Loading...
HomeMy WebLinkAboutPIP 90-03; Upper Deck Company The; Planned Industrial Permit (PIP) (4)h h CARLSBAD OAKS EAST BUSINESS PARK ASSOCIATION FOX NO. (619) 223-2865 Telephone No. (619) 223-1663 3575 Kenyon Street San Diego, CA. 92110 Mailing Address P. 0.Box 80036 San Diego, Ca 92138 September 8, 1994 Mr. Larry Pappas Pappas Design Group 924 Scott Street San Diego, CA 92106 RE: Upper Deck Company Outdoor Basketball Court (Lots 26 and 27) Dear Mr. Pappas: The Architectural Committee has reviewed the conceptual plans for the proposed basket ball court to be located at the end of Sea Otter Place in front of the Upper Deck Building. As submitted the plans are approved. A formal submission to the Architectural Committee will be required for final approval. All terms and conditions as outlined in the Architectural and Development Guidelines and the Declaration of Protective Covenants for Carlsbad Oaks East Business Park will be considered in giving final approval. We have attached a copy of the conceptual plans for review and have retained a copy for our records. Very truly yours. FOR: ARLSBAD E* Woods OAKS EAST BUSINESS PARK ARCHITECTURAL COMMITTEE DEW: eb Encls. CB026UPR.425 I. The private . ho ~es, ; tennis clubs, ;parks and . SUPER SIX BACKBOARD PRO-AM BACKBOARD Rectangular backboard made of %'' clear acrylic that is highly %" thick acrylic with aluminum frame. Great for backyards and low- resistant. The frame is aluminum with a glare-free brushed finish. density clubs. PRESSURE-FLEX GOALTY The best goal made is designed for safety and consistent performance. great for club and backyard usage. Breakaway design has safety and PRESSURE-FLEX JRn Not quite the Pressure-flex, the Jr. looks like the official goal and is Meets all high school and NCAA standards with official 18" ring and playability in mind. %" rim. Very easy to mount. BASKETBALL NETS For any goal -our nets are long lasting and the best made for outdoor use. 3. Surfacing: a. Surface with a four coat Latexite Acrylic playing system b. Owner to select the color of the court. 4. Backboard Equipment: 2 Douglas Super Six System glass boards with 6' extentions 5. cost: a. All materials and labor for the preceding at cost of $23,880. Note: Any and all grading to be done on a time and material bases cost will be $95. per hr. Payment Schedule: 10% upon commencement of work 60% upon placement of slab 20% upon completion of fence . 10% upon completion of job