HomeMy WebLinkAboutPIP 98-06; Carlsbad Palomar Business Park; Planned Industrial Permit (PIP) (3)March 17, 1998
TO: VAN LYNCH, PLANNING TECHNICIAN II
FROM: Associate Engineer Quon
COMPLETENESS REVIEW AND INITIAL ISSUES STATEMENT
CARLSBAD PALOMAR BUSINESS PARK, PIP 98-06
The Engineering Department has completed its review of the subject project for application
completeness. The application and plans submitted for this project are complete and suitable
for continued engineering review.
In addition, the Engineering Department made a preliminary review of the project for
Engineering issues. Engineering issues which need to be resolved or adequately addressed
prior to conditioning of the project are as follows:
1. Please indicate on the plans the Average Daily Traffic (ADT) generated by the project, broken down by separate uses.
2. Clearly show on the grading plan existing street lights and fire hydrants. Please see the
red-lined plans for more information.
3. The plans must include and identify measures to treat surface runoff onsite prior to
entering the public storm drain system.
This issue is related to the City's requirements of the National Pollutant Discharge
Elimination System (NPDES) permit, which requires a project to provide best
management practices to reduce surface pollutants to an acceptable level prior to
discharge. Other commercial and industrial projects have utilized methods such as
directing runoff from paved areas towards a landscaped swale prior to reaching the
storm drain; or installing an onsite drainage basin specially designed to remove
pollutants.
4. A minimum clear distance of 5' for vehicles to back out is required when adjacent
parking stalls are located perpendicular or at an angle of 90° or less to each other.
5. Please note that a lot line consolidation will be required prior to issuance of a building
permit for this project.
Attached is a redlined check print set of the project. Please forward this plan set to the
applicant for corrections and changes as noted. The applicant must return this plan set with the
corrected plans to assist us in our continued review. If you have questions regarding any of the
comments above, please contact me at extension 4380.
KENNETH W. QUON
Associate Engineer
C: City Engineer
Bob Wojcik, Principal Civil Engineer