February 26, 1998
Mr. Chris De Cerbo
Associate Planner
City of Carlsbad
2075 Las Palmas Drive
Carlsbad, CA 9209-1 575
RE: PIP 98-03
Cornerstone Corporate Centre
Lot 7 / Building B
Dear Mr. De Cerbo:
On behalf of the Newport National Corporation, Brian Paul and Associates submitted a Planned
Industrial Permit application for Lot 7 of Carlsbad Airport Centre on February 10, 1998. The project
consists of a two-story office building of 33,500 square feet with on-grade parking for 134 cars. This
application is the third in a series of four PIP submittals by the Newport National Corporation that
includes Lots 7, 8, 11 and 15 of Carlsbad Airport Centre. Please refer to PUD 97-10 and HDP 97-07
in general and PIP 97-04 for Lot 11 and PIP 97-10 for Lot 8.
The following application forms and fees were submitted as part of the Lot 7 PIP package:
0 Land Use Review Application Form No Fee
0 Planned Industrial Permit $ 600.
0 Environmental Impact Assessment Form $ 220.
0 Public Facility Agreement $ 50.
0 Noticing Fee Deposit $ 100.
0 Total: $ 970.
The following exhibits and support documents were submitted as part of the Lot 7 PIP package:
0 Architectural Site Plan
0 Grading Plan
0 Grading Profiles
0 Landscape Concept Plan
0 Water Conservation Plan
-0 Building Floor Plans
A1
Cl
c2
L1
L2
A2, A3
10 Copies
10 Copies
10 Copies
10 Copies
10 Copies
10 Copies
L , .
Mr. De Cerbo
PIP 98-03
February 26, 1998
0 Roof Plan A4
0 Building Elevations A5, A6
0 Project Description / Explanation Sheet One Sheet
10 Copies
10 Copies
1 COPY
The following exhibits were previously submitted with the existing PUD, HDP and PIP applications:
0 Disclosure Statement
0 Preliminary Title Report
0 Preliminary Soils Report
0 Site Photographs
0 Rendered Color Elevation
0 Materials Board
1 COPY
3 Copies
2 Copies
1 COPY
1 COPY
1 Exhibit
The above referenced exhibits submitted with previous PUD, HDP and PIP applications still apply to
Lot 7 and the design of Building B. The original application did not include a Circulation Impact
Analysis, Constraints Map or Noise. Study. We made the decision to eliminate these items after
discussion with the original planner assigned to the project, Ms. Terri Woods. This was based on the
assumption that the original EIA for Carlsbad Airport Centre addressed these issues. In addition, our
project conforms to the design standards set forth in the Speafic Plan. If this assumption is noi:
satisfactory please let me know and we will provide any additional Information necessary to
complete the application.
The PIP submittal for Building B did not include the following required items:
0 Reduced Site Pian
0 Reduced Building Elevations
0 Location Map
0 Separate Roof Plan
We have attached the above referenced missing items to this letter. Thank you for your time and
assistance in reviewing our PIP submittal. Please let us know if the City requires additional materials
or exhibits in order to deem the application complete. Feel free to call Joe Nichols or myself.
Sincerely,
BRIAN PAUL & ASSOCIATES
Leonard Zegarski
Architect
CC: John Couvillion, NNC