Loading...
HomeMy WebLinkAboutPIP 87-13; Carlsbad Airport Center Lot 4 Unit 1; Planned Industrial Permit (PIP) (3)LUSARDr Building Construction Engineering Construction Civil Engineering CONSTRUCTION COMPANY February 5, 1988 David Hauser - Assistant City Engineer City of Carlsbad 1200 Elm Ave. Carlsbad, CA 92008 Re: Conformance to Condition 1/19 Dear David, In order to conform to Engineering Condition 1\19 for the above referenced project, we propose to provide all necessary waterline easements within 40 days from date that permit is issued. If necessary documentation is not provided within said time period, then construction must stop until said documentation is provided. I would like to discuss this proposal at your earliest convenience. Sincerely, feff A. Boone Project Coordinator San Marcos Corporate Office 1570 Linda Vista Drive San Marcos, Ca. 92069 (61 9) 744-31 33 FAX: (61 9) 744-9064 Mission Viejo 23392 Madaro Road, Suite L Mission Viejo. Ca. 92691 (714) 472-2248