HomeMy WebLinkAboutPIP 87-02A; Atrium II; Planned Industrial Permit (PIP) (2)c I
City of Carlsbad
January 4, 2001
Newport National Corporation
21 17 Industrial Court, Suite E
Vista, CA 92083
SUBJECT: PUD 00-1 12/PIP87=02(A) - ATRIUM II
Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning
Department has reviewed your Nonresidential Planned Unit Development and Planned
Industrial Permit Amendment, application no. PUD 00-1 12 and PIP 87-02(A), as to its
completeness for processing.
All of the items requested of you earlier have not been received and therefore your
application is still deemed incomplete. Listed below are the item(s1 still needed in order to
deem your application as complete. This list of items must be submitted directly to your
staff planner by appointment. All list items must be submitted simultaneously and a copy
of this list must be included with your submittals. No processing of your application can
occur until the application is determined to be complete. When all required materials are
submitted the City has 30 days to make a determination of completeness. If the
application is determined to be complete, processing for a decision on the application will
be initiated. In addition, please note that you have six months from the date the
application was initially filed, October 17, 2000, to either resubmit the application or
submit the required information. Failure to resubmit the application or to submit the
materials necessary to determine your application complete shall be deemed to constitute
withdrawal of the application. If an application is withdrawn or deemed withdrawn, a new
application must be submitted.
Please contact your staff planner, Paul Godwin, at (760) 602-4625, if you have any
questions or wish to set up a meeting to discuss the application.
Sincerely,
b\
MICHAEL J. OLZ LLER
Planning Director
MJH:PG:mh
C: Chris DeCerbo
Jeremy Riddle
File Copy
Data Entry
Planning Aide
1635 Faraday Avenue Carlsbad, CA 92008-7314 (760) 602-4600 FAX (760) 602-8559 www.ci.carlsbad.ca.us @
A .
LIST OF ITEMS NEEDED
TO COMPLETE THE APPLICATION
NO. PUD 00-1 12/PIP 87-02(A)
Planning:
None.
Engineering:
1, On the site plan identify the projected average daily traffic (ADT) for the proposed
project utilizing latest SANDAG figures.
2. Provide a Soils Report addressing the feasibility and recommendations associated
with the proposed project. Identify if there is anticipated remedial grading required
for the project.
ISSUES OF CONCERN
Planning:
None.
Engineering:
1.
2.
3.
4.
5.
On the site plan and conceptual grading plan include the proposed driveway slope
as it approaches Loker Avenue. Refer to redline set of plans for guidance.
On the site plan and conceptual grading plan add symbols to clarify hardscape
between the rolled curb and the existing access-hole. The hardscape could consist
of PCC, grasscrete or asphalt.
One the conceptual landscape plan, call out the size and type of the existing public
sewer main and call out all existing access-holes. Also add call outs to ensure that
deep-rooted landscaping will not be installed over the existing public sewer main.
Also depict the line-of-sight at the driveway entrance looking onto Loker Avenue
using Caltrans Standards. The conceptual landscape plan was not included with
this second review to verify if these previous issues were addressed.
On the conceptual grading plan, indicate how a truck (per Caltrans 407-E) with a
42-foot turning radius will circulate throughout the site. Depict the inside and
outside turning radius of the truck at all critical turns to demonstrate feasibility.
This is required to demonstrate feasibility of trash trucks and fire trucks traversing
the site.
Address redlines as noted on the returned site plan and conceptual grading plan.
6. Attached is a redlined print of the project with engineering staff comments. Please
be advised, this check print must me returned with the revised plans to facilitate
continued staff review.
-.