February 25, 1998
Mr. Gary Wayne
Assistant Planning Director
City of Carlsbad
2075 Las Palmas Drive
Carlsbad, CA 9209-1 575
RE: PIP Submittal
Cornerstone Corporate Centre
Lot 15 / Building A
Dear Mr. Wayne: ..
On behalf of the Newport Nationa! Corporation, Brian Paul and Associates r~jyer~ully,svbmits a
Pldnned Industrial Permit application fc,r Lot1 5 in Carlsbad Airport Centre. 7 he project will r:+,hsisl
of one three-story office buildings of 46,750 square feet with on-grade parking for 187 cars. .This
application is the last in a series of four PIP submittals by the Newport National Corporation that .
includes Lo1.s 7, 8 arid I 'I. Please refer to PlJD 97-10 and HDP 97-07 in general and PIP 37-04 for
Lot 11, PIP 97-10 for Lot 8 and PIP 98-03 for Lot 7.
We are submitting the following forms and fees as part of this new application package:
0 Land Use Review Application Form
m Plannnrl Inrlmtctrial Permit
No Fee
!% 1.250. - I ,C.II,Ic.U IIIUU.2CI.U. # _I..... T
0 Environmental Impact Assessment Form $ 1,030.
0 Recording Fee $ 50.
0 Public Facility Agreement $ 50.
0 Noticing Fee Deposit $ 502
Total: $ 2,880.
Attached please find the following exhibits and support documents for this new PIP application:
0 Architectural Site Plan
0 Grading Plan
0 Grading Profiles
0 Landscape Concept Plan
One Sheet
One Sheet
One Sheet
One Sheet
10 Copies
10 Copies
10 Copies
10 Copies
Mr. Gary Wayne
CornerStone
February 25,1998
Water Conservation Plan
Building Floor Plans
Building Elevations
Roof Plan
Reduced Site Plan
Reduced Building Elevations
Location Map
Project DescriptionExplanation Sheet
Preliminary Title Report
One Sheet
Three Sheets
Two Sheets
One Sheet
One Sheet
One Sheet
’ One Sheet
One Sheet
10 Copies
10 Copies
10 Copies
1 COPY
1 COPY
1 COPY
1 COPY
1 COPY 3 Copies
The following exhibits were previously submitted with the existing PIP application:
Disclosure Statement
Preliminary Soils Report
Site Photographs
0 Color Elevation
Materials Board
1 COPY
1 COPY
1 COPY
1 Exhibit
2 Copies
The five (5) exhibits referenced above were submitted with previous PIP applications and still apply
to Lot 15 and the design of Building A. This applicaiion does not inc:ude a Circulation Impact
.Analysis, Constraints Map or Noise Study. We made the decision to eliminate these items after
discusslam with Ms. Terri M’oods;,the planner dssigned to’ ieview the PUU and HDP application.
This was based on the assumption that the original EIA for Carlsbad Airport Centre addressed these
issues. In addition, our project conforms to the design standards set forth in the Specific Plan. If this
assumption is not satisfactory please let me know and we will provide my additional information
you deem necessary.
Thank you for your time and assistance in reviewing our PIP submittal. If you have any questions or
need additional information please call.
Sincerely,
BRIAN PAUL & ASSOCIATES
CC: John Couvillion, NNC