Loading...
HomeMy WebLinkAboutPIP 98-08; Corte Del Cedro; Planned Industrial Permit (PIP) (11)" - City of Carlsbad February 22,1999 Andrew Kjellberg McArdle Associates Architects 6965 El Camino Real, Suite 105-472 Carlsbad, CA 92009 RE: PIP 98-08 - CORTE DEL CEDRO Dear Mr. Kjellberg: The Planning and Engineering departments have reviewed the plans Cedro project resubmitted on January 19, 1999. There are still a few be clarified on the plans prior to the approval of the project. Consistency between the Site plan, Grading plan and the Landscape reviewed. There are various items that differ between the two such as: for the Corte Del items that need to plans needs to be Site plan vs Landscape plan: Loading doors at rear of building. Hardscape in front of building. Trash enclosure and relationship to parking. Number of parking stalls at southeast comer of building. Site plan vs Grading plan: Number of parking stalls at southeast comer of building. Landscape area at southeast comer of building. Drainage through landscape islands on grading plan. Grading plan: " Show top and bottom of wall heights at worst case (maximum height) and at each end and at a midpoint in the length of the wall. Landscape plan shows this wall being 12' tall near the trash enclosure. Does this height reflect the 2 feet underground plus the three feet above grade for a safety railing? The compact to standard parking space ratio has exceeded the 25 percent allowed. Engineering 1. Add project site address (6150 Corte Del Cedro) to site plan. 2075 La Palrnas Dr. Carlsbad, CA 92009-1576 - (760) 438-1 161 FAX (760) 438-0894 @ c PIP 98-08 - CORTE DEL CEDRO FEBRUARY 22,1999 PAGE 2 2. 3. 4. 5. 6. 7. 8. Calculate and show (see site plan comment) the average daily traffic (ADT) generated by this project. Identify the SDG&E easement per item nine of the Preliminary title report document 80-338477, and the Pacific Telephone easement per item ten of the Preliminary title report document 80-40058 1. Coordinate the driveway width in the site plan and grading plan. Show top of wall, top of footing and finish elevations for the retaining wall at the east side of the property as noted in Section C of the grading plan. Show in grading plan how drainage water flows through planters at the south side of the parking area (see Arch. Site plan). Clarify the existing ditch shown at the east side of the property. Show what it drains into. Note comments in plans. Please find attached, a red-lined set of prints for your use. Please return the red-lined plans with the next resubmittal. If you have any questions regarding the above, please give me a call at 438-1 161, extension 4447, or Frank Jimeno in the Engineering dept. at extension 4501. Sincerely, VAN LYNCH Assistant Planner VL:mh C: F. Jimeno File