HomeMy WebLinkAboutPP 24F; Plaza Camino Real Bus Turnout; Precise Plan (PP) (2)City of Carlsbad
Planning Department
PLANNING COMMISSION
NOTICE OF DECISION
May5, 1994
Tom Lichterman
North County Transit District
311 So. Tremont Street
Oceanside, CA 92054
RE: PP 24(F) - PLAZA CAMINO REAL BUS TURNOUT
At the Planning Commission meeting of April 20, 1994, your application was considered.
The Commission voted 6-0 to RECOMMEND APPROVAL of your request. Some
decisions are final at Planning Commission, and others automatically go forward to City
Council. If you have any questions regarding the final dispositions of your application,
please call the Planning Department at (619) 438-1161.
Sincerely,
MICHAEL J. HOLZMILLER
Planning Director
MJH:CD:vd
Enclosed: Planning Commission Resolution No. 3640 and 3641.
2O75 Las Palmas Drive • Carlsbad, California 92OO9-1576 (619) 438-1 161
• t
APRIL 8, 1994
TO: ASSISTANT PLANNING DIRECTOR
FROM: City Attorney
PLANNING COMMISSION MEETING OF APRIL 20, 1994
In my memo earlier today, I stated that the parking lot at El
Camino Real is owned by the City and leased to the Parking
Authority. Actually, the parking lot is owned by the Parking
Authority and leased to the City. The City, the Parking Authority
and Plaza Camino Real, a Limited Partnership,, entered into an
agreement whereby Plaza Camino Real operates and maintains the
parking lot. It is very similar to a lease but not technically a
lease. CenterMark Properties, Inc., is a general partner of Plaza
Camino Real.
If you have any questions about this, please let me know.
(T/Z<-^i.—^-x.
KAREN J. HIRATA
Deputy City Attorney
afd
c: Senior Management Analyst, Planning
APRIL 8, 1994
TO: ASSISTANT PLANNING DIRECTOR
FROM: City Attorney
PLANNING COMMISSION MEETING/APRIL 20, 1994
I have reviewed the staff reports for the above-referenced meeting,
with the exception of the report on the Carlsbad Municipal Golf
Course which is due to be distributed early next week. I have the
following comments:
CALIFORNIA .CAFE AND DELI/CUP 88-18fA>
Condition No. 3 of Resolution No. 3622 should be deleted.
According to Bob Greaney, this is an outdated condition which no
longer applies since the Carlsbad Municipal Water District has
merged with the City. Please delete this condition from the
planning department's list of standard conditions.
PLAZA CAMINO REAL BUS TURN-OUT/PP 24 f Fl
1) The City of Carlsbad owns the Plaza Camino Real parking lot
but the City leases it to the Parking Authority. The Parking
Authority has a lease with the CenterMark Properties, Inc.
Please amend the staff report to show the Parking Authority as
a Lessee.
2) Wouldn't it be more accurate to amend Finding No. 3 in
Resolution No. 3640 to state that there will be no increase in
traffic generated by the proposed project? I also recommend
adding a finding stating that the project .-will reduce onsite
conflicts between vehicular traffic and bus traffic. This
gives greater support to the Negative Declaration. These two
changes would also be consistent with the EIA, sections 25, 27
and 29.
ENCINAS CREEK-MORGAN/GPA 93-03/LCPA 93-03/ZC 93-03
1) Please remove the references to "staff" in Finding No. 2 of
Resolution No. 3650. The findings must state what the
Planning Commission finds to be true, rather than staff's
opinion.
KAREN J. HIRATA
Deputy City Attorney
afd
c: Senior Management Analyst, Planning
CITY OF CARLSBAD
PARKING AUTHORITY
AGENDA
MARCH 14. 1994
4:00 P.M.
