Loading...
HomeMy WebLinkAboutPIP 89-03; Davison-Jones Development; Planned Industrial Permit (PIP) (7). MEMORANDUM May 8, 1989 TO: PLANNING DEPARTMENT FROM LAND USE ENGINEERING DIVISION PROJECT REPORT AND CONDITIONS FOR DAVIDSON AND JONES PIP 89-03 The Engineering Department has completed its review of the subject project and hereby recommends approval subject to the following conditions: 1. 10. 12. 26. 31. 40. Pretreatment of the sanitary sewer discharge from this project may be required. In addition to the requirements for a sewer connection permit the developer shall conform to the requirements of Chapter 13.16 of the Carlsbad Municipal Code. The developer shall apply for an industrial waste discharge permit concurrently with the building permit for this project. No Certificates of Occupancy for the project will be issued before the industrial waste discharge permit application requirements have been met, and the permit issued. Prior to hauling dirt or construction materials to any proposed construction site within this project the developer shall submit to and receive approval form the City Engineer for the proposed haul route. The developer shall comply with all conditions and requirements the City Engineer may impose with regards to the hauling operation. Additional drainage easements and drainage structures shall be provided or installed as may be required by the City Engineer. Unless a standard variance has been issued, no variance from City Standards is authorized by virtue of approval of this site plan. The developer shall comply with all the rules, regulations and design requirements of the respective sewer and water agencies regarding services to the project. The developer shall be responsible for coordination with S.D.G.&E., Pacific Telephone, and Cable TV authorities. Custom Condition: 1. This project has been reviewed for conformance with the grading ordinance and found to be a project for which a grading permit is required . Prior to any building permits being issued on the site a grading plan in conformance with City Standards and Section 11.06 of the Carlsbad Municipal Code must be submitted, approved and grading work must be completed to the satisfaction of the City Engineer. All slopes within this project shall be graded no steeper than two horizontal to one vertical unless specifically approved otherwise pursuant to these conditions. L t c h 2. An additional onsite fire hydrant is required for this project. The developer shall prepare water system improvement plans and a public water easement to the satisfaction of the City Engineer and the Water District Engineer prior to the issuance of a building permit for the project. Appropriate plan check fees shall be paid and securities posted.