Loading...
HomeMy WebLinkAboutPIP 88-03; Carlsbad Oaks East Lot 36; Planned Industrial Permit (PIP) (3)i c 2075 LAS PALMAS DRIVE CARLSBAD, CA 92009-4859 TELEPHONE (619) 438-1 161 May 20, 1988 PLANNING DEPARTMENT Tom Aubry Krommenhock/McKeown 61 Associates 1515 Morena Boulevard San Diego, CA 92110 This is to inform you that the items previously requested to make your Planned Industrial Permit, application no. PIP 88-3, complete have been received and reviewed by the Planning Department. It has been determined that the application is now complete for processing. Although the initial processing of your application may have already begun, the technical acceptance date is acknowledged by the date of this communication. Plehse note that although the application is now considered complete, there may be issues that could be discovered during project review and/or environmental review. Any issues should be resolved prior to scheduling the project for public hearing. In addition, the City may request, in the course of processing the application, that you clarify, amplify, correct, or otherwise supplement the information required for this application. The Planning Department will begin processing your application, as of the date of this communication. Please contact Wilma Diepersloot, at (619) 438-1161, if you have questions or wish additional information. Sincerely, MICHAEL J. -HOLZ~ILLER Planning Director MJH: WJD/af cc: Charles Grim Mark Granich IJST OF 1- NEEDED To COHPLE!l'E APPLICATION: 1. Detailed information for designated lunch areas (i.e., furniture, landscaping). 2. Need corrected elevations - west and east elevations are opposite of that shown on map. There are also major issues that must be addressed or resolved for this project. These include: 1. Circulation must be designed per CALTRANS 407D turning template and City standards. 2. Verify proper location of proposed driveway per master driveway location map. 3. Landscaped parking medians are required per Specific Plan. 4. West and south elevations must comply with architectural standards of the Specific Plan.