HomeMy WebLinkAboutPIP 95-06A; PSB Lending Corporation; Planned Industrial Permit (PIP) (5)October 20, 1997
Catherine Cody
Suite A1 44
3914 Murphy Canyon Rd
San Diego 'CA 921 23
SUBJECT: PIP 95-06(A)/PUD 97-14 - PSB LENDING CORP.
Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning
Department has reviewed your Planned Industrial Permit Amendment and Planned Unit
Development Permit, application no. PIP 95-06(A)/PUD 97-14, as to its completeness for
processing.
The application is incomplete, as submitted. Attached is a list is information which must
be submitted to complete your application. This list of items must be submitted directly to
your staff planner by appointment. All list items must be submitted simultaneously and a
copy of this list must be included with your submittals. No processing of your application
can occur until the application is determined to be. complete. A list of issues of concern to
staff will follow in a separate correspondence. When all required materials are submitted
the City has 30 days to make a determination of completeness. If the application is
determined to be complete, processing for a decision on the application will be initiated. In
addition, please note that you have six months from the date the application was initially
filed, September 22, 1997, to either resubmit the application or submit the required
information. Failure to resubmit the application or to submit the materials necessary to
determine your application complete shall be deemed to constitute withdrawal of the
application. If an application is withdrawn or deemed withdrawn, a new application must
be submitted.
Please contact your staff planner, Michael Grim, at (760) 438-1 161, extension 4499, if
you have any questions or wish to set up a meeting to discuss the application.
Sincerely,
MICHAEL J. HOLZMILLER
Planning Director
MJH: MG:kr
C: Gary Wayne File Copy
Brian Hunter Data Entry
Mike Shirey
Bobbie Hoder
2075 Las Palmas Dr. Carlsbad, CA 92009-1 576 - (760) 438-1161 - FAX (760) 438-0894
LIST OF ITEMS NEEDED
TO COMPLETE THE APPLICATION
NO. PIP 95-06(A)/PUD 97-14 - PSB LENDING CORP.
1.
2.
3.
4.
5.
6.
7.
8.
A recent Preliminary Title Report (PR) (issued within 6 m lonths of formal
application submittal) is required for both properties involved in the proposed
project.
Please verify that all bearings and distances of the property boundary match the
legal description in the PR.
All easements and encumbrances as identified in Schedule "B" of the PR must
be indicated on the site plan. The future disposition of all easements and
encumbrances must also be identified.
Please delineate the existing pad contour lines so that they are legible.
Please indicate the amount of grading proposed for the project in cubic yards of
cut/fill and import/export.
The proposed drainage design for the project must be reanalyzed, in accordance
with the following:
a) Why is almost the entire site drainage being directed to one inlet;
b) What does this proposed design do to the existing hydraulic grade line
(HGL) for the 18" and 36" storm drains at Owens Avenue, for a 10,
50 and 100 year storm (Plus, there is a discrepancy in the size which
is being shown for this reach of storm drain between this project and
city improvement drawing 241-6. Verify for analysis and revise);
..
c) Why is a combination of ribbon gutter and curb and gutter being used;
d) What is the proposed cross-fall gradient for this design;
e) Has sump overflow mitigation been addressed at the inlet?
In accordance with Item No. 6 above, investigate dividing the proposed surface
runoff to different halves of the site. Staff has serious concern regarding the
increased runoff being directed to the existing public storm drain system as a
result of this design.
In accordance with Item No.'s 6 & 7 above, investigate diverting surface
runoff through vegetated swales as a pollutant mitigation measure.