Loading...
HomeMy WebLinkAboutPIP 95-02; Dominie Press; Planned Industrial Permit (PIP) (7)Kenneth D. Smith Architect & Associates 435 W. Bradley Avenue, Suite C El Cajon, CA 92020 444-2182 March 6, 1995 Elaine Blackburn Planning Dept. City of Carlsbad RE: PIP 95-02 RESPONSE TO SUBMITTAL COMMENTS ITEMS NEEDED Planning: 1. The Owners are Ray and Christine Yuen. both the Pacific Center Blvd. and the Caminito Barbuda addresses are valid, but we will show Pacific Center Blvd. as primary address (on plans). let me know if I need to change any forms. 2 3. Address now shown. App. number was added to Site Plan. 4. Corrected headings. 5. Corrected "indoor" 6. Added dimensions to Elevations. 7. Handled via phone call. 8. Title report copies now provided. RECEIVED Engineering: 1. Added utilities to Site Plan. 2. See grading plan. 4. Added street name to street section. 3. See grading plan. 5. See grading plan. 6. See grading plan. Planning: 1. Project is a warehouse facility with no printing. 2. Future dev. unknown. ISSUES OF CONCERN 3. The mechanical unit elevations are shown on the Roof Plan. 4. None 5. No comment 6. No comment 7. Overhang removed. Engineering: 1. See grading plan. 2. See grading plan 3. We've elimingted the separate curb ramp at the street and have widened to dsterly flare of the curb cut to 6'0". This allows handicap access to the walkway by means of a legal 1 :12 slope. Please take a second look.