Loading...
HomeMy WebLinkAboutPIP 98-03; Cornerstone Corporate Centre Lot 7; Planned Industrial Permit (PIP) (12)h P e c 4350 LA IOLLA VllLAGf DRIVE, SUIT€ 130, SAN OIECO. CA 92122-1233 TfL: b19.453.1200 FAX: bl9.453.1913 BRIAN PAUL & ASSOCIATES .\ ., . '. - ARCHITECTS & PLANNERS February 26, 1998 Mr. Chris De Cerbo Associate Planner City of Carlsbad 2075 Las Palmas Drive Carlsbad, CA 9209-1 575 RE: PIP 98-03 Cornerstone Corporate Centre Lot 7 / Building B Dear Mr. De Cerbo: On behalf of the Newport National Corporation, Brian Paul and Associates submitted a Planned Industrial Permit application for Lot 7 of Carlsbad Airport Centre on February 10, 1998. The project consists of a two-story office building of 33,500 square feet with on-grade parking for 134 cars. This application is the third in a series of four PIP submittals by the Newport National Corporation that includes Lots 7, 8, 11 and 15 of Carlsbad Airport Centre. Please refer to PUD 97-10 and HDP 97-07 in general and PIP 97-04 for Lot 11 and PIP 97-10 for Lot 8. The following application forms and fees were submitted as part of the Lot 7 PIP package: 0 Land Use Review Application Form No Fee 0 Planned Industrial Permit $ 600. 0 Environmental Impact Assessment Form $ 220. 0 Public Facility Agreement $ 50. 0 Noticing Fee Deposit $ 100. 0 Total: $ 970. The following exhibits and support documents were submitted as part of the Lot 7 PIP package: 0 Architectural Site Plan 0 Grading Plan 0 Grading Profiles 0 Landscape Concept Plan 0 Water Conservation Plan -0 Building Floor Plans A1 Cl c2 L1 L2 A2, A3 10 Copies 10 Copies 10 Copies 10 Copies 10 Copies 10 Copies L , . Mr. De Cerbo PIP 98-03 February 26, 1998 0 Roof Plan A4 0 Building Elevations A5, A6 0 Project Description / Explanation Sheet One Sheet 10 Copies 10 Copies 1 COPY The following exhibits were previously submitted with the existing PUD, HDP and PIP applications: 0 Disclosure Statement 0 Preliminary Title Report 0 Preliminary Soils Report 0 Site Photographs 0 Rendered Color Elevation 0 Materials Board 1 COPY 3 Copies 2 Copies 1 COPY 1 COPY 1 Exhibit The above referenced exhibits submitted with previous PUD, HDP and PIP applications still apply to Lot 7 and the design of Building B. The original application did not include a Circulation Impact Analysis, Constraints Map or Noise. Study. We made the decision to eliminate these items after discussion with the original planner assigned to the project, Ms. Terri Woods. This was based on the assumption that the original EIA for Carlsbad Airport Centre addressed these issues. In addition, our project conforms to the design standards set forth in the Speafic Plan. If this assumption is noi: satisfactory please let me know and we will provide any additional Information necessary to complete the application. The PIP submittal for Building B did not include the following required items: 0 Reduced Site Pian 0 Reduced Building Elevations 0 Location Map 0 Separate Roof Plan We have attached the above referenced missing items to this letter. Thank you for your time and assistance in reviewing our PIP submittal. Please let us know if the City requires additional materials or exhibits in order to deem the application complete. Feel free to call Joe Nichols or myself. Sincerely, BRIAN PAUL & ASSOCIATES Leonard Zegarski Architect CC: John Couvillion, NNC Joe Nichols, BPA Ob Lor 7 " I r A \ I \ fe A8 LOCATION MAP Cornerstone Corporate Centre A Project of the I Newport National Corporation