COUNCIL CONFERENCE ROOM
1. ROLL CALL
2. APPROVAL OF MINUTES:
Minutes of the Special Meeting held March 29, 1993
3. AUDIT FOR FISCAL YEAR 1992-93
4. PLAZA CAMINO REAL BUS TURNOUT REMODEL - PP-24(F)
5. PAYMENT OF BILLS
6. ELECTION OF OFFICERS FOR CALENDAR YEAR 1993
7. ADJOURNMENT
City of Carlsbad
Planning Department
February 24, 1994
Thomas Lichterman
North County Transit District
311 South Tremont
Oceanside, CA 92054
SUBJECT: PP 24(F) - PLAZA CAMINO REAL BUS TURNOUT
Your application has been tentatively scheduled for a hearing by the Planning Commission on
April 6, 1994. However, for this to occur, you must submit the additional items listed below.
If the required items are not received by March 10, 1994, your project will be rescheduled for
a later hearing. In the event that the scheduled hearing date is the last available date for the City
to comply with the Permit Streamlining Act, and the required items listed below have not been
submitted, the project will be scheduled for denial.
1. Please submit the following plans.
A) 14 copies of your complete set of plans (8 sheets) on 24" x 36" sheets of paper folded
into 8 1/2"x11"size.
B) One 8 1/2" x 11" copy of your reduced site plan.
2. As required by Section 65091 of the California Government code, please submit the
following information needed for noticing and sign the enclosed form:
A) Owners List - a typewritten list of names and addresses of all property owners within
a 600 foot radius of the subject, including the applicant or owner. The list shall include
the San Diego County Assessor's parcel number from the latest equalized assessment
rolls.
B) Mailing Labels - two (2) separate sets of mailing labels of the property owners within
a 600 foot radius of the subject property. The list must be typed in all capital letters,
left justified, and void of any punctuation. For any address other than a single family
residence, an apartment or suite number must be included. DO NOT TYPE
ASSESSOR'S PARCEL NUMBER ON LABELS. Do not provide addressed envelopes -
PROVIDE LABELS ONLY.
2O75 Las Palmas Drive • Carlsbad, California 92OO9-1 576 - (619)438-1161
PROJECT NUMBER
DATE
Page 2
C) Radius Map - A map to scale, not less than 1" = 200', showing all lots entirely and
partially within 600 feet of the exterior boundaries of the subject property. Each of
these lots should be consecutively numbered and correspond with the property owner's
list. The scale of the map may be reduced to a scale acceptable to the Planning
Director if the required scale is impractical.
D) Fee - A fee (check payable to the City of Carlsbad or cash only) shall be paid for
covering the cost of mailing notices. Such fee shall equal the current postage rate
times the total number of labels.
Sincerely yours,
CHRIS DECERBO
Project Planner
Attach
CDD:lh
I HEREBY CERTIFY THAT THE PROPERTY OWNERS LIST AND LABELS SUBMITTED TO
THE CITY OF CARLSBAD ON THIS DATE REPRESENT THE LATEST AVAILABLE
INFORMATION FROM THE EQUALIZED ASSESSOR'S ROLES.
APPLICATION NAME AND NUMBER
APPLICANT OR APPLICANT'S REPRESENTATIVE
BY
DATE
RECEIVED BY
DATE
I
February 18, 1994
TO: LEE RAUTENKRANZ
FROM: Planning Department
SUBJECT: PLAZA CAMINO REAL BUS TURNOUT - PP-24(F)
This application is a request from the North County Transit District (NCTD) to remodel and
expand the existing North County Transit District bus transfer/pickup parking area at Plaza
Carnino Real. The existing NCTD bus transfer/parking facility at Plaza Camino Real is
located along the shopping center's entry driveway off of Marron Road immediately west
of the Robinsons-May Company Department store. The existing driveway currently
accommodates automobile and truck traffic as well as serving as a bus transit center. The
proposed modification would convert this multi-use driveway/five space bus transit center
to an exclusive use bus driveway with eight bus loading bays and transit island. The NCTD
is proposing this modification to the existing transit center for purposes of: 1) responding
to existing and anticipated bus ridership demand, 2) creating a more attractive and
functional bus-transit center, and 3) eliminating the need for buses to travel through the
Plaza Camino Real parking lot to exit the site.
