Loading...
HomeMy WebLinkAboutPIP 89-14; Carlsbad Oaks East Lot 25; Planned Industrial Permit (PIP) (12)CASE il_WB£r(l DATE: ENVIRONMENTAI IMPACT ASSESSMENT FORM - PART I (To be Completed by APPLICANT) Applicant: Davison & Partners Address of Applicant: 4199 Campus Drive Suite 830 Irvine. CA. 92715 Phone Number: (714 ) 854-4600 Name, address and phone number of person to be contacted (if other than Applicant): Dennis Bonds HCH Partners 4877 Viswridas Ave. San Diego, CA. 92123 (619) 278-5750 GENERAL INFORMATION: (Please be specific) Project Description: 5 shell buildings for office/ warehouse use. Project Location/Address: North side of Loker Avenue east between SP3 ntter Place and El Fuente Street Assessor Parcel Number: 209 - 082 - 08 General Plan/Zone of Subject Property: Planned Industrial / PM Local Facilities Management Zone: 5 Is the site within Carlsbad's Coastal Zone? No Please describe the area surrounding the site to the North: Varant/ PM Zone East: Vacant/ PM Zone South: Vsrant/ PM Zone West: Vacant/ PM Zone List all other applicable permits i approvals related to "this projectr Planned Industrial Pennit- Pending (Please be SpecifAttach Additional Paiji' i (ii '(^ph^^'i ^f necessary) Please describe the project site, including distinguishing natural and manmade characteristics. Also provide precise slope analysis when a slope of 15' br higher and 15% grade or greater is present on the site. Vacant site with pad, no distinguishing characteristics See grading plan for slopes at perimeter. Please describe energy conservation measures incorporated into the design and/or operation of the project. Buildings will have reflective glazing Project shall comply with CAC Title 24 energy requirements. PLEASE ATTACH A PROJECT SUWARY SHEET WHICH SHOWS THE FOLLOWING: a. If a residential project identify the number of units, type of units, schedule of unit sizes, range of sale prices or rents, and type of household size expected, average daily traffic generation (latest SANDAG rates). If a commercial project, indicate the exact type, activity(ies), square footage of sales area, average daily traffic generation (latest SANDAG rates), parking provided, and loading facilities. If an industrial project, indicate the exact type or industry(ies), average daily traffic generation (latest SANDAG rates), estimated employment per shift, time of shifts, and loading facilities. Project is a shell building so information is unknown. d. If an institutional project, indicate the major project/site function, estimated employment per shift, estimated occupancy, loading facilities, and community benefits to be derived from the project. ENVIRONMENTAL IMPACT ANALYSIS Please Answer each of the following questions by placing a check in the appropriate space. Then, fully discuss and explain why each item was checked yes or no. Provide supporting data if applicable. Attach additional sheets as necessary. YES NO 1) Could the project significantly impact or change present or future land uses in the vicinity of the activity? EXPLANATION: Surrounding area is all zoned Industrial (PM) 2) Could the activity affect the use of a recreational area, or area of aesthetic value? EXPLANATION: There are no areas of this type in the vicinity. 3) Could the activity affect the functioning of an established community or neighborhood? EXPLANATION: Neighborhood is intended for Industrial use. 4) Could the activity result in the displacement of community residents? EXPLANATION: No one resides in the area. YES NO 5) Could the activity increase the number of low and moderate cest housing units in the city? EXPLANATION: 6) Could the activity significantly affect existing housing or create a demand for additional housing? EXPLANATION: Project will draw from existing workforce. 7) Are any of the natural or man-made features in the activity area unique, that is, not found in other parts of the county, state or nation? EXPLANATION: It is a padded site with no unique features. 8) Could the activity significantly affect an historical or archaeological site or its settings? EXPLANATION: There is nothing on the site of historical or archaeological significance. 9) Could the activity significantly affect the potential use, extraction, or conservation of a scarce natural resource? EXPLANATION: There are no natural resources on the site. YES NO 10) Could the activity significantly affect fish, wildlife or plant resources? EXPLANATION: There are no fish, wildlife, or plant resources on the site. 11) Are there any rare or endangered plant or animal species in the activity area? EXPLANATION: There are no endangered plant or animal species in the activity area. 12) Could the activity change existing features of any of the city's stream, lagoons, bays, tidelands or beaches? EXPLANATION: No streams, lagoons, bays, tidepools or beaches enter the site. 13) Could the activity result in the erosion or elimin- ation of agricultural lands? EXPLANATION: No agricultural lands are part of the project . 14) Could the activity serve to encourage development of presently undeveloped areas or intensify develop- ment of already developed areas? EXPLANATION: The project is in an existing developed area that allows an intensity greater than what is proposed. YES NO 15) Will the activity require a variance from estab- lished e'nvironmental standards (air, water, noise, etc.)? EXPLANATION: No variance will be needed. 16) Is the activity carried out as part of a larger project or series of projects? EXPLANATION: The project being developed is self-contained and complete. 17) Will the activity require certification, authoriza- tion or issuance of a permit by any local, state or federal environmental control agency? EXPLANATION: None will be required. 18) Will the activity require issuance of a variance or conditional use permit by the City? EXPLANATION: The area is zoned for the proposed activity. 19) Will the activity involve the application, use, or disposal of potentially hazardous materials? EXPLANATION: The buildings are shell only. _ _ YiS NO 20) Will the- activity involve construction of facilities in a flood plain? ^ EXPLANATION: The site is not in a flood plain. 21) Will the activity involve construction of facilities in the area of an active fault? EXPLANATION: The site is not in a fault area. 22) Could the activity result in the generation of significant amounts of dust? EXPLANATION: During construction appropriate mpa'=;ijrps will be taken to control dust. 23) Will the activity involve the burning of brush, trees, or other materials? EXPLANATION: The proposed activities do not involve hiirning nf brush, trees, etc. 24) Could the activity result in a significant change in the quality of any portion of the region's air or water resources? (Should note surface, ground water, off-shore.) EXPLANATION: The buildings are shell only. YES NO 25) Will the project substantially increase fuel consumption (electricity, oil, natural gas, etc.)? EXPLANATION: The increase will be minimal. 26) Will the activity involve construction of facilities on a slope of 25 percent or greater? EXPLANATION: Nothing will be constructed on nr orpnter sloues. 27) Will there be a significant change to existing land form? (a) Indicate estimated grading to be done in cubic yards: 5fCr<3ro CUT 4 ^,<jx>o f=/L<^ (b) Percentage of alteration to the present land form: Minimal . (c) Maximum height of cut or fill slopes: riitr fill: 5.5' . EXPLANATION: 28) Will the activity result in substantial increases in the use of utilities, sewers, drains or streets? EXPLANATION: Onlv to the extent it was intended. YES NO 29) Will the project significantly increase wind or water eros^ion of soils? X EXPLANATION: Planting will minimize the possibility nf erosion. 30) Could the project significantly affect existing fish or wildlife habitat? EXPLANATION: No habitats exist. 31) Will the project significantly produce new light or glare? EXPLANATION: It will be controlled within the site. 10 II. STATEMENT OF fl|^"TrflTriCANT ENVIRONMENTAL EFFlj^K If you have answered yes to any of the questions in Section I but think the activity will have no significant environmental effects, indicate your reasons'below: III. COMMENTS OR ELABORATIONS TO ANY OF THE QUESTIONS IN SECTION I (If additional space is needed for answering any questions, attach additional sheets as needed.) Sianature | V^^/^NX f/Pi^f^h f ^ (Person Completing Report) Date Signed I i - I Instruct.eia LBS:lh 11