Loading...
HomeMy WebLinkAboutPIP 94-05; Asymtek Lot 9; Planned Industrial Permit (PIP) (5)January 10, 1995 Bruce Steingraber Progressive Images 24212 Sargeant Road Ramona, CA 92065 SUBJECT PIP 94-05 - ASYMTEK LOT 9 CARLSBAD AIRPORT BUSINESS \ CENTER Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning Department has reviewed your Planned Industrial Permit, Application No. PIP 94-05, as to its completeness for processing. The items requested from you'earlier to make your Planned Industrial Permit, application no. PIP 94-05 complete have been received and reviewed by the Planning Department. It has been determined that the application is now complete for processing. Although the initial processing of your application may have already begun, the technical acceptance date is acknowledged by the date of this communication. Please note that although the application is now considered complete, there may be issues that could be discovered during project review and/or environmental review. Any issues should be resolved prior to scheduling the project for public hearing. In addition, the City may request, in the course of processing the application, that you clarify, amplify, correct, or otherwise, supplement the basic information required for the application. Please contact your staff planner, Terri Woods, at (619) 438-1 161 extension 4447, if you have any questions or wish to set up a meeting to discuss the application. Sincerely, x. . MICHAEL J. HOLZMILLER Planning Director MIHlw:Vd c: Gary Wayne Adrienne Landers Bobbie Hoder Bob Wojcik I File copy Data Entry Marjorie/Rich 2075 Las Palmas Drive - Carlsbad, California 92009-1576 - (619) 438-1 161 @ c ISSUES OF CONCERN NO. PIP 94-05 - ASYMTEK LOT 9 CARLSBAD AIRPORT BUSINESS CENTER 1. Please revise the summary table to reflect existing/proposed zoning (PM). The correct zoning designation was on the previous submittal, however, it was replaced with the General Plan land use designation of Planned Industrial (PI). Both the existing/proposed General Plan land use designation (PI) and existing/proposed zoning designation (PM) are required on the site plan. Also, please revise the summary table site address to reflect a Loker Avenue address. * 2. 3. 4. 5. 6. . 7. 8. As previously requested, please indicate on the grading plan the grading quantities proposed for this project, including the number of cubic yards of cut, fill, import and export. If no grading is proposed, then this should be noted on the grading plan. As previously requested, please indicate on the site plan the location of fire hydrants within 300 feet of the site. If no fire hydrants exist, please note this on- the site plan. The plans indicate a driveway width of 28 feet. As noted previously on the check prints, the minimum driveway width is 30 feet. Please add a dimension indicating a minimum clear distance of 5 feet between the proposed driveway and the existing SDG&E vault. Provisions for drainage, are required for the future loading dock area. The east and south building elevations indicate this loading dock area will have an elevation lower than the remaining parking lot. Please indicate on the grading plan how this area will drain. If the loading dock grading improvements are not planned with initial construction, please clarify this on the site plan and elevations. The building elevations indicate that trucks parked at either end of the future loading dock will be parked on an angle, which is unacceptable. Please revise plans accordingly. This project is to comply with the City’s requirements for the National Pollutant Discharge Elimination System (NPDES) permit. This permit requires the project to provide best management practices to reduce surface pollutants to an acceptable level prior to discharge. Please indicate on the plans as to how this requirement will be met. Attached is a redlined check print set of the project. Please return this set with the corrected plans to assist us in our continued review.