This project was previously heard before the Planning Commission and unanimously
recommended for approval on February 20, 1991. However, because the North County
Transit District did not at that time have the unanimous support of all mall anchor tenants,
this project could not be heard by the City Council. On October 15, 1993, Centermark
Properties, Inc., the managing general partner of Plaza Camino Real, submitted a letter to
the City indicating consensus support of all anchor stores for this project.
City staff, Centermark Properties, and the NCTD have negotiated this proposal, and all
conclude that this is a good solution. Since the City Parking Authority is the owner of the
property upon which this project is proposed, Planning staff requests that members of the
Parking Authority be informed of this proposal as required. If there are any questions or
concerns regarding this proposal, please contact Chris DeCerbo at 438-1161 xt 4445.
CHRIS DECERBO
Senior Planner
CD/b
I S
City of Carlsbad
Planning Department
February 17, 1994
Thomas Lkhterman
North County Transit District
311 South Treton Street
Oceanside, CA 92054
SUBJECT: PLAZA CAMINO REAL BUS TURNOUT - PP 24(F)
Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning Department
has reviewed your Precise Plan Amendment, application no. PP 24(F), as to its completeness for
processing.
The items requested from you earlier to make your Precise Plan Amendment, application no. PP
24 (F) complete have been received and reviewed by the Planning Department. It has been
determined that the application is now complete for processing. Although the initial processing of
your application may have already begun, the technical acceptance date is acknowledged by the
date of this communication.
Please note that although the application is now considered complete, there may be issues that
could be discovered during project review and/or environmental review. Any issues should be
resolved prior to scheduling the project for public hearing. In addition, the City may request, in
the course of processing the application, that you clarify, amplify, correct, or otherwise, supplement
the basic information required for the application.
Please contact your staff planner, Chris DeCerbo, at (619) 438-1161 extension 4445, if you have
any questions or wish to set up a meeting to discuss the application.
Sincerely,
MICHAEL J. HI
Planning Director
MJH:CD:lh
c: Gary Wayne
Team Leader
Bobbie Hoder
Bob Wojcik
File Copy
Data Entry
Marjorie/Rich
2O75 Las Palmas Drive • Carlsbad, California 92OO9-1576 • (619)438-1161
EW AND COMMENT MEMO(
DATE:
TO:
FEB. 17.. 199U REVISED PLAN
FROM:
ENGINEERING DEPARTMENT
GROWTH MANAGEMENT (MEMO ONLY)
POLICE DEPARTMENT - ATTN: J. SASWAY
FIRE DEPARTMENT
BUILDING DEPARTMENT
PARKS AND RECREATION DEPARTMENT
UTILITIES/MAINTENANCE DEPARTMENT
WATER DISTRICT
LANDSCAPE PLANCHECK CONSULTANT
SCHOOL DISTRICT
NORTH COUNTY TRANSIT DISTRICT - 311 S. Tremont Street,
Oceanside, CA 92054-3119
CITY CLERK - LEE RAUTENKRANTZ
Always Send Exhibits
Planning Department
REQUEST FOR REVIEW AND COMMENT ON APPLICATION NO. PP 24fF)
NOTE: PLEASE USE THIS NUMBER ON ALL CORRESPONDENCE CONCERNING THIS
APPLICATION.
PROJECT TITLE:PLAZA CAMINO REAL BUS TURNOUT
APPLICANT:NORTH COUNTY TRANSIT DISTRICT
PROPOSAL:REMODEL EXISTING BUS TRANSFER/PICK UP
PARKING AREA TO A LARGER TURNOUT & TURNAROUND
PROJECT PLANNER:CHRIS DeCERBO
Please review and submit written comments and/or conditions to the Planning Department
by FEB. 23. 1994 If not received by that date, it will be assumed that you have
no comment and the proposal has your endorsement as submitted.
