HomeMy WebLinkAboutPIP 98-03; Cornerstone Corporate Centre Lot 7; Planned Industrial Permit (PIP) (18)4350 IA lOlLA VILLAGE DRIVE, SUITE 130, SAN DILCO. CA 92122.1233 TEl: 619.453.1100 FAX: bl9.453.1913 BRIAN PAUL & ASSOCIATES ARCHITECTS Ei PLANNERS May 15, 1998 Mr. Chris De Cerbo Associate Planner City of Carlsbad 2075 Las Palmas Drive Carlsbad, CA 9209-1 575 RE: PIP 98-03 Lot 7 / Building B at Cornerstone Corporate Centre Dear Mr. De Cerbo: In response to Mr. Michael J. Holzmiller’s letter dated March 12, 1998 regarding PIP application number 98-03, our office is re-submitting the following materials as requested: DRAWINGS Architectural Site Plan Grading Plan Grading Profiles Landscape Concept Plan Water Conservation Plan Building Floor Plans Roof Plan Building Elevations Reduced Site Plan Reduced Building Elevations A1 c1 c2 L1 L2 A2, A3 A4 A5, A6 DOCUMENTS 10 Copies 1 0 Copies 10 Copies 10 Copies 10 Copies 10 Copies 10 Copies 10 Copies 1 COPY 1 COPY Preliminary Title Report 2 Copies Grading Letter 2 Copies Drainage Study . 1 copy Water Development Plans 1 COPY Proposed Lot Line Exhibit for Parcel ‘A‘ 1 COPY Reciprocal Rights Agreement (Recorded Covenant to grant easements.) 1 Copy Red-lined Check Prints 1 COPY EXHIBITS Material Board Mr. De Cerbo May 15,1998 PIP 98-03 The revised drawings address the “Items Needed to Complete the Application” as follows: P 1. The grading to the west of the building was revised in order to reduced the retaining wall to three (3) feet in height and avoid processing a Hillside Development Permit. E 1. See attached Title Report. E 2. See references to adjacent plat Numb& 504 on Sheet C1. E 3. Not used in “List of items Needed” E 4. Not used in “List of Items. Needed“ E 5. See Sheets A1 and C1 for location of driveways and intersections within 300’. E 6. See updated Grading Letter. Soils Reports were submitted with the original applications for PUD 97-10 and HDP 97-07 which address this parcel of land. E 7. See attached Drainage Study. E 8. See Sheet C1 and attached Proposed Lot Line Exhibit for Parcel ‘A’ as referenced above; labeled “New Lot Line” as requested. The revised drawings address the “issues of Concern” as follows: P 1. The trash enclosure and mechanical equipment yard were relocated on the site and necessary adjustment to the property line between Lot 7 / Building B and Lot 8 / Building C were made in order to provide the required parking for each lot. P 2. TC 1. TC 2. s 1. w 1. Building B was shifted three (3) feet to the east to address this concern. In addition, we lowered the height of the building by 1’-6” to reduce the overall physical mass of the building. As noted in our meeting March 26, 1998, we are extremely limited in our ability to relocate the building due to the 240 foot wide SDG&E easement across the entire length of the property. See Sheets Al, C1 and L1. See attached Reciprocal Rights Agreement See Sheet C1. See attached Water Development Plans. The original red-lined check prints are included with this re-submittal. Mr. De Cerbo May 15, 1998 PIP 98-03 ” We believe the information provided and referenced above addresses the issues and concerns raised in Mr. Holzmiller’s letter. In addition, the following documents and fees were provided in our PIP duplicated in this re-submittal. .. DOCUMENTS Disclosure Statement Project Description / Explanation Sheet Separate Roof Plan Location Map 0 Land Use Review Application Form .. FEES 0 Planned Industrial Permit $ 600. 0 Environmental Impact Assessment Form $ 220. 0 Public Facility Agreement $ 50. 0 Noticing Fee Deposit $ 100. Total: $ 970. application dated February 9, 1998. The documents and application forms listed below are not if Thank you for your time and assistance in reviewing this application. Please call me directll require additional information or have any questions regarding the information submitted. Sincerely, BRIAN PAUL & ASSOCIATES Architect YO” CC: John Couvillion, PP Tony Wonseski, L33 Joe Nichols, BPA