HomeMy WebLinkAboutPIP 88-09; Mission West Properties; Planned Industrial Permit (PIP) (11)2075 US PALMAS DRIVE- CARLSBAD, CA 92009-4859 Mitg af Glnrlsbnh PLANNING DEPARTMENT TELEPHONE (619) 438-1 161 October 7, 1988 Krommenhoek/McKeown & Associates 1515 Morena Boulevard San Diego, CA 92110 Thank you for applying for Land Use Permits in the City of Carlsbad. The P1 anning Department has reviewed your P1 anned Industri a1 Permit, appl i cation no. PIP 88-9, as to its completeness for processing. The application is incomplete, as submitted. Attached are two lists. The first list is information which must be provided to complete your application. The second 1 i st is issues of concern to staff. To help speed processing of the application, it is suggested that each item on the lists be rectified or addressed in a letter to your staff planner. You should be aware that no processing of your appl ication can occur until the appl ication is determined to be compl ete. Please contact you staff planner, Lance Schulte, at (619) 438-1161, if you have any questions or wish to set up a meeting to discuss the application. Sincerely, k. MICHAEL J. HOLZMILLER P1 anning Director WJH:LBS/af cc: Charles Grimm Mark Granich Clyde Wickham ” LIST OF ITEMS NEEDED TO COMPLETE APPLICATION: PIP 88-9 1. Disclosure form and PFF Agreements are inconsistent. Is the owner a pub1 ic 2. Existing contours along Camino Vida Roble not provided. 3. Location of all buildings within 100 feet not provided. 4. Grading quantities not provided. 5. Please indicate landscape maintenance responsibility. 6. Clear indication of area devoted to manufacturing, warehouse land use on 7. Signage not shown on building elevations. 8. A Hill side Development Permit is needed as per 21.95 of the Carlsbad corporation or a partnership. Please revise and be consistent. floor plans. Mun i c i pal Code. ISSUES OF CONCERN PLANNING: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Use of crib and retaining walls. Adequacy of lunch areas as per 21.34.070(3). Intrusion of road without screening into 50‘ setback along Camino Vida Rob1 e. Justification for use of 2.5’ overhang for parking spaces. Need to create unique yet unified identity for each building through site design, building graphics and landscaping. Legal mechanism to assure proposed 1 and use and ADT and parking demands. Building across lot lines. Accuracy, quality and quantity of proposed landscaping. Appearance of loading doors adjacent to front entrances. Colors and detailing of buildings. LIST OF ITEMS NEEDED TO COMPLETE APPLICATION: PIP 88-9 ENGINEERING : 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. All easements shownlplotted. Dimensioned location of service areas, and loading areas. Distances between adjacent buildingslstructures, Location, height and materials of walls (retaining and crib type). All driveways and streets within 100' of project limits. Existing curb, gutter and sidewalks within 100'. Watercourses (incl. 100 yr. flood zone). Typical street sections -( incl. access and parking isles). Exist. contours and proposed contours (not clear on Lot 7). Existing and proposed utilities within 100' of site. ISSUES OF CONCERN: ENGINEERING: 1. Excessive amount of "re-grading". 2. Encroachment into influence of 2 : 1 slope. 3. Stability/geotechnical analysis of design. 4. Encroachment into existing drainage channel. (Retaining wall and parking lot). 5. Limits of 100 year floodway. 6. Alignment of driveways, compliance with Department policy #22 (attached for reference). 7. On-site circulation, 407-D and 407-E truck templates (attached for reference). 8. Congestion of drivewaylentrance. -