HomeMy WebLinkAboutPIP 88-09; Mission West Properties; Planned Industrial Permit (PIP) (5)MEMORANDUM
May 12, 1989
TO: PLANNING DEPARTMENT
FROM LAND USE REVIEW DMSION
PROJECT REPORT AND CONDITIONS FOR PIP 88-09, MISSION WEST
Engineering Department has completed its review of this project and hereby recommend approval
subject to the following conditions:
(Standard
Condition
Number)
Pretreatment of the sanitary sewer discharge from this project may be required. In addition
to the requirements for a sewer connection permit the developer shall conform to the
requirements of Chapter 13.16 of the Carlsbad Municipal Code. The developer shall apply
for an industrial waster discharge permit concurrently with the building permit for this project.
No Certificates of Occupancy for the project will be issued before the industrial waste
discharge permit application requirements have been met, all applicable fees paid and permit
issued.
The developer shall obtain a grading permit prior to the commencement of any clearing or
grading of the site.
This project has been reviewed for conformancy with the grading ordinance and found to be
a project for which a grading permit is required. Prior to any building permits being issued
for the site a grading plan in conformance with City Standards and Section 11.06 of the
Carlsbad Municipal Code must be submitted, approved and grading work must be completed
to the satisfaction of the City Engineer. All slopes within this project shall be graded no
steeper than two horizontal to one vertical unless specifically approved otherwise pursuant to
these conditions.
No grading shall occur outside the limits of the project unless a letter of permission is obtained
from the owners of the affected properties.
PAGE 2
Prior to the issuance of grading or building permits the applicant shall process waterline
improvement plans, post the necessary bonds, and secure appropriate dedication of the
proposed fire hydrant system as shown on the approved site plan.
26. Unless a standard variance has been issued, no variance from City Standards is authorized
by virtue of approval of this site plan.
31. The developer shall comply with all the rules, regulations and design requirements of the
respective sewer and water agencies regarding services to the project.
34. This project is approved specifically as 1 (single) phase.
40. The developer shall be responsible for coordination with S.D.G.&E., Pacific Telephone, and
Cable TV authorities.
41. The applicant shall agree to utilize reclaimed water, in Type I form, on the subject property
in all common areas as approved by the City Engineer.
43. Irrigation systems to accommodate future reclaimed water shall be designed consistent with
Title 17 of the California Administrative Code. Offsite future reclaimed water distribution
systems should be anticipated by the installation of adequately sized sleeves at crossing points
to minimize street excavation.