Loading...
HomeMy WebLinkAboutPIP 89-08A; Floral Trade Center; Planned Industrial Permit (PIP) (2)" of Carlsbad March 11, 1991 Carlmart Limited Partnership 5600 Avenida Encinas, Suite 100 Carlsbad, CA 92008 This is to inform you that the items previously requested to make your Planned Industrial Permit Amendment, application no. PIP 89-8(A), complete have been received and reviewed by the Planning Department. It has been determined that the application is now complete for processing. Although the initial processing of your application may have already begun, the technical acceptance date is acknowledged by the date of this communication. Please note that although the application is now considered complete, there may be issues that could be discovered during project review and/or environmental review. Any issues should be resolved prior to scheduling the project for public hearing. A list of these issues is attached. In addition, the City may request, in the course of processing the application, that you clarify, amplify, correct, or otherwise supplement the information required for this application. The Planning Department will begin processing your application, as of the date of this communication. Please contact Mike Grim, at (619) 438-1 161 ext. 4499, if you have questions or wish additional information. Sincerely, GARY E. WAYNE Assistant Planning Director GEW:MG:km cc: Robert Greene Don Neu Erin Letsch Bob Wojcik Jim Murray Data Entry ?q 2075 Las Palmas Drive - Carlsbad. California 92009-4859 - (619) 438-1 161 ISSUES OF CONCERN 1. Your proposed truck loading areas do not meet the City's Design Standards for Multi-tenant Industrial Buildings (Plan. Policy No. 22). Your proposed tenant spaces are less than 24 ft. in width, therefore you must provide: a. A 44 inch wide (minimum) pedestrian access lane between the building and the loading area. b. An 8 foot wide loading area the entire length of the building. Your proposal creates conflicts with the required 24 ft. circulation (see check print). Also your 2 proposed east facing "end doors" would be required to each provide a 10 foot wide x 30 foot long perpendicular loading area which will block and conflict with the 2 adjacent (north facing doors) in each case (see check print). 2. Your plans show the existing earthen drainage ditch along the west side of your property as being an "existing concrete lined drainage channel. The channel has never been concrete lined even though it was a condition of approval of the original PIP 89-8. The building plans for Pacific Point SDP 89-2 - CB 90-438 show the ditch construction as an off-site improvement but the SDP 89-2 does not have the construction of the ditch as a condition. If this ditch is not concrete lined by the time this PIP 89-8(A) is ready to be conditioned, it will be a condition of this projects approval. 3. You need to correctly show the locations of pending ultimate improvements along Avenida Encinas on your site plan (S-1). You also need to dimension and show the proposed size and type of stormdrain for the truck parking area along the west side of the project. 4. Your west elevation needs to be corrected to show your latest proposed roll-up door locations. 5. Landscape plans do not show the truck parking over the drainage channel. This will need to be heavily screened s it is visible from the Carlsbad Boulevard overpass. 6. A materials board is still needed. 7. The same degree of screening currently on the north side of the project site will be needed. Specimen trees will be required as part of the landscape plan approval.