HomeMy WebLinkAboutPIP 87-03; Madison Square Dev II; Planned Industrial Permit (PIP) (5)2075 LAS PALMAS DRIVE
CARLSBAD, CALIFORNIA 92009-4859
(619) 438-1161 PLANNING DEPARTMENT
April 4, 1988
Dennis Trunnell Madison Square Partnership
4223 Ponderosa Avenue, Suite A San Diego, California 92123
RE: PIP 87-3, PAI0MA.R OAKS
Dear Mr. Trunnell:
With reference to our conversation this morning, I have checked with Pecoff Brothers who specialize in seed mixes for this area .and APPROVE the revised seed mix quantities required for the landslide slope on the above project, as follows:
Festuca Megalura 15 lbs/acre
Encilla Californica 8 lbs/acre
Mimulus Puniceus 5 lbs/acre
Artemisia Californica 4 lbs/acre
This is a lighter seeding of Festuca than was called for on the approved plan and will allow sufficient light to reach the
slower-germinating perennial seeds and ensure coverage with the permanent perennial.
This approved seed mix replaces the mix called out on Exhibit
llBlr landscape restoration plan, as EIA mitigation measures for the above project.
If you have any questions, please call me at 438-1161.
Sincerely,
MURRAY FULFORD Assistant Planner
MF:dm
cc: Gustavo Provera, B.S.H. Associates P.O. Box 950, San Diego, CA 92112-2692