Loading...
HomeMy WebLinkAboutPIP 98-05; Cornerstone Corporate Center; Planned Industrial Permit (PIP) (16)City of Carlsbad March 19, 1998 James McCann Newport National Corporation Suite 350 5050 Avenida Encinas Carlsbad CA 92008 SUBJECT: PIP 98-05 - CORNERSTONE CORPORATE CENTER Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning Department has reviewed your Planned industrial Permit, application no. PIP 98-05, as to its completeness for processing. The application is complete, as submitted. Although the initial processing of your application may have already begun, the technical acceptance date is acknowledged by the date of this communication. The City may, in the course of processing the application, request that you clarify, amplify, correct, or otherwise, supplement the basic information required for the application. In addition, you should also be aware that various design issues may exist. These issues must be addressed before this application can be scheduled for a hearing. The Planning Department will begin processing your application as of the date of this communication. Please contact your staff planner, Van Lynch, at (760) 438-1 161 , extension 4325, if you have any questions or wish to set up a meeting to discuss the application. MI&AEL d: HOLZMILLCR Planning Director MJH: VL:kc C: Gary Wayne Chris DeCerbo Ken Quon Bobbie Hoder File Copy Data Entry Planning Aide 2075 La Palmas Dr. - Carlsbad, CA 92009-1 576 - (760) 438-1 161 FAX (760) 438-0894 ISSUES OF CONCERN NO. PIP 98-05 Planning: 1. The landscape plans (Sheet L1 Plant Material Legend) indicate that a biologist report was prepared. Please provide this report for staffs review. There is a concern that the Western parking area and retaining walls encroach into the native habitat. 2. Although the project is within 1000 feet of an existing mini-park, the project would benefit from an outdoor employee eating/break area. Possibly in the Northern open triangular area of the building, adjacent to the Handicap parking area, along the Southwestern landscape area adjacent to the building or one of the Northern landscape areas in the parking lot. Please consider adding this amenity as the existing developments also depend on the parks heavily and they are used frequently. 3. Please review the trash enclosure area. Please show how the bins are to be accessed for service. It appears the mechanical yard precludes access to the trash bins. 4. Please provide a letter of approval for the project from the Carlsbad Airport Centre Owners’ Association. 5. If plans are resubmitted because of any redesign, please include the Planned Industrial Permit number on the plans and have all the plans collated together (i.e. combine the grading plans with the building plans into one complete set). Engineering: I. Please consider adding a section of raised curb at the project entrance or devise some other alternative to avoid an awkward 5-legged intersection. Attached is a redlined check print set of the project. Please return this plan set with the corrected plans to assist us in our continued review. If you have questions regarding any of the Engineering comments above, please contact Ken Quon at extension 438-1161 extension 4380.