September 14, 1987
Mr. Mike Holzmiller
Planning Director
City of Carlsbad
2075 Las Palmas Dr.
Carlsbad, CA 92008
Project: Palomar Triad - Phase II
201 1 Palomar Airport Rd.
HCH&A Job #09593
Dear Mr. Holzmiller:
Planning is currently being completed for Phase II of the Palomar Triad (formally known
as "Kaiser Center" at southeast corner of Palomar Airport Road and Camino Vida Roble).
The Master Plan and Phase I of this project were reviewed and approved in January of
1986 under P.I.P. 85-7.
A comparison of the current Master Site Plan with the originally approved plan will
confirm that the Phase II Building is basically in conformance with the original Master
Site Plan. However, in the interim, because Carlsbad has revised its parking regulations,
Phases II and Ill will require an additional 72 parking spaces, with Phase II alone requiring
an additional 40 spaces.
Our current planning efforts demonstrate the fact that we can accommodate the
additional 72 spaces in a future parking structure which is to be constructed with Phase
111. With a more efficient design we are able to keep the structure basically where it is
shown on the original Master Site Plan. Also, the Phase Ill building will remain as shown
on the original plan.
As a temporary parking solution for Phase II, we are planning to construct a 52 space lot
on the future Phase Ill site (see enclosed Phase II Site Plan, revised 9/9/87). The
reasoning behind this lot is two-fold. In the long run this lot will provide some parking
while the parking structure is being built, and in terms of Phase II, will allow grade level
access since the bulk of the parking for4hase II will be lower than the grade level of the
first floor.
In summary, we have progressed with Phase II retaining the originally approved concept,
and would like to receive from you a letter stating that Phase II is "substantially in
conformance" with the original Master Site Plan dated 1/28/86 and P.I.P. 85-7.
c"
Mr. Mike Holzmiller
September 14, 1987
Page 2
Sincerely,
HCH & ASSOCIATES
V. Scbtt Cairns
Project Architect