AREA 2 HYDROMODIF/CA.TION MANAGEMENT STUDY 6. SUMMARY AND CONCLUSION October 20 7 7 As demonstrated in this report, the hydromodification mitigation measures proposed for the Bressi Ranch Planning Area 2 project will satisfy the requirements of the Final Hydromodification Management Plan. This will be achieved through the use of flow-through planter, permeable paver and underground storage BMPs which will reduce peak runoff flows and increase durations from the developed areas of the project to below pre-project levels for the flow range of 0.502 to Q 10• The BMPs have been designed using the San Diego Hydromodification Sizing Calculator. Maintenance of the BMPs will be performed by the owner/developer or their agents. Please refer to the project's Storm Water Management Plan and Drainage Study for further information regarding the water quality and hydrology aspects of the proposed project. 16 ··············································~~~~';:UF~;;;';, ~~~,4~~''11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 ( Appendix3 c Underground Storage Basin Map1 Appendix5 Calculator Output R~Result ( Project Summary ProjectN...,. Breaai Ranch Ptanning Area 2 Project Appllc.t HCP LS Car1abad, LLC Jurlodlcllon City ol Ca~sbad Porcei(APN) Hydrologic Unit Ca~sbad Compliance Basin Summary B•elnName: Basin 1 Receiving War: Weeterty SO Outfall into existing canyon south of project blnf•IIB•In Oceanside Mean Annuol P...:lpltollon (lnchn) 13.3 Project B•ln Ar .. (oc,..): 4.30 Warohed Aroo (oc,.o): 186.00 SCCWRP Larlll Chonnel SuecepUbllty (H, II, L): Low (Lateral) SCCWRP Verllftclll Channel SuocepUbllty (H, II, L): Low(Vertical) Overall Channel SuocepUblllty (H, II, L): LOW Low.r Flow Th,.ohold (%of 2·Y•or Flow): 0.5 Drainage Management Area Summary ID Type BIIPID Description A,.a(oc) P,..Project Cover Poat Surf.:• Type 11449 Drains to LID BMP1 DMA43 0.54 Pervious (Pre) Concrete or asphalt -.. 11451 Drains to LID BMP2 DMA44 1.01 Pervioua (Pre) Concrete or asphalt ------------------- 11453 Drains to LID BMP3 DMA45 0.46 Pervious (Pre) Concrete or asphalt 11455 Drains to LID BMP4 DMA46 0.36 Pervious (Pre) Concrete or asphalt 11457 Drains to LID BMP5 DMA47 0.32 Pervious (Pre) Concrete or aaphatt --i ------------------------------ 11459 Drains to LID BMP6 DMA46 0.14 Pervious (Pre) Concrete or asphalt ---------r----------r-------------- 11461 Drains to LID BMP7 DMA49 0.15 Pervious (Pre) Concrete or asphalt ---------- 11463 Draine to LID BMP8 DMA50 0.17 Pervious (Pre) Concrete or asphalt 11465 Drains to LID BMP9 DMA51 0.24 Pervklus (Pre) Concrete or asphalt 11467 Drains to LID BMP10 DMA52 0.19 Pervk>ua (Pre) Concrete or asphalt LID Facility Summary Drlllnoge Soli TypeD (high runoff-clay sol... . ------------------------------- TypeD (high runoff-clay sol ... Slope Flal-slope (1888 .. Flal-slope (leoo .. -------------------------·--------------------- TypeD (high runoff-clay soL. TypeD (high runoff-clay eeL Type D (high runoff-clay sol ... Flal· slope (1888 .. Flal-slope (leoo .. --- Flal-slope (lees .. -------------+---------! TypeD (high runoff-clay eeL. Flal-slope (leoo ... -+--------------~-----------­ TypeD (high runoff-clay eeL. Flat-slope (leoo ... ---~--------+----------------- Type D (high runoff· cley eeL TypeD (high runoff-clay soL. TypeD (high runoff-clay sol ... Fial-slope (lees .. Flat· slope (lees ... Flat· slope (lees ... Par)of2 http://uknow .brwncald.com/wastewater/Toolkits/W atershed/SiteToolkit/ReportResult.aspx?pid= 138617 &bid=SDC-000 1 &sic=... 