Loading...
HomeMy WebLinkAboutPIP 88-04; Carlsbad Airport Business Center Lot 6; Planned Industrial Permit (PIP) (2)2560 ORION WAY CARLSBAD, CA 92008 TELEPHONE (019) 931-2141 Citp of QCarIsbab FIRE DEPARTMENT October 31, 1988 RECEIVED. NOV 2 1988 lirian Paul L? Associpk, Inc. Brian Paul & Associates 4350 La Jolla Village Dr., Ste. 430 San Diego, CA 92122-1233 Attention: John Roll .CARLSBAD AIRPORT CENTER, LOT 6 Per yourrequest, I haveindicatedappropriatelocations forhydrants and fire sprinkler components with additional details below. 1. 2. 3. 4. Fire flow requirement from on site hydrant 1500 gpm. Total fire flow required 1600 gpm. On site hydrant required as noted on plan. Detector check valve assembly, automatic sprinkler connection and sprinkler control valve be located in one of three locations indicated on plan as Allhydrants, mains anddetector check valve assemblies shallbe constructed and installed per water district specifications. MICHAEL SMITH Fire Marshal cb