THANK YOU
COMMENTS:
t •
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
LAND USE REVIEW
TO: SENIOR PLANNER - CHRIS DECERBO _ DATE: FEB 15. 1994
FROM: Assistant Engineer - Land Use Review ^* PROJECT ID: PD 24E
VIA: ASST. CITY ENGINEER
PLAZA CAMINO REAL BUS TURNOUT
PROJECT REPORT AND CONDITIONS TRANSMITTAL
The Engineering Department has completed its review of the above referenced project and is
recommending:
X That the project be approved subject to the conditions as listed on the attached sheet.
_ That the project be denied for the following reasons:
The following is a final Land Use Review project report for inclusion in the staff report
for this project.
t t
LAND USE REVIEW DIVISION
PROJECT REPORT
PROJECT ID: PD 24E PREPARED BY: Assistant Engineer- M. Shirey
PROJECT NAME: Plaza Camino Real Bus Turnout APPROVED BY: x^^v
LOCATION: Plaza Camino Real
BRIEF DESCRIPTION: Expand existing bus transfer station facility.
ENGINEERING ISSUES AND DISCUSSION:
Traffic and Circulation:
Projected Average Daily Traffic (ADT): N/A * see below
Traffic Study Performed by: Barton-Aschman Associates, Inc.
Projected Average Daily Traffic (ADT) figures were not included in the traffic
report due to the type of facility. However, the existing four bus capacity of
the facility is being expanded to an eight bus capacity. Traffic counts
conducted at the mall indicate that this driveway accomodates approximately
2000 of the approximate 30,000 ADT, or only 8 percent of the total traffic
generated by the mall. As such, this driveway primarily functions as secondary
access to the mall. Therefore, making this driveway into a cul-de-sac with
exclusive use as a bus transfer station will have no negative impacts on the
surrounding circulation system.
SEWER
Sewer District: Carlsbad Water District
Sewer EDU's Required: N/A
No major sewer issues are associated with this project.
WATER
Water District: Carlsbad Water District
EDU's Required: N/A
No major water issues are associated with this project.
t t
GRADING
Quantities: N/A
Permit Required: DYES S NO
Offsite Approval required/obtained L~H Yes Ixl NO
Hillside Grading Requirements met: D YES D NO H N/A
Preliminary Geotechnical Investigation Performed by: N/A
No major grading issues are associated with this project.
DRAINAGE AND EROSION CONTROL:
Drainage Basin: A
Preliminary Hydrology Study Performed by: N/A
Erosion Potential: 13 Low D Medium D High
No major drainage issues associated with this project.
LAND TITLE:
Conflicts with existing easement: D YES D NO Ixl N/A *see below
Easements dedication required: D YES D NO D3 N/A *see below
Site boundary coincides with Land Title: D YES D NO El N/A *see below
A Preliminary Title Report (PTR) was not provided, therefore this information
is unknown. However, the area where the expanded bus transfer facility is
located is under the ownership of the City of Carlsbad Parking Authority.
Therefore, the project is located within the boundaries of a public agency.
IMPROVEMENTS:
Offsite improvements: D YES 0 NO
Standard Variance required: D YES Q NO
No offsite improvements are associated with this project.
t
PD 24E: PLAZA CAMINO REAL BUS TURNOUT
CONDITIONS OF APPROVAL
ENGINEERING CONDITIONS:
34. Unless a standards variance has been issued, no variance from City Standards
is authorized by virtue of approval of this site plan.
35. The applicant shall comply with all the rules, regulations and design
requirements of the respective sewer and water agencies regarding services to
the project.
36. The applicant shall be responsible for coordination with S.D.G.&E., Pacific Bell
Telephone, and Cable TV authorities.
45A. Prior to building permit issuance the applicant shall pay all current fees and
deposits required.
72. Plans, specifications, and supporting documents for all (PUBLIC) improvements
shall be prepared to the satisfaction of the City Engineer prior to issuance of a
right of way permit. The applicant shall install improvements as shown on the
site plan. All improvements will be done under the purview of a right of way
permit. No bonding or security agreements will be required.
