Loading...
HomeMy WebLinkAboutPIP 87-13; Carlsbad Airport Center Lot 4 Unit 1; Planned Industrial Permit (PIP) (4)AUSTIN HANSEN FEHLMAN -GROUP- ARCHITECTURE INTERIOR DESIGN LAND PLANNING URBAN DESIGN ARCHITECTURE LANDSCAPE ENGINEERING STRUCTURAL DOUGLAS AUSTIN.AIA DONALD HANSEN,AIA MARK FEHLMAN, AIA RANDY ROBBINS, AIA RAND1 COOPERSMITH February 4,1988 Wilma Diepersloot City of Carlsbad Planning Department 2075 Las Palm Dr. Carlsbacl, CA 92009 RE: Real Property Services Corp. 1 935 Camino Yida Roble hr Wllma: Pursuant to your request please find enclosed the follwing synopsis of demand for public facilities created by our proposal project. City Administrative Facilities none anticipated Library clone. anticipated Wastewater Treatment clone anticipated Parks mitigated at .50/sf mitigated with $.501s.f. park fee Orai nage existing 18" storm drain on site of sufficient size. Circulation 16 ADTI 1000 sf. 656 &DT Fi re none anticipated schmls clone antici psted Sever Collection System Estimated 250 fixture units Water Distribution System Estimated 250 fixture units If you should require any additional information pleas contact me. i' "carry pb Austin, Hansen Fehlman Group ASSOCIATES. BILL CARPENTER DON PENNINGTON. AIA LPzj 9605 SCRANTON RD. SUITE 202 SAN DIEGO, CA 92 12 1 (619) 458-1361 CITY OF CARLSBAD DEVELOP, PROC, SERV. DIV,