10/16/2011 () Project Summary Project Name Bressi Ranch Planning Area 2 Project Applicant HCP LS Car1sbad, LLC Jurisdiction City of Carlsbad Parcel (APN) Hydrologic Unit Car1sbad Compliance Basin Summary Basin Name: Basin 3 Receiving Water: Wester1y SD Outfall into existing canyon south of project Rainfall Basin Oceanside Mean Annual Precipitation (inches) 13.3 Project Basin Area (acres): 4.10 Watershed Area (acres): 186.00 SCCWRP Lateral Channel Susceptiblity (H, M, L): Low (Lateral) SCCWRP Vertlfical Channel Susceptiblity (H, M, L): Low (Ver1ical) Overall Channel Susceptibility (H, M, L): LOW Lower Flow Threshold (%of 2-Year Flow): 0.5 Drainage Management Area Summary ID Type BMPID Description Area (ac) Pre-Project Cover Post Surface Type Drainage Soil Slope 11489 Drains to LID BMP 1 DMA1 0.41 Pervious (Pre) Concrete or asphalt Type D (high runoff-clay Flat-slope (less ... soi... 11490 Drains to LID BMP 2 DMA4 0.22 Pervious (Pre) Concrete or asphalt Type D (high runoff-clay Flat -slope (less ... soi. .. 11491 Drains to LID BMP3 DMA19 0.45 Pervious (Pre) Concrete or asphalt Type D (high runoff. clay Flat-slope (less ... soi... 11492 Drains to LID BMP4 DMA21 0.08 Pervious (Pre) Concrete or asphalt TypeD (high runoff-clay Flat -slope (less ... soi. .. 11493 Drains to LID BMP 5 DMA22 0.21 Pervious (Pre) Concrete or asphalt Type D (high runoff-clay Flat-slope (less ... soi ... 11494 Drains to LID BMP6 DMA23 0.58 Pervious (Pre) Concrete or asphalt Type D (high runoff-clay Flat-slope (less ... soi. .. 11495 Drains to LID BMP7 DMA24 0.09 Pervious (Pre) Concrete or asphalt Type D (high runoff-clay Flat-slope (less ... soi. .. 11496 Drains to LID BMP8 DMA25 0.16 Pervious (Pre) Concrete or asphalt TypeD (high runoff-clay Flat-slope (less ... soi. .. ··----------------- 11497 Drains to LID BMP9 DMA26 0.07 Pervious (Pre) Concrete or asphalt TypeD (high runoff-clay Flat-slope (less ... soi. .. 11498 Drains to LID BMP10 DMA27 0.03 Pervious (Pre) Concrete or asphalt TypeD (high runoff-clay Flat -slope (less ... soi. .. 11499 Drains to LID BMP11 DMA28 0.6 Pervious (Pre) Concrete or asphalt Type D (high runoff-clay Flat-slope (less ... soi ... 11500 Drains to LID BMP 12 DMA29 0.14 Pervious (Pre) Concrete or asphalt Type D (high runoff-clay Flat-slope (less ... soi... 11501 Drains to LID BMP13 DMA30 0.2 Pervious (Pre) Concrete or asphalt Type D (high runoff-clay Flat-slope (less ... soi. .. 11502 Drains to LID BMP14 DMA31 0.15 Pervious (Pre) Concrete or asphalt Type D (high runoff-clay Flat-slope (less ... soi. .. 11503 Drains to LID BMP15 DMA32 0.21 Pervious (Pre) Concrete or asphalt TypeD (high runoff-clay Flat -slope (less ... soi ... 