Loading...
HomeMy WebLinkAboutPIP 88-09; Mission West Properties; Planned Industrial Permit (PIP) (5)MEMORANDUM May 12, 1989 TO: PLANNING DEPARTMENT FROM LAND USE REVIEW DMSION PROJECT REPORT AND CONDITIONS FOR PIP 88-09, MISSION WEST Engineering Department has completed its review of this project and hereby recommend approval subject to the following conditions: (Standard Condition Number) Pretreatment of the sanitary sewer discharge from this project may be required. In addition to the requirements for a sewer connection permit the developer shall conform to the requirements of Chapter 13.16 of the Carlsbad Municipal Code. The developer shall apply for an industrial waster discharge permit concurrently with the building permit for this project. No Certificates of Occupancy for the project will be issued before the industrial waste discharge permit application requirements have been met, all applicable fees paid and permit issued. The developer shall obtain a grading permit prior to the commencement of any clearing or grading of the site. This project has been reviewed for conformancy with the grading ordinance and found to be a project for which a grading permit is required. Prior to any building permits being issued for the site a grading plan in conformance with City Standards and Section 11.06 of the Carlsbad Municipal Code must be submitted, approved and grading work must be completed to the satisfaction of the City Engineer. All slopes within this project shall be graded no steeper than two horizontal to one vertical unless specifically approved otherwise pursuant to these conditions. No grading shall occur outside the limits of the project unless a letter of permission is obtained from the owners of the affected properties. PAGE 2 Prior to the issuance of grading or building permits the applicant shall process waterline improvement plans, post the necessary bonds, and secure appropriate dedication of the proposed fire hydrant system as shown on the approved site plan. 26. Unless a standard variance has been issued, no variance from City Standards is authorized by virtue of approval of this site plan. 31. The developer shall comply with all the rules, regulations and design requirements of the respective sewer and water agencies regarding services to the project. 34. This project is approved specifically as 1 (single) phase. 40. The developer shall be responsible for coordination with S.D.G.&E., Pacific Telephone, and Cable TV authorities. 41. The applicant shall agree to utilize reclaimed water, in Type I form, on the subject property in all common areas as approved by the City Engineer. 43. Irrigation systems to accommodate future reclaimed water shall be designed consistent with Title 17 of the California Administrative Code. Offsite future reclaimed water distribution systems should be anticipated by the installation of adequately sized sleeves at crossing points to minimize street excavation.