July 6, 1989
Mark Langan
Smith Consulting Architects
9868 Scranton Rt^. , Suite 150
San Diego, CA 92121
Re: Carlsbad Airport Centre - Lot 3, APN 212-092-17
Water Availability - CMWD Project No. 89-C.306
Dear Mr. Langan:
The subject project is located within the Carlsbad Municipal
Water District service area. Water service can be made available
to each lot/unit that may be developed at the time an application
for service is completed, and all applicable fees are paid.
The applicant shall meet the conditions of the Carlsbad
Municipal Water District and its Water Master Plan. Installation
of any facilities shall be in accordance with the District's
"Standard Plans and Specifications" dated January 1987.
The entire water system be evaluated in detail as assurance
that adequate capacity for domestic landscaping and fire flow de-
mands are addressed.
Developer/Owner shall meet with the Fire Marshal and the
District Engineer and meet all requirements to provide fire and
domestic flow and will pay all costs associated with providing
said service.
Regarding fees and deposits: The developer will be respon-
sible for the major facility charge which will be collected at
time of issuance of building permit. Please contact the under-
signed if you have any questions regarding this project.
Very truly yours,
F. Deriy Whitley
Engineering Manager
FJW:jcm
CMWD 89-C.306
"Serving Carlsbad for over 35 years"
LAND USE ENGINEERING
_ PROJECT REPORT'
Project TD tP\'{?^ Prepared By_^teg^
Project Name'PPet<='i<:- "B-^o/^A Cr^t^U.isQI£ de^Jir2-€ Approved By
Location: 1^4^ [^SoiuTxPfcy < <^4'7 f SUU^IOfca ES> CAMltOC^ p/^p^ p
Brief Description; OKJV ^ .gy-yt^A^jg- <y>7r /«»pi?<'cA? a<3<U^tOfea, ,06^^
Discussion of Engineering Issues: ^ ^(-TS^^ ) ^ ^a-Aisr ^ _
Traffic: Projected ADT ^c^^ /bi ZS/i^ f>.f. IM^r.) ' /So P^>I J
Adequacy of Existing System -THg feX/a'iPia g>Yt>TgH AcagpoAfftT
Onsite Circulation and Access: •Tl4-e gtj€>/T& Cii2iCLOLAriON:>
Required Improvements Onsite "fifes gg:^(g^ OP^/P^ jMPfgOY€Tue^r5
gpgcx^ A P<RieK-/AJfc> trrr f^/iTxi^.o ixJ^t^e^ i^es^ izi -The. ?=7gi??=r.
Off Site '^•H&iiAC Atgjc- P^D <Qf=«g^-rag' ggspu/fSgMe^MTg. ig^pg -WtS
Sewer: EDU's RequireduDMt.e^,f lev z-^^i^*/>s/>io » e>.-2, > ^
Adequacy bf Existing System -TVf^ p<yfsr7iUfei ^uJHg- ^vsnsM iS
Required Upgrades/Improvements ss6ui^
Grading; Quantity: Cut7'SQ CY Fill "7^^ CY Export/Import.
Permit Required; Yes CNO>
Offsite Approval Required: Yes
Hillside Grading Requirements Met: ^Yes) No
Soils and Geologic Conditions -rirs 'TTPB (e> LOCfrTBT^ f\
Speci a r^radi ng Requi rements/Mi tigation.
^ -m-p. l'S>-&imML>ag g)F BOiU^tUa '•yfgj^i-T^,
Qr^^naqe and Erosion Control: c^ooc iC^
Adequacy of Downstream Improvements -^TUs- Bct^TTpfe? Ty^^Jl30<?f^7 f>6>ju
T^(D>g. T>gr>Posg:D use.
Medium High Erosion Potential: (^To^
Required Improvements:
Drainaoe--nti''=^ -pQ^K&rx ggrao/g-ep -ID or^srHu^r g>PSfn=
Erosion Control ^rrtvao&x'xi?^^ g=ggi&/qK^ /i£»Jn2£5U h-jgr^top^ /'j^^t t
Water District: C^tsatvp
Adequacy of Existing System -msg^scvJT
Required Improvements (zgeptjirt^gT^ T/viPigra^MF-QTs.
Land Title:
Conflicts with Existing Easements: Yes
Site boundary coincides with Land Title TYesJ
Explanation of Conflicts or Problems 6x>w3>g
No
Special Easement Requirements/Mitigation