Loading...
HomeMy WebLinkAboutPIP 89-13; Mercotac; Planned Industrial Permit (PIP) (10)c December 7, 1990 -. TO: FILE PIP 89-13 FROM: PRINCIPAL CIVIL ENGINEER ENGINEERING STANDARDS VARIANCE DRIVEWAY LOCATION LOCATION: VARIANCE: REASON: STAFF DETERMINATION: EXPLANATION: 44-+2fr+ ROBERT J. WOJCIK Principal Civil Engineer Northwest corner of Corte Del Cedro/Corte De La Pina-Lot 6 of Carlsbad Tract No. 79-1 4, APN 21 3-070-06. Locate driveway within 10 feet (1.5 feet) of the catch basin on Corte del Cedro. (Engineering Standard Page 35(4)(E)) The driveway is located at the approved access point to the project. The previously graded pad has 2:l slopes on two sides, with the exception of the driveway location, and existing structures on the remaining two. The curb inlet is located too close to the property line to allow a minimum size driveway (24’) to meet required distance from the property line and the catch basin. Approved Due to the access constraints, the driveway must be located at this location. To protect the catch basin, a G-17 Alley Apron will be used rather than the standard (G-14) concrete driveway. A five foot radius will allow smooth entry and exit. The beginning of the radius will be located a minimum 1.5 feet from the curb inlet. RJW:SLH:rz c: Tim Fennessey