Loading...
HomeMy WebLinkAboutPIP 98-03; Cornerstone Corporate Centre Lot 7; Planned Industrial Permit (PIP) (4)-. t i TO: Associate Planner, Don Neu FROM: Associate Engineer, Clyde Wickham DATE: March 11, 1998 PIP 98 - 03, Cornerstone Corporate Centre ( Newport National ) COMPLETENESS & ISSUES REVIEW Engineering Department staff has completed a review of the above-referenced project for application completeness. The application and plans submitted for this proposed project are currently incomplete and unsuitable for further review due to the following incomplete items: 1. The title report needs to be updated. It is more than 6 months old. The adjustment plat required from PIP 97-04 and the reciprocal easements for circulation, access, and drainage must be shown. The “not a part” should include all requirements of the previous plans and applications shown. 2. Please submit the indicate easements and encumbrances, with the recordation number and date, in accordance with the preliminary title report. Indicate the future disposition of these easements either in plan view adjacent to the easement information, or as a note or easement disposition chart. Note that typically, SDG&E easements require a joint use agreement. The reference to proposed lot lines to be adjusted may be old. The adjustment plan should have recorded by now. The reference to parcel A, B, and C is confusing. If a subdivision has occurred to create these parcels indicate recordation and map #. The cover sheet and application says this project is lot 7 of CT 81-46. 5. Please show distance to any existing driveways and intersections which are located within 300’ of the proposed project. The Engineer or Architect can use broken / lines to extend and provide distance information. 6. Please submit two copies of the preliminary soils / geologic report. The report should include details about the recent grading activity and any new or proposed grading. The plan submitted appears to be an old version. 7. Please submit preliminary drainage or hydrology study. Verify proposed design to remove the storm drain and any redirected downstream drainage system capacity. 8. Clearly label existing and proposed lot lines. It is unclear if a Minor Subdivision is anticipated or if the adjustment plat of lot 7 The title report identified parcels “A,B,C & D that should be shown. Additionally, staff has conducted a review of the project for engineering issues of concern. Engineering issues which need to be resolved or adequately addressed prior to staff making a determination on the proposed project are as follows: Traffic and Circulation: 1. Please indicate Corner Sight Distance (sight lines), in accordance with CalTrans criteria, for both directions at the proposed entrance to this project. 2. Please provide an exhibit that shows existing and proposed lot configuration and necessary reciprocal access, drainage and parking agreements. Sewer: 1. Please indicate sewer laterals from the proposed lots and buildings to public sewer facilities. Check with CMWD for possible issues with cross - lot lateral. Water: 1. Please show the complete water system including fire hydrant and offsite looped or connecting systems. Contact CMWD for design details and specifics. Attached is a red-lined check print of the proposed project for the applicants use in making the requested revisions. This check print must be returned with the project revisions to facilitate continued staff review. If you or the applicant have any questions, please contact me at extension 4353. Land Development Division