11504 Drains to LID BMP16 DMA33 0.24 Pervious (Pre) Concrete or asphalt Type D (high runoff-clay Flat-slope (less ... soi. .. 11505 Drains to LID BMP17 DMA54 0.07 Pervious (Pre) Concrete or asphalt Type D (high runoff-clay Flat-slope (less ... soi. .. LID Facility Summary BMPID Type Description Plan Area (sqft) Volume 1(cft) Volume 2(cft) Orifice Flow (cfs) Orifice Size (inch) BMP1 Flow-Through Planter IMP 1 1250 1041 750 0.035 1.00 BMP2 Bioretention + Cistern IMP 4 335 1150 0.00 0.019 0.6 BMP3 Bioretention + Cistern IMP 19 686 2352 0.00 0.039 0.8 BMP4 Bioretention + Cistern IMP21 121 418 0.00 0.007 0.3 BMP5 Bioretention + Cistern IMP 22 320 1097 0.00 0.018 0.5 BMP6 Flow-Through Planter IMP 23 1768 1472 1061 0.050 1.00 BMP7 Flow-Through Planter IMP 24 274 228 164 0.007 0.4 BMP8 Flow-Through Planter IMP 25 487 406 292 0.014 0.6 BMP9 Flow-Through Planter IMP 26 213 177 128 0.006 0.4 BMP10 Flow-Through Planter IMP 27 91 76 54 0.002 0.2 BMP 11 Bioretention + Vault IMP28 1045 3659 0.00 0.052 1.00 ( ) BMP12 Flow-Through Planter IMP 29 426 355 256 0.012 0.5 BMP13 Flow-Through Planter IMP30 609 507 365 0.017 0.7 BMP14 Flow-Through Planter IMP31 457 380 274 0.013 0.6 BMP15 Flow-Through Planter IMP 32 640 533 384 0.018 0.7 BMP16 Flow-Through Planter IMP33 731 609 439 0.021 0.7 BMP17 Flow-Through Planter IMP 54 213 177 128 0.006 0.4 R~Result ( P~of1 Project Summary ProjectN.,.. Breasi Ranch Planning Area 2 Project Appllc.nt HCP LS Carlsbad, LLC Jurladlctlon City of Carlsbad Porc:ei(APN) Hydrologic Unit Carlsbad Compliance Basin Summary Baaln Name: BasinG Receiving WNr: Eaatarly SO outfall into existing canyon aoulh of project Rainfall a .. tn Oceanakte Meon Annuol Proclpltollon (lnchea) 13.3 Project a .. tn Araa (ocraa): 0.70 Warahed Araa (ocraa): 209.00 SCCWRP Larol Channa! Suacaptlbllty (H, M, L): Low (Lateral) SCCWRP Vertlftcol Channa! Suaceptlbllty (H, M, L): Low(Veo1ical) Overall Channel SuacepUblllty (H, M, L): LOW Lower Flow Thraahold (%of 2·Yeer Flow): 0.5 Drainage Management Area Summary ID Type BMP ID DeacrlpUon Arao(oc) Pre-Project Cover Poat Surface Type Drolnaga Soli Slope BMP 7 DMA 7 0.27 Pervious (Pre) Concrete or asphalt Type 0 (high runoff-clay Flat-slope (leas ... eoi... 11412 Drains to LID r-. ·-·-~·-·--·-. ---... ----·----~~-~---··-----~-~~~~~- 0.16 Pervious (Pre) Concrete or asphalt TypeD (high runoff-clay Flat-slope (leas .. sol ... 11414 Drains to LID BMP 18 DMA 18 LID Facility Summary BMPID Type O.acrlptlon Plan Araa (aqft) Volume t(cft) Volume 2(cft) Orifice Flow (cfo) Orifice Stza (Inch) BMP7 Flow-Through Planter IMP7 823 685 493 0.023 0.8 -· .. ---~-··----~--~ ------------------~----~ f---- BMP18 Flow-Through Planter IMP18 487 406 292 0.014 0.6 http:/ /uknow .brwncald.com/wastewater/Toolkits/W atershed/SiteToolkit/ReportResult.aspx?pid= 138617 &bid=SDC-0001 &sic=... 