HomeMy WebLinkAboutPIP 88-04; Carlsbad Airport Business Center Lot 6; Planned Industrial Permit (PIP) (2)2560 ORION WAY
CARLSBAD, CA 92008 TELEPHONE (019) 931-2141
Citp of QCarIsbab
FIRE DEPARTMENT
October 31, 1988
RECEIVED.
NOV 2 1988
lirian Paul L? Associpk, Inc.
Brian Paul & Associates
4350 La Jolla Village Dr., Ste. 430
San Diego, CA 92122-1233
Attention: John Roll
.CARLSBAD AIRPORT CENTER, LOT 6
Per yourrequest, I haveindicatedappropriatelocations forhydrants and fire sprinkler components with additional details below.
1.
2.
3.
4.
Fire flow requirement from on site hydrant 1500 gpm. Total fire
flow required 1600 gpm.
On site hydrant required as noted on plan.
Detector check valve assembly, automatic sprinkler connection
and sprinkler control valve be located in one of three
locations indicated on plan as
Allhydrants, mains anddetector check valve assemblies shallbe constructed and installed per water district specifications.
MICHAEL SMITH
Fire Marshal
cb