Loading...
HomeMy WebLinkAboutPIP 95-06; Carlsbad Corporate Centre Lots 33 & 34; Planned Industrial Permit (PIP) (11)MEMORANDUM May 24,1995 TO: SENIOR PLANNER - CHRIS DECERBO FROM: Associate Engineer - Land Use Review VIA: Assistant City Engineer PIP 95-06; FOUR-SHER DEVELOPMENT (LOCATED @ CAMINO VlDA ROBLE - BETWEEN KELLOGG AND OWENS) COMPLETENESS REVIEW AND INITIAL ISSUES STATEMENT Engineering Department staff have completed a review of the above referenced project for application completeness and have determined that the application and plans submitted for the project are incomplete and unsuitable for continued review due to the following incomplete items: 1. 2. 3. 4. 5. The current Preliminary Title Report (PR) indicates that the current owner of the property is the Sumitomo Bank of California. The PR does not indicate that Four-Sher Development has any interest in this property. Therefore, the application must be signed by a representative from Sumitomo Bank. Please add Planned Industrial Permit (PIP) 95-06 to the cover sheet of the Site Development Plan (SDP). Please label all facilities as existing or proposed (e.g., add the existing curb, gutter and sidewalks to the site plan and preliminary Grading Plan, add "existing public street" to the street typical sections on the site plan.) Add the Owens Street typical section to the site plan. As was indicated at our April 26, 1995 meeting with the I applicant, all easements must be identified on the site plan in accordance with Schedule "B" of the PR. The future disposition of the easements must also be indicated on the site plan. Additionally, staff has conducted a review of the project for Engineering issues of concern. Engineering issues which need to be resolvedladdressed prior to staff making a determination on this proposed project are as follows: PIP 95-06; FOUR-SHER D~LOPMENT COMPLETENESS REVIEW AdD INITIAL ISSUES STATEMENT C. DECERBO MEMO; MAY 24,1995 PAGE: 2 Traffic and Tranwortation 1. As previously indicated, the proposed loading bay located at the northeast corner of the building must be able to function utilizing semi-trailer turning radii. A California Department of Transportation (Caltrans) 407C turning template with a 50 ft. turning radius will be required as a minimum; a Caltrans 407D with a 60 ft. turning radius is, however, preferred. Using a standard Caltrans 65 ft. semi-trailer length, neither the 407C nor 407D turning templates function at this proposed loading bay. Therefore, this desiqn must be revised or this loading bav must be deleted. One option for making this loading bay functional is to increase the width and depth approximately 5 ft. and 25 ft., respectively, and, deleting approximately two parking spaces along the rear wall of the building, directly adjacent to the loading bay. Field Conditions 1. Please indicate the location of any monument signs on the site plan. Please be advised that adequate sight distance must be obtained at the public street intersections and facility private driveways. (If no monument signs are proposed, please indicate this to staff.) MaDDinQ/Land Title 2. Add the redesigned location of the northwesterly lunch area to all applicable plans. Drainarre 1. As was indicated at our April 26, 1995 meeting with the applicant, a design for the proposed drainage inlet grease traps must be shown. At the meeting the applicant indicated that they do have a design for this system. Please show a typical grease trap design section on the preliminary (and ultimately the final) grading plans. Attached for the applicants use in making the requested revisions are red lined check prints of the proposed project. These check prints must be returned with the revised plans to facilitate continued staff review. If you or the applicant have any questions, please either see or call me at exten-n 4388. Associate Engineer - Land Use Review Attachment