Loading...
HomeMy WebLinkAboutPIP 98-08; Corte Del Cedro; Planned Industrial Permit (PIP) (8)MEMORANDUM September 17, 1998 TO: ASSISSTANT PLANNER - VAN LYNCH FROM: Associate Engineer - Land Development PIP 98-08 - CORTE DEL CEDRO The Engineering Department has completed a review of the referenced project. The Engineering Department will be recommending approval of the project subject to the applicant's revision of the site plan to reflect the comments listed below and subject to conditions that will follow this memo. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. Add PIP 98-08 to application number. The Title Report shows Mercolatec, Inc. as owner of record. Please clarify. Add project site address to site plan. Calculate and show in the site plan the Average Daily Traffic (ADT) generated by this project. Identify the City of Carlsbad easement per item 7 of the Title Report (PTR) document 76-067033, the SDG&E easement per item 9 of the PTR document 80-338477, and the Pacific Telephone easement per item 10 of the PTR document 80-400581. Show the existing Corte del Cedro street cross section in the grading plan. Show the existing driveways adjacent to and across the street from the project. Increase the driveway width to 30 feet. Please show a 25-foot triangular sight view corridor at each side of the driveway, measured along the face of curb at the street and the driveway. This sight view corridor must be free of any obstructions in excess of 30-inches in height. Move the sewer clean out off the driveway apron. Dimension the parking stalls next to the east side of the building. All parking stalls need to be at least 170 square feet in area. Access to the trash enclosure and the loading door at the northeast corner of the building does not work. Show truck circulation. Show concrete apron in front of the trash enclosure. Move employee eating area out of the slope and the equestrian trail easement. Show a cross section through the slope. 14. 15. 16. 17. 18. 19. 20. 21. Consult with the Fire Department regarding the need for new fire hydrants. Then coordinate the design of the water system with the Carlsbad Municipal Water District. Show top of wall, top of footing and finish surface elevations for the retaining wall at the east side of the property. Show a cross section through the building and slope at the north side of the building. The site plans shows doors at the west end of the north side of the building, the grading plan shows a ditch. Coordinate. Clarify status of trees shown at the north side of the building. If they are existing trees, state their disposition. Show how drainage water flows through planters at the south side of the parking area. Clarify the existing ditch shown at the east side of the property. Show what it drains into. Indicate how National Pollutant Discharge Elimination System criteria will be met. Show parking lot water flow through vegetated swales or through a filtering system prior to discharge into a storm drain. Also, any loading areas located in a sump must have pump facilities to direct drainage to a pollutant mitigation area. A red-lined check print is enclosed for the applicant’s use in the final design. If you or the applicant have any questions, please either see or call me at extension 4501. ’ FRANKJ. JIMENO Associate Engineer C Principal Civil Engineer - Land Development