Loading...
HomeMy WebLinkAboutPIP 93-02; Callaway Golf Test Facility; Planned Industrial Permit (PIP) (11)P: November 15, 1993 Jeffery Gibson, Associate Planner City of Carlsbad, Planning Department 2075 Las Palmas Drive Carlsbad, CA 92009-1576 Subject: Callaway Golf Club Test Facility, PIP 93-2 Dear Mr. Gibson, We have reviewed the available plans for the proposed project by Callaway Golf and have found them to be in conformance with the architectural guidelines set forth by the Carlsbad Airport Center Owners Association. The reviewed documents include the following: 1. Preliminary Civil Plan, dated September 15, 1993, as prepared by Sea Crest Engineering, Inc. 2. Preliminary Floor Plans and Building Elevations, dated September 30, 1993, as prepared by Smith Consulting Architects. 3. Preliminary Landscape Plans as prepared by Van Dyke & Associates. This letter constitutes an approval of the project by Carlsbad Airport Center Owners Association. If I can be of further service or assistance in the development of this project, please do not hesitate to contact me. Sincerely, Leland C. Ayers President 1958 Kellogg Ave. Carlsbad, CA 92008-6581 (61 9) 431-7600 Fax: (61 9) 431-7675