Loading...
HomeMy WebLinkAboutPIP 97-04; Cornerstone Corporate Centre; Planned Industrial Permit (PIP) (18)April 18,1997 Via Hand Delivery Gary E. Wayne Assistant Planning Director CITY OF CARLSBAD 2075 Las Palmas Drive Carlsbad, CA 92009- 1576 RE: PRE 97-06 Cornerstone Corporate Centre APN 212-091-14 Dear Mr. Wayne: On behalf of Marco Plaza Enterprises, Newport National and I would like to thank you, Christer Westman and Ken Quon for your diligent and thorough work efforts in assisting us with the Preliminary Site Plan reviews on the above referenced project. After careful consideration of the issues discussed in your comment letters of June 27, 1996 and February 19, 1997, we hereby submit Phase I of our Cornerstone Corporate Centre for review and issuance of a Planned Industrial Permit (“PIP”) and Hillside Development Permit (“HDP”). Attached is the list of documents we are submitting in accordance with the PIP and HDP. We understand that a different planner and engineer may be assigned to the project, however, we request that Mr. Westman and Mr. Quon remain with the project. We believe all parties would benefit from their continued involvement. Again, thank you for your assistance on this project. We look forward to successfully developing another quality project the City can be proud of. If you have any questions or concerns, please feel fiee to give me a call. SinceAy, s R. McCann President - Development JMC/jdg cc: Christer Westman, City of Carlsbad Ken Quon, City of Carlsbad F:\DEFTWI~GRANT~AhClElCOF34ERkLBMIT,LWC 5050 Avenida Encinds, Suite 350 Carlsbad, California 92008 619-438-4242 FAX: 619-438-0046 DOCUMENT CORNERSTONE CORPORATE CENTRE PLANNED INDUSTRIAL PERMIT AND HILLSIDE DEVELOPMENT PERMIT DOCUMENT SUBMITTAL LIST Building D Site Plan Building Elevations (2 Sheets) Building Floor Plans (3 Sheets) Check dated 4/18/97 for $1,770.00 Disclosure Statement Environmental Impact Assessment Form Geocon Letter Dated 4/14/97 Grading and Drainage Plans (2 Sheets) Land Use Review Application Master Site Plan Notarized Copy of Public Facility Agreement Preliminary Landscape Plan Preliminary Title Report Project Description / Explanation Roof Plan Water Conservation Plan COPIES SUBMITTED 10 10 10 1 1 1 1 10 1 10 1 10 3 1 1 10 April 18, 1997 Via Hand Delivery Brian Church BRIAN PAUL & ASSOCIATES 4350 La Jolla Village Drive, #130 San Diego, CA 92122 - 1233 RE: Cornerstone Corporate Centre PIP Application Dear Brian: Enclosed please find two copies of the PIP Application and Public Facilities Fee Agreement for the above referenced project (originals for the City of Carlsbad and copies for BPA). Also enclosed are three copies of the Preliminary Title Report and the slope stability letter fiom Geocon Engineering as required by the City's PIP Application process. The enclosed check for the required submittal fees, totaling $1,770, can be broken down into the following amounts: Public Notice $ 500 Environmental Impact Assessment $ 220 Public Facilities Fee $ 50 Planned Industrial Permit $ 600 Hillside Development Permit $ 400 TOTAL $1,770 Upon the completion of your submittal to the City of Carlsbad this morning, please contact me at our office to give me a quick summary of your submittal meeting. JO& Couvillion Project Manager JC/jdg cc: Scott Merry, Ninteman Construction James McCann, Newport National Corporation F:\DEHURCI%DOC 5050 Avenidd Encinas, Suite 3jO Carlsbad, California 92008 619-438-4242 FAX: 619-438-0046 GEOCON INCORPORATED ~~ ~ ~~ ~ Project No. 05724-12-01 April 14, 1997 ~~ ~ GEOTECHNICAL CONSULTANTS Ne\vport National Corporation 5050 Avenida Encinas, Suite 350 Carlsbad, California 92008 Attention: Mr. James R. McCann Subject: CORNERSTONE CORPORATE CENTER CARLSBAD, CALIFORNIA SLOPE GRADING CARLSBAD TRACT NO. 8 1-46 Reference: Geotechnical Investigation, Carlsbad Tract No. 81-45, Unit I, Lots 7, 8, 1 I, and 15, Carlsbad, California, prepared by Geocon Incorporated, dated May 8, 1996 Gentlemen: In accordance with your request, we have provided supplemental geotechnical engineering services for the subject development. The scope of these services included an evaluation of the need to provide benching at 30-foot height intervals during grading of fill slopes 30 feet and higher. It is our understanding that grading associated with the initial development (Building D) will lower the elevation within Lot 11 (previously identified as Lot 8). Along the north side of Lot 11, the existing fill slope is approximately 35 feet high. The grade change of 20 feet will therefore create a slope of about 55 feet high. As recommended in the referenced geotechnical report, the lower portion of the slope will be constructed as a stability fill. Based on the above discussion, it is our opinion that benching is not required for fill slopes with heights greater than 30 feet. If you have any questions regarding this letter, or if we may be of further service, please contact the undersigned at your convenience. Very truly yours, (2) Latitude 33 (3) Brian Paul Architects Attention: Mr. Tony Wonsisky Attention: Mr. Len Zegarski 6960 Flanders Drive San Diego, California 92121-2974 Telephone (619) 558-6900 w Fax (619) 558-6159