Loading...
HomeMy WebLinkAboutPIP 96-03; Hunsaker Carlsbad I; Planned Industrial Permit (PIP) (12)<I . = - - CONSTRUCTION TESTING & ENGINEERING, INC. SAN DIECO, CA - RIVERSIDE, CA * WNTURA, CA - MODESFO, CA * IANCASl'RR, CA - LAS VEGA!$ NV * SEATIZE, WA 2414 Vineyard Ave. 490 E. princeland Ct. 1645 Pacific Ave 3540 Oakdale Rd 42156 10th St X 4560 S. VaUey View 235 S.W. 41st St Suite C Suite 7 Suite 105 Suite A2 Unit K Mte A.3 &ondido, CA 92029 Carom% CA 91719 Oxnd, CA 93033 Modesto, CA 95357 lancaster, CA 93534 la Vega, NV 89103 (206) 656-1266 Renton, WA 98055 (619) 746-4955 (909) 371-1890 (805) 4866475 (209) 551-2271 (805)726%76 (702) 795-2278 (206) 656-1265~ ENGINEERING. INC. (619) 746-9806~~~ (909) 371Wi8~fi (805) 4869016~~~ (209) 551-3593 FAX (805) 726-9676~~~ (702) 726-44485~~~ January 28,1997 City of Carlsbad Planning Department 2075 Las Palmas Carlsbad, CA 92029 SUBJECT: Response to Civil Engineering Issues PIP 96-03 Hunsaker - Carlsbad I The following is in response to your letter dated January 10, 1997. Planning 1. 9. 13. 15. Average daily traffic for the proposed project is based on a proposed Industrial Business Park facility. The SANDAG estimated weekly vehicle trip generation rate is 16/1000 square feet or for this project would result in 1,640 daily trips. The conceptual grading plan originally submitted contained earthwork volumes on the submittal cover sheet. These volumes have been included on the conceptual grading plan also. Elevations of the top and bottom of the wall located along the south end of the building are shown on the plans. Attachment to the EIA has been prepared which discusses each element of the proposed project. Issues of Concern 1. Existing facilities were indicated as such on the conceptual grading plan submitted. This notation has been modified to clearly delineate existing improvements. Improvement plans drawing numbers which detail these installations are shown on the grading plan. GEOTECHNICAL AND CONSTRUCTION ENGINEERING TESTING AND INSPECTION City of Carlsbad January 28, 1997 Page 2 3. 4. 5. 6. 7. 8. The driveway on Loker Avenue has been moved to the West to assure adequate site distance. A profile of the driveway is contained with the grading plan as requested. The driveway has been increased from 35 to 36 feet as requested. Site distances have been included on grading plan as requested. All utility easements are shown on grading plan as requested. The slope has been taken out of the easement as requested. Minor grading of existing surface profile is proposed to fit finished building floor elevations as shown. Proposed sewer tie-in is located along the northern property line into sanitary sewer easement area. The grading plan has been revised to include the removal of slope in the easement and additional site storm drainage inlets as required. A fossil filter catch basin filtration system will be included as part of the storm drain system as shown on the grading plan. If you have any questions please do not hesitate to contact this office. Civil Engineer Construction Testing and Engineering RDB:lmk