Loading...
HomeMy WebLinkAboutPIP 94-04; Blackmore Airport Centre; Planned Industrial Permit (PIP) (8)December 22, 1994 Smith Consulting Architects Gary Baker 5355 Mira Sorrento Place #750 San Diego CA 92121 SUBJECT: PIP 94-04 - BLACKMORE AIRPORT CENTRE Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning Department has reviewed your Planned Industrial Permit, application no. 94-04, as to its completeness for processing. The application is complete, as submitted. Although the initial processing of your application may have already begun, the technical acceptance date is acknowledged by the date of this communication. The City may, in the course of processing the application, request that you clarify, amplify, correct or othewise supplement the basic information required for the application. In addition, you should also be aware that various design issues may exist. These issues must be addressed before this application can be scheduled for a hearing. The Planning Department will begin processing your application as of the date of this communication. Please find attached a list of items regarding the application that need to be corrected. Please contact your staff planner, Van Lynch, at (619) 438-1161 extension 4325, if you have any questions or wish to set up a meeting to discuss the application. Sincerely, Planning Director c: Gary Wayne Brian Hunter Bobbie Hoder Bob Wojcik ‘File Copy Data Entry Majorie/Rich 2075 Las Palmas Drive Carlsbad. California 92009-1 576 (61 9) 438-1 161 LIST OF CORRECTIONS FOR APPLICATION NO. PIP 94-04 - BLACKMORE AIRPORT CENTRE Plannins 1. 2. 3. 4. 5. 6. 7. 8. The Public Facilities Fee agreement needs to be changed so that the agreement is between Allen Blackmore and the city or The Blackmore Company and the city. The agreement now reads Allen J., Blackmore - The Blackmore Company and the notary is only for Allen J. Blackmore as owner. Stating that Allen J. Blackmore is the owner of the Blackmore Company on the notary would be acceptable. Basically both the agreement and the notary need to match exactly. Attached is the original agreement and a new blank copy. The distance from the rearyard property line to the landscape setback on the Grading and Utilities plan shown as ten feet should read twelve feet. Submittal date should be November 23, 1994. Place Planned Industrial (PIP 94-04) number on plans. The calculations for the parking spaces required need to be rounded up to the next whole number. (Site Plan) Remove the word “PRIVATE” from the note from the conceptual grading plan regarding the construction of the driveway apron. These improvements are within the public right-of-way. A maintenance program for the gravel drainage filter will need to be provided and approved by the city engineer. This is not needed at this time but will be a condition of project approval. Provide on the site plan the proposed truck access turning radius for the two proposed knock-out panels. If access cannot be provided, delete the proposed panels or change the knock-outs to other than truck size access panels.