HomeMy WebLinkAboutPIP 99-01; Carlsbad Oaks Lot 7; Planned Industrial Permit (PIP) (7)CITY OF CARLSBAD ENGINEERING DEPARTMENT LAND USE REVIEW November 16,1999 TO: Greg Fisher - Assistant Planner FROM: David Rick - Assistant Engineer ISSUES REVIEW PROJECT ID: PIP 99-01 CARLSBAD OAKS LOT 7 The Engineering Department has completed its review of the above referenced project for compliance with the previously determined issues. The project still has issues which must be addressed. The following is a list of these issues: 1. On the site plan, sheet A-1, the side property lines are shown midway between the slopes suggesting that cross lot drainage is proposed. Revise plans so that the subject lot does not drain onto the adjacent lots as is shown on the grading plan, sheet C-1 . 2. Grade level bay doors are shown along the north elevation yet no truck access is provided. The site plan and grading plan indicate that parking stalls, curb, and landscaping is proposed in front of these doors. If the bays are mistakenly shown on the elevations, please remove them from the plan. Otherwise, redesign the circulation to permit truck access to the bays. 3. According to the top-of-walVbottom-of-wall elevation at the midpoint of the retaining wall, the wall height is 4.5 feet high, not 6 feet. Please revise accordingly. All other corrections made appear to be satisfactory. If you or the applicant have any questions regarding the above, please either see or call me at extension 4324. %?" Davt Rick Engineering Technician - Land Use Review H:VIBRARnENG\WPDATA\MISC\COMPREV