Loading...
HomeMy WebLinkAboutPIP 95-11; P.E.D.I.; Planned Industrial Permit (PIP) (8)NOVEMBER 14, 1995 TO: PLANNING TECHNICIAN, RICK FROM: Associate Engineer, Davis VIA PRINCIPAL CIVIL ENGINEER FOR LAND PRE 95-41, P.E.D.I. 1. The location of driveways opposite the site are not shown and this makes support of their locations uncertain for this preliminary review. a. The southerly driveway location is potentially acceptable. This is because there would be no left turn conflicts into the opposite driveway. b. The northerly driveway will need to be located a minimum of 150 feet from the driveway on the opposite side of Locker Avenue in order to avoid left turn conflicts. 2. The site plan does not show proposed top0 or surface elevations. Therefor only general comments can be made concerning drainage. a. The project will need to meet the City’s National Pollution Drainage Elimination System (NPDES) requirements. b. The City Standard minimum grade is one percent. c. Because the building is proposed to be close to the connection to the public storm drain system, a storm drain channel or piping system around the building may be required. However most of the drainage from the parking lot should flow through earth or vegetated swales for NPDES purposes. H:\LIBRARMENG\WPDATA\DAVIS\PRE9541 .LOK