May 15, 1998
Mr. Chris De Cerbo
Associate Planner
City of Carlsbad
2075 Las Palmas Drive
Carlsbad, CA 9209-1 575
RE: PIP 98-03
Lot 7 / Building B at Cornerstone Corporate Centre
Dear Mr. De Cerbo:
In response to Mr. Michael J. Holzmiller’s letter dated March 12, 1998 regarding PIP application
number 98-03, our office is re-submitting the following materials as requested:
DRAWINGS
Architectural Site Plan
Grading Plan
Grading Profiles
Landscape Concept Plan
Water Conservation Plan
Building Floor Plans
Roof Plan
Building Elevations
Reduced Site Plan
Reduced Building Elevations
A1
c1
c2
L1
L2
A2, A3
A4
A5, A6
DOCUMENTS
10 Copies
1 0 Copies
10 Copies
10 Copies
10 Copies
10 Copies
10 Copies
10 Copies
1 COPY
1 COPY
Preliminary Title Report 2 Copies
Grading Letter 2 Copies
Drainage Study . 1 copy
Water Development Plans 1 COPY
Proposed Lot Line Exhibit for Parcel ‘A‘ 1 COPY
Reciprocal Rights Agreement (Recorded Covenant to grant easements.) 1 Copy
Red-lined Check Prints 1 COPY
EXHIBITS
Material Board
Mr. De Cerbo
May 15,1998
PIP 98-03
The revised drawings address the “Items Needed to Complete the Application” as follows:
P 1. The grading to the west of the building was revised in order to reduced the retaining
wall to three (3) feet in height and avoid processing a Hillside Development Permit.
E 1. See attached Title Report.
E 2. See references to adjacent plat Numb& 504 on Sheet C1.
E 3. Not used in “List of items Needed”
E 4. Not used in “List of Items. Needed“
E 5. See Sheets A1 and C1 for location of driveways and intersections within 300’.
E 6. See updated Grading Letter. Soils Reports were submitted with the original
applications for PUD 97-10 and HDP 97-07 which address this parcel of land.
E 7. See attached Drainage Study.
E 8. See Sheet C1 and attached Proposed Lot Line Exhibit for Parcel ‘A’ as referenced
above; labeled “New Lot Line” as requested.
The revised drawings address the “issues of Concern” as follows:
P 1. The trash enclosure and mechanical equipment yard were relocated on the site and
necessary adjustment to the property line between Lot 7 / Building B and Lot 8 /
Building C were made in order to provide the required parking for each lot.
P 2.
TC 1.
TC 2.
s 1.
w 1.
Building B was shifted three (3) feet to the east to address this concern. In addition,
we lowered the height of the building by 1’-6” to reduce the overall physical mass
of the building. As noted in our meeting March 26, 1998, we are extremely limited
in our ability to relocate the building due to the 240 foot wide SDG&E easement
across the entire length of the property.
See Sheets Al, C1 and L1.
See attached Reciprocal Rights Agreement
See Sheet C1.
See attached Water Development Plans.
The original red-lined check prints are included with this re-submittal.
Mr. De Cerbo
May 15, 1998
PIP 98-03
”
We believe the information provided and referenced above addresses the issues and concerns raised
in Mr. Holzmiller’s letter. In addition, the following documents and fees were provided in our PIP
duplicated in this re-submittal. ..
DOCUMENTS
Disclosure Statement
Project Description / Explanation Sheet
Separate Roof Plan
Location Map
0 Land Use Review Application Form
..
FEES
0 Planned Industrial Permit $ 600.
0 Environmental Impact Assessment Form $ 220.
0 Public Facility Agreement $ 50.
0 Noticing Fee Deposit $ 100.
Total: $ 970.
application dated February 9, 1998. The documents and application forms listed below are not
if Thank you for your time and assistance in reviewing this application. Please call me directll
require additional information or have any questions regarding the information submitted.
Sincerely,
BRIAN PAUL & ASSOCIATES
Architect
YO”
CC: John Couvillion, PP
Tony Wonseski, L33
Joe Nichols, BPA