HomeMy WebLinkAboutPIP 87-13; Carlsbad Airport Center Lot 4 Unit 1; Planned Industrial Permit (PIP) (4)AUSTIN
HANSEN
FEHLMAN
-GROUP-
ARCHITECTURE
INTERIOR DESIGN
LAND PLANNING
URBAN DESIGN
ARCHITECTURE LANDSCAPE
ENGINEERING STRUCTURAL
DOUGLAS AUSTIN.AIA
DONALD HANSEN,AIA MARK FEHLMAN, AIA
RANDY ROBBINS, AIA
RAND1 COOPERSMITH
February 4,1988
Wilma Diepersloot City of Carlsbad Planning Department
2075 Las Palm Dr.
Carlsbacl, CA 92009
RE: Real Property Services Corp.
1 935 Camino Yida Roble
hr Wllma:
Pursuant to your request please find enclosed the follwing synopsis of demand for public facilities
created by our proposal project.
City Administrative Facilities none anticipated
Library clone. anticipated
Wastewater Treatment clone anticipated
Parks mitigated at .50/sf mitigated with $.501s.f. park fee
Orai nage existing 18" storm drain on site of sufficient
size.
Circulation 16 ADTI 1000 sf. 656 &DT
Fi re none anticipated
schmls clone antici psted
Sever Collection System Estimated 250 fixture units
Water Distribution System Estimated 250 fixture units
If you should require any additional information pleas contact me.
i'
"carry pb
Austin, Hansen Fehlman Group
ASSOCIATES.
BILL CARPENTER
DON PENNINGTON. AIA LPzj
9605 SCRANTON RD.
SUITE 202
SAN DIEGO, CA 92 12 1
(619) 458-1361
CITY OF CARLSBAD
DEVELOP, PROC, SERV. DIV,