HomeMy WebLinkAboutPIP 97-04; Cornerstone Corporate Centre; Planned Industrial Permit (PIP) (10)P.O. BOX la1 SAN DIEGO. CA 921124150 819 ! 696-200(1
August 25,1997 FILE NO.
RECD SEP 3 1997 John Couvillion
Newport National Corporation
5050 Avenida Encinas, Suite 350
Carlsbad, CA 92008
LETTER OF PERMISSION FOR GRADING
AND CONSTRUCTION OF IMPROVEMENTS
Dear Mr. Couvillion:
San Diego Gas & Electric Company (SDG&E) is the owner of a 200’ Electric Transmission
Easement located in and around the following legal description; LOTS 7, 8 AND 11 OF LOT
LINE ADJUSTMENT PLAT NO. 504 IN THE CITY OF CARLSBAD, COUNTY OF SAN
DIEGO, STATE OF CALIFORNIA, (A.P.N. 212-091-14,15 & 16) Recorded April 15, 1954, ig.
Book 5205, Page 416, of Deeds, (SDG&E Right of Way No. 31564).
We have reviewed and approved the grading plans for Cornerstone Corporate Centre, (drawing
355-2A) Carlsbad Tract ## 81-46, Map No. 11287, received August 15, 1997 and dated May 12,
1997, which shows the proposed grading and improvements on the property subject to our
easement, attached hereto as Exhibit ‘A’.
Permission is hereby granted to Marco Plaza Enterprises, to grade and construct improvements as
shown on said plan, subject to the following conditions:
1. This permit to grade shall be effective for six (6) months from the date of this letter.
2. This letter is subject to Marco Plaza Enterprises , obtaining the necessary grading and
improvement permits fiom the City of Carlsbad.
3. Final signed, approved plans must be submitted to SDG&E a minimum of 15 working
days before commencement of grading and construction of improvements within the
easement area.
[nwptgrdl.doc]
August 25,1997
Page 2
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
At least menty-four (24) hours notice, whether by telephone, telefax or otherwise, must
be given to SDG&E before start of work or making field changes to plans within said
easement. Notice is to be given to the undersigned.
A representative of SDG&E must be invited with at least forty-eight (48) hours prior
notice, whether by telephone, telefax or otherwise, to any pre-construction meetings held
before the start of construction.
No grading shall be allowed within ten (10) feet of an existing 69Kv wood pole.
No grading shall be allowed within twenty (20) feet of an existing 138Kv wood pole.
No grading shall be allowed within twenty five (25) feet of an existing 230Kv tower or
steel pole.
Marco Plaza Enterprises, shall indemnify and hold SDG&E hannless from any and all
injuries or damage to persons or property in any way arising from the proposed grading
or construction of improvements.
Marco Plaza Enterprises, agrees to sign a consent agreement with SDG&E which will
permit the encroachments as shown on the grading plans.
SDG&E shall not be responsible in any manner for any maintenance or repair of the . '
proposed grading or improvements.
This letter shall not be construed as approval of any field changes. Specific approval of
any changes within SDG&E easements must be obtained.
All applicable laws and regulations of local, state and federal governments and their . .
agencies shall be complied with.
All disturbed and created slopes, within the SDG&E electric transmission easement, shall
be hydroseeded or planted 'with an SDG&E approved mix.
Erosion control measures shall be designed and implemented and maintained through the
normal rainy season for San Diego County.
You agee to keep access open to SDG&E facilities at all times during construction.
This permission letter shall be posted on the job site at all times.
L.
August 25,1997
Page 3
Should you have any questions or require additional assistance, please call me at 696-2738.
Sincerelv.
John J. Hernandez
Property Management Representative
I ACCEPT THE AFOREMENTIONED CONDITIONS:
MARC0 PLAZA ENTERPRISES,
By:
/I
Date: 9-&?47
." . 0 0
PRIVATE CONTRACT
'AS BUILT'
" :43
S.D.G. k E. ACCESS GATE DETAL
NO 4uLE
c I
PRIVATE CONTRACT
'AS BUILT'