ENVIRONMENTAI IMPACT ASSESSMENT FORM - PART I
(To be Completed by APPLICANT)
Applicant: Davison & Partners
Address of Applicant: 4199 Campus Drive Suite 830
Irvine. CA. 92715
Phone Number: (714 ) 854-4600
Name, address and phone number of person to be contacted (if other than
Applicant): Dennis Bonds HCH Partners
4877 Viswridas Ave. San Diego, CA. 92123 (619) 278-5750
GENERAL INFORMATION: (Please be specific)
Project Description: 5 shell buildings for office/ warehouse
use.
Project Location/Address: North side of Loker Avenue east between
SP3 ntter Place and El Fuente Street
Assessor Parcel Number: 209 - 082 - 08
General Plan/Zone of Subject Property: Planned Industrial / PM
Local Facilities Management Zone: 5
Is the site within Carlsbad's Coastal Zone? No
Please describe the area surrounding the site to the
North: Varant/ PM Zone East: Vacant/ PM Zone
South: Vsrant/ PM Zone West: Vacant/ PM Zone
List all other applicable permits i approvals related to "this projectr
Planned Industrial Pennit- Pending
(Please be SpecifAttach Additional Paiji' i (ii '(^ph^^'i ^f necessary)
Please describe the project site, including distinguishing natural and
manmade characteristics. Also provide precise slope analysis when a slope
of 15' br higher and 15% grade or greater is present on the site.
Vacant site with pad, no distinguishing characteristics
See grading plan for slopes at perimeter.
Please describe energy conservation measures incorporated into the design
and/or operation of the project.
Buildings will have reflective glazing
Project shall comply with CAC Title 24 energy requirements.
PLEASE ATTACH A PROJECT SUWARY SHEET WHICH SHOWS THE FOLLOWING:
a. If a residential project identify the number of units, type of units,
schedule of unit sizes, range of sale prices or rents, and type of
household size expected, average daily traffic generation (latest SANDAG
rates).
If a commercial project, indicate the exact type, activity(ies),
square footage of sales area, average daily traffic generation
(latest SANDAG rates), parking provided, and loading facilities.
If an industrial project, indicate the exact type or industry(ies),
average daily traffic generation (latest SANDAG rates), estimated
employment per shift, time of shifts, and loading facilities.
Project is a shell building so information is unknown.
d. If an institutional project, indicate the major project/site
function, estimated employment per shift, estimated occupancy,
loading facilities, and community benefits to be derived from the
project.
ENVIRONMENTAL IMPACT ANALYSIS
Please Answer each of the following questions by placing a check in the
appropriate space. Then, fully discuss and explain why each item was
checked yes or no. Provide supporting data if applicable. Attach
additional sheets as necessary.
YES NO
1) Could the project significantly impact or change
present or future land uses in the vicinity of the
activity?
EXPLANATION: Surrounding area is all zoned
Industrial (PM)
2) Could the activity affect the use of a recreational
area, or area of aesthetic value?
EXPLANATION: There are no areas of this type in
the vicinity.
3) Could the activity affect the functioning of an
established community or neighborhood?
EXPLANATION: Neighborhood is intended for
Industrial use.
4) Could the activity result in the displacement of
community residents?
EXPLANATION: No one resides in the area.
YES NO
5) Could the activity increase the number of low and
moderate cest housing units in the city?
EXPLANATION:
6) Could the activity significantly affect existing
housing or create a demand for additional housing?
EXPLANATION: Project will draw from existing
workforce.
7) Are any of the natural or man-made features in the
activity area unique, that is, not found in other
parts of the county, state or nation?
EXPLANATION: It is a padded site with no unique
features.
8) Could the activity significantly affect an
historical or archaeological site or its settings?
EXPLANATION: There is nothing on the site of
historical or archaeological significance.
9) Could the activity significantly affect the
potential use, extraction, or conservation of a
scarce natural resource?
EXPLANATION: There are no natural resources
on the site.
YES NO
10) Could the activity significantly affect fish,
wildlife or plant resources?
EXPLANATION: There are no fish, wildlife, or plant
resources on the site.
11) Are there any rare or endangered plant or animal
species in the activity area?
EXPLANATION: There are no endangered
plant or animal species in the activity area.
12) Could the activity change existing features of any
of the city's stream, lagoons, bays, tidelands
or beaches?
EXPLANATION: No streams, lagoons, bays, tidepools
or beaches enter the site.
13) Could the activity result in the erosion or elimin-
ation of agricultural lands?
EXPLANATION: No agricultural lands are part of the
project .
14) Could the activity serve to encourage development
of presently undeveloped areas or intensify develop-
ment of already developed areas?
EXPLANATION: The project is in an existing
developed area that allows an intensity greater
than what is proposed.
YES NO
15) Will the activity require a variance from estab-
lished e'nvironmental standards (air, water, noise,
etc.)?
EXPLANATION: No variance will be needed.
16) Is the activity carried out as part of a larger
project or series of projects?
EXPLANATION: The project being developed is
self-contained and complete.
17) Will the activity require certification, authoriza-
tion or issuance of a permit by any local, state
or federal environmental control agency?
EXPLANATION: None will be required.
18) Will the activity require issuance of a variance or
conditional use permit by the City?
EXPLANATION: The area is zoned for the
proposed activity.
19) Will the activity involve the application, use, or
disposal of potentially hazardous materials?
EXPLANATION: The buildings are shell only.
_ _ YiS NO 20) Will the- activity involve construction of facilities
in a flood plain? ^
EXPLANATION: The site is not in a flood plain.
21) Will the activity involve construction of facilities
in the area of an active fault?
EXPLANATION:
The site is not in a fault area.
22) Could the activity result in the generation of
significant amounts of dust?
EXPLANATION: During construction appropriate
mpa'=;ijrps will be taken to control dust.
23) Will the activity involve the burning of brush,
trees, or other materials?
EXPLANATION: The proposed activities do not involve
hiirning nf brush, trees, etc.
24) Could the activity result in a significant change
in the quality of any portion of the region's air
or water resources? (Should note surface, ground
water, off-shore.)
EXPLANATION: The buildings are shell only.
YES NO
25) Will the project substantially increase fuel
consumption (electricity, oil, natural gas, etc.)?
EXPLANATION: The increase will be minimal.
26) Will the activity involve construction of facilities
on a slope of 25 percent or greater?
EXPLANATION: Nothing will be constructed on
nr orpnter sloues.
27) Will there be a significant change to existing
land form?
(a) Indicate estimated grading to be done in
cubic yards: 5fCr<3ro CUT 4 ^,<jx>o f=/L<^
(b) Percentage of alteration to the present
land form: Minimal .
(c) Maximum height of cut or fill slopes:
riitr fill: 5.5' .
EXPLANATION:
28) Will the activity result in substantial increases
in the use of utilities, sewers, drains or streets?
EXPLANATION: Onlv to the extent it was intended.
YES NO
29) Will the project significantly increase wind or
water eros^ion of soils? X
EXPLANATION: Planting will minimize the possibility
nf erosion.
30) Could the project significantly affect existing
fish or wildlife habitat?
EXPLANATION: No habitats exist.
31) Will the project significantly produce new light
or glare?
EXPLANATION: It will be controlled within the
site.
10
II. STATEMENT OF fl|^"TrflTriCANT ENVIRONMENTAL EFFlj^K
If you have answered yes to any of the questions in Section I but think
the activity will have no significant environmental effects, indicate your
reasons'below:
III. COMMENTS OR ELABORATIONS TO ANY OF THE QUESTIONS IN SECTION I
(If additional space is needed for answering any questions, attach
additional sheets as needed.)