Loading...
HomeMy WebLinkAboutPIP 95-07; Carlsbad Oaks East Lots 23 & 38; Planned Industrial Permit (PIP) (2)August 4, 1995 TO: CHRISTER WESTMAN, ASSOCIATE PLANNER FROM: Associate Engineer VIA: Principal Civil Engineer #@ COMPLETENESS REVIEW AND INITIAL ISSUES STATEMENT CARLSBAD OAKS LOTS 23 AND 38, PIP 95-07 The Engineering Department has completed its review of the subject project for application completeness. The application and plans submitted for this project are complete and suitable for further review. In addition, the Engineering Department made a preliminary review of the project for Engineering issues. Engineering issues which need to be resolved or adequately addressed prior to conditioning of the project are as follows: 1. Trucks turning out of the westernmost truck bay in the rear of the building will impact the parking stalls, as shown on the grading and site plan. We suggest locating compact parking stalls in this area. 2. Pollutant mitigation is required for drainage from the truck bays prior to discharge into the storm drain system. Also, please provide a detail or cut sheet of the proposed oil and grease interceptor. 3. Several areas of the parking lot indicate a grade of 0.5%. We recommend that grades be adjusted so that all areas have a minimum grade of 1 .OO%. 4. Please indicate on the plans an easement for the water line. Attached is a redlined check print set of the project. Please forward this plan set to the applicant for corrections and changes as noted. The applicant must return this plan set with the corrected plans to assist us in our continued review. If you have questions regarding any of the comments above, please contact me at extension 4380. KENNETH W. QUON Associate Engineer