Loading...
HomeMy WebLinkAboutPIP 97-05; Carlsbad II; Planned Industrial Permit (PIP) (6)To: ASSOCIATE PLANNER, && From: ASSOCIATE ENGINEER, Clyde Wickham Date: 2 April 1997 Re: Preliminary Review 97-16, Carlsbad II (Hunsaker) I have reviewed the above mentioned application and hereby offer the following suggestions or comments to the project. The applicant should look at the approved drawings for this business park. The sewer laterals, water setvices and existing drainage improvements are provided and should be considered before building or driveway placement (to avoid conflict). The specific plan for this project includes driveway and access locations. This was established to maintain a safe circulation network within the business park. The applicant should review this plan and conform to the approved locations. As a standard practice, the Architect should review and include existing improvements adjacent to and impacted by the proposed development. I believe the driveway to the South of this project is an existing, shared driveway, this should be noted. The developer should show existing and proposed NPDES drainage systems. ( usually Oil and Grease separators or filters are required.) The developer should include all existing and proposed restrictions across the proposed project. All utilities should also be shown to resolve conflicts at an early stage. Show specific information regarding the existing and proposed grading and the existing and proposed drainage of the entire site. ,- April 2, 1997 - The onsite circulation plan needs minor revision. Truck circulation needs to be plotted and access to and from the loading dock appears to be difficult if not impossible. Usually we plot the semi-truck turn path from Cal Trans turn template. Use 407-D for semi trucks and 407-E for single unit trucks. The single unit truck template will also work for trash trucks. The proposed parking design should be modified to show the standard 5' offset in both directions at 90 degree or corner parking areas. The angle or skewed parking bays should also be offset a little to avoid "blocking in" by vehicle overhang. I have attached the preliminary site plan with red-lined comments to better relay our comments and suggestions. If you need additional information or assistance, please contact this office. Associate Engineer Land Use Review Division - \. 2