10/14/2011 Appendix6 I · · :Penneable Paver Orifice Sizing Bressi Ranch Planning Area 2 Permeable Paver Flow Control Orifice Sizing ,r""' Fuscoe Engineering, Inc. Job No. 02722-001-01 '--"' Size of flow control orifice under variable head conditions due variable gravel storage layer depths Q = Co Ao (2gH0) A 0.5 from Equation 6.12 of the San Diego County Drainage Design Manual Where: Q = Discharge through orifice in cubic feet per second (cfs) Co = Orifice Coefficient = 0.6 for a sharp, clean edge orifice A0 = Cross-sectional area of orifice in square feet g = gravitational constant = 32.2 ftlsec2 H0 = head acting on the orifice Solving for the orifice area gives: Ao = Q I [Co (2gH0) A 0.5] The cross-sectional area of the orifice is given as: A0 =IT* (d214) Where: d = Orifice diameter in feet ,_ Combining the equations and solving for the diameter of the orifice gives: '"-d = (4Q I [IT Co (2gH0) A 0.5]) A 0.5 Basin: Imp: AProvided = VProvided = d= Hydromodification Management Study 1 45 1 ,785 s.f. 2,856 cu.ft. 0.042 cfs 4 feet 0.07 feet 0.9 inches from County Calculator output depth of gravel storage Appendix 6 Page 1 of 4 ,..... f ' '-' -- Bressi Ranch Planning Area 2 Permeable Paver Flow Control Orifice Sizing Basin: Imp: AProvided = YProvided = Q= H = 0 d= Basin: Imp: AProvided = YProvided = Q= H = 0 d= Basin: Imp: AProvided = YProvided = Q= H = 0 d= Hydromodification Management Study 1 46 1,339 s.f. 2,142 cu. ft. 0.042 cfs from County Calculator output 4 feet depth of gravel storage 0.07 feet 0.9 inches 1 48 595 s.f. 833 cu.ft. 0.031 cfs from County Calculator output 3.5 feet depth of gravel storage 0.07 feet 0.8 inches 2 36 2,529 s.f. 3,540 cu.ft. 0.057 cfs from County Calculator output 3.5 feet depth of gravel storage 0.09 feet 1.1 inches Appendix 6 Fuscoe Engineering, Inc. Job No. 02722-001-01 Page 2 of 4 ~ ~ -' "--' Bressi Ranch Planning Area 2 Permeable Paver Flow Control Orifice Sizing Basin: Imp: AProvided = VProvided = Q= H = 0 d= Basin: Imp: AProvided = VProvided = Q= H = 0 d= Basin: Imp: AProvided = VProvided = Q= H = 0 d= Hydromodification Management Study 2 37 1,488 s.f. 2,083 cu.ft. 0.032 cfs from County Calculator output 3.5 feet depth of gravel storage 0.07 feet 0.8 inches 3 4 893 s.f. 1 ,250 cu.ft. 0.019 cfs from County Calculator output 3.5 feet depth of gravel storage 0.05 feet 0.6 inches 3 19 1 ,785 s.f. 2,499 cu.ft. 0.039 cfs from County Calculator output 3.5 feet depth of gravel storage 0.07 feet 0.9 inches Appendix 6 Fuscoe Engineering, Inc. Job No. 02722-001-01 Page 3 of 4 ,....., "-" '·~, Bressi Ranch Planning Area 2 Permeable Paver Flow Control Orifice Sizing Basin: Imp: AProvided = VProvided = Q= H = 0 d= Basin: Imp: AProvided = VProvided = Q= H = 0 d= Basin: Imp: AProvided = VProvided = Q= H = 0 d= Hydromodification Management Study 3 21 446 s.f. 625 cu.ft. 0.007 cfs from County Calculator output 3.5 feet depth of gravel storage 0.03 feet 0.4 inches 3 22 893 s.f. 1,250 cu.ft. 0.018 cfs from County Calculator output 3.5 feet depth of gravel storage 0.05 feet 0.6 inches 4 53 1,041 s.f. 2,083 cu.ft. 0.032 cfs from County Calculator output 5 feet depth of gravel storage 0.06 feet 0.7 inches Appendix 6 Fuscoe Engineering, Inc. Job No. 02722-001-01 Page 4 of 4