75. The applicant shall install wheelchair ramps at the public street corners abutting
the project site in conformance with City of Carlsbad Standards prior to
occupancy of any buildings.
76. The structural section for the access aisles must be designed with a traffic
index of 5.0 in accordance with City Standards due to bus access. The
structural pavement design of the aisle ways shall be submitted together with
required R-value soil test information and approved by the City as part of the
building site plan review.
EW AND COMMENT MEMO t
DATE:
TO:
FEB. 17. 1994
FROM:
REVISED PLAN 0
ENGINEERING DEPARTMENT
GROWTH MANAGEMENT (MEMO ONLY)
POLICE DEPARTMENT - ATTN: J. SASWAY
FIRE DEPARTMENT
BUILDING DEPARTMENT
PARKS AND RECREATION DEPARTMENT
UTILITIES/MAINTENANCE DEPARTMENT
WATER DISTRICT
LANDSCAPE PLANCHECK CONSULTANT
SCHOOL DISTRICT
NORTH COUNTY TRANSIT DISTRICT - 311 S. Tremont Street,
Oceanside, CA 92054-3119
CITY CLERK - LEE RAUTENKRAN'
Always Send Exhibits
Planning Department
REQUEST FOR REVIEW AND COMMENT ON APPLICATION NO. PP 24fF)
NOTE: PLEASE USE THIS NUMBER ON ALL CORRESPONDENCE CONCERNING THIS
APPLICATION.
PROJECT TITLE:PLAZA CAMINO REAL BUS TURNOUT
APPLICANT:NORTH COUNTY TRANSIT DISTRICT
PROPOSAL:REMODEL EXISTING BUS TRANSFER/PICK UP
PARKING AREA TO A LARGER TURNOUT & TURNAROUND
PROJECT PLANNER:CHRIS DeCERBO
Please review and submit written comments and/or conditions to the Planning Department
by FEB. 23. 199U If not received by that date, it will be assumed that you have
no comment and the proposal has your endorsement as submitted.
THANK YOU
COMMENTS:
RECOMMEND GRAFFITI PROOF FINISHES FOR ALL STREETSCAPE
AMENITIES AS POSSIBLE
PLANS ATTACHED FRM0020 8/92
t
N C T D
February 8, 1994
01304
b~'i
Mr. Michael Hblzmiller
Planning Director
City of Carlsbad
2075 Las Palmas Drive
Carlsbad, CA 92009-4859
SUBJECT: Plaza Camino Real Bus Turnout - PP 24 (F)
Dear Mr. Hblzmiller,
This letter and package of submittals is in response to your letter of
December 16, 1993 listing items needed to complete NCTD's application for
the Plaza Camino Real Bus Turnout, No. PP 24 (F). The responses to your
lists of items and issues are as follows:
LIST OF ITEMS NEEDED TO COMPLETE APPLICATION:
1. Identify the existing zone (C-2) and Land Use (RRI) on the site plan.
RESPONSE: These items have been indicated on a new Sheet, No. 1A,
"Site Plan - Existing Conditions", and "Site Plan - Parking Lot
Layout". Ten (10) copies of Sheet 1A are submitted with this letter.
2. Plot the location of the nearest mall buildings on the site plan.
RESPONSE: This has been indicated on Sheet 1A.
3. Identify the height and sign area of the information sign.
RESPONSE: The sign will be no more than 72" in overall height. The
sign area will measure 3' by 4'. This information has been added to
sheet No. 5. Ten (10) new copies of sheet No. 5 showing this
modification have been submitted with this letter.
4. Provide a site plan exhibit (24" X 36") which shows the existing
parking lot layout in the proposed area of revision. Identify parking
spaces to be deleted.
RESPONSE: This information has all been provided on the new sheet, No.
1A, submitted as per above.
5. Provide one copy of a 8 1/2" X 11" location map (suggested scale of
200").
