Loading...
HomeMy WebLinkAboutPIP 87-02A; Atrium II; Planned Industrial Permit (PIP) (2)c I City of Carlsbad January 4, 2001 Newport National Corporation 21 17 Industrial Court, Suite E Vista, CA 92083 SUBJECT: PUD 00-1 12/PIP87=02(A) - ATRIUM II Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning Department has reviewed your Nonresidential Planned Unit Development and Planned Industrial Permit Amendment, application no. PUD 00-1 12 and PIP 87-02(A), as to its completeness for processing. All of the items requested of you earlier have not been received and therefore your application is still deemed incomplete. Listed below are the item(s1 still needed in order to deem your application as complete. This list of items must be submitted directly to your staff planner by appointment. All list items must be submitted simultaneously and a copy of this list must be included with your submittals. No processing of your application can occur until the application is determined to be complete. When all required materials are submitted the City has 30 days to make a determination of completeness. If the application is determined to be complete, processing for a decision on the application will be initiated. In addition, please note that you have six months from the date the application was initially filed, October 17, 2000, to either resubmit the application or submit the required information. Failure to resubmit the application or to submit the materials necessary to determine your application complete shall be deemed to constitute withdrawal of the application. If an application is withdrawn or deemed withdrawn, a new application must be submitted. Please contact your staff planner, Paul Godwin, at (760) 602-4625, if you have any questions or wish to set up a meeting to discuss the application. Sincerely, b\ MICHAEL J. OLZ LLER Planning Director MJH:PG:mh C: Chris DeCerbo Jeremy Riddle File Copy Data Entry Planning Aide 1635 Faraday Avenue Carlsbad, CA 92008-7314 (760) 602-4600 FAX (760) 602-8559 www.ci.carlsbad.ca.us @ A . LIST OF ITEMS NEEDED TO COMPLETE THE APPLICATION NO. PUD 00-1 12/PIP 87-02(A) Planning: None. Engineering: 1, On the site plan identify the projected average daily traffic (ADT) for the proposed project utilizing latest SANDAG figures. 2. Provide a Soils Report addressing the feasibility and recommendations associated with the proposed project. Identify if there is anticipated remedial grading required for the project. ISSUES OF CONCERN Planning: None. Engineering: 1. 2. 3. 4. 5. On the site plan and conceptual grading plan include the proposed driveway slope as it approaches Loker Avenue. Refer to redline set of plans for guidance. On the site plan and conceptual grading plan add symbols to clarify hardscape between the rolled curb and the existing access-hole. The hardscape could consist of PCC, grasscrete or asphalt. One the conceptual landscape plan, call out the size and type of the existing public sewer main and call out all existing access-holes. Also add call outs to ensure that deep-rooted landscaping will not be installed over the existing public sewer main. Also depict the line-of-sight at the driveway entrance looking onto Loker Avenue using Caltrans Standards. The conceptual landscape plan was not included with this second review to verify if these previous issues were addressed. On the conceptual grading plan, indicate how a truck (per Caltrans 407-E) with a 42-foot turning radius will circulate throughout the site. Depict the inside and outside turning radius of the truck at all critical turns to demonstrate feasibility. This is required to demonstrate feasibility of trash trucks and fire trucks traversing the site. Address redlines as noted on the returned site plan and conceptual grading plan. 6. Attached is a redlined print of the project with engineering staff comments. Please be advised, this check print must me returned with the revised plans to facilitate continued staff review. -.