Loading...
HomeMy WebLinkAboutPIP 89-06; Bassi Court; Planned Industrial Permit (PIP) (8)Citv of Carlsbad April 12. 1989 Plant and Cook, Inc. 2385 Camino Vida Roble, #lo7 Carlsbad, CA 92009 RE: PIP 89-6 - BASSI COURT (LOT 4 OF MINOR SUBDIVISION NO. 7831 - ENGINEERING DEPT. COMPLETENESS REVIEW AND ISSUES The Engineering Department has completed its review of the subject project for application completeness. The application and plans submitted for this project are incomplete and unsuitable for further review due to the following reasons: 1. 2. 3. 4. 5. 6. You will need to submit a preliminary 'title report and show all easements. Show existing curbs, gutters, sidewalks, etc., for Camino Vida Roble. Also show proposed improvements for your private cul-de-sac, Show typical street sections for Camino Vida Roble and your private cul-de-sac. spot elevations. Also show existing and proposed drainage You will need to show existing and proposed contousand provide facilitieslflow lines. Show existing utilities; water, sewer mains and storm drains. Also show your proposed laterals. You need to dimension your parking lot aisles and driveway. of the project for Engineering issues. (See attached initial review In addition, the Engineering Department made a preliminary review and assessment checklist.) Major engineering issues which will as follows: need to be resolved or adequately addressed for this project are 2075 Las Palrnas Drive - Carlsbad. California 92009-4859 (619) 438-1 161 Plant and Cook, Inc. RE: PIP 89-6 April 12, 1989 Page 2 1. You will need to provide on-site circulation (show) 407E Caltrans truck turning radii (42 ft.) to and from your trash enclosure and your truck loading area. You also need to provide and show either rear loading or side loading (8 ft. x 40 ft. area). Site loading area and circulation will - not work as shown. - Also please find the included check print no. "1" for your use. Please return the check print with your resubmittal to assist us in our continued review. JIM MURRAY Associate Civil Engineer JM:jb C: Chris Griffin (Project Planner)