RESPONSE: This location map is submitted with this letter.
NORTH COUNTY TRANSIT DISTRICT
311 South Tremont Street, Oceonside, CA 92054
619-967-2828
6. Include application type/number (PP 24 (F)) en site plan.
RESPONSE: This number has been added to new sheet No. LA, Site Plan.
Based en our architect's discussion with City staff, indicating this
en the new sheet is sufficient to meet City requirements.
ISSUES OF CONCERN:
Planning:
1. No connercial advertising shall be permitted en bus shelters,
information sign or concrete seat walls.
RESPONSE: Agreed. NCTD has no plans to place any advertising in the
facility. We do plan to put bus schedule information in the shelters,
and place a directory showing the layout of the facility in the
information sign referred to above.
Engineering:
1. A maintenance agreement with the City may be needed.
RESPONSE: We believe such an agreement may be needed, and would
probably be a three-way agreement involving the City, the mall parking
lot management entity, and NCTD. We would appreciate your guidance as
to whom in the City we should work with on this.
2. A maintenance agreement with mall parking lot management entity may be
needed.
RESPONSE: Agreed, per above.
3. Some type of lease agreement may be needed.
RESPONSE: NCTD has been operating a bus transfer center at the
existing location in the Plaza Camino Real parking lot since the late
1970's under existing operating agreements. We are unclear as to the
background on this area of concern, and request further clarification
from the City staff.
NCTD believes that, with this submittal, we have fully complied with all
previous and current City requirements for the filing of application No.
PP 24(F). At this time, NCTD respectfully requests the City's assistance
in expediting the final review of this project and scheduling it for the
public hearing process. This project represents an important improvement
in the provision of public transit service in the City of Carlsbad, and
the construction "window" is rapidly shrinking before the 1994 holiday
shopping season makes construction impossible this year.
ft
Thank you in advance for your efforts to make this project a reality.
Sincerely,
Thomas Lichtenran
Manager of Operations
cc: Richard L. Fifer
Robert A. Durant
Ralph Hawkinson
George Johnson
ENCLOSURES
I
City of Carlsbad
Planning Department
December 16, 1993
Thomas Lichterman
North County Transit District
311 So. Tremont
Oceanside, CA 92054
SUBJECT: PLAZA CAMINO REAL BUS TURNOUT - PP 24(F)
Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning Department
has reviewed your Precise Plan, application no. PP 24(F), as to its completeness for processing.
The application is incomplete, as submitted. Attached are two lists. The first list is information
which must be submitted to complete your application. This list of items must be submitted directly
to your staff planner by appointment. All list items must be submitted simultaneously and a copy
of this list must be included with your subnu'ttals. No processing of your application can occur until
the application is determined to be complete. The second list is issues of concern to staff. When
all required materials are submitted the City has 30 days to make a determination of completeness.
If the application is determined to be complete, processing for a decision on the application will be
initiated. In addition, please note that you have six months from the date the application was
initially filed, November 18, 1993, to either resubmit the application or submit the required
information. Failure to resubmit the application or to submit the materials necessary to determine
your application complete shall be deemed to constitute withdrawal of the application. If an
application is withdrawn or deemed withdrawn, a new application must be submitted.
Please contact your staff planner, Chris DeCerbo, at (619) 438-1161 extension 4445, if you have
any questions or wish to set up a meeting to discuss the application.
Sincerely,
MICHAEL J. HOLZMILLER
Planning Director
MJH:CD:vd
Gary Wayne
Bobbie Hoder
Bob Wojcik
File Copy
Data Entry
Marjorie/Rich
2O75 Las Palmas Drive • Carlsbad, California 92OO9-1576 • (619)438-1161
I
LIST OF ITEMS NEEDED
TO COMPLETE APPLICATION:
No. PP 24(F) - Plaza Camino Real Bus Turnout
PLANNING:
1. Identify the existing zone (C-2) and Land Use (RRI) on the site plan.
2. Plot the location of the nearest existing mall buildings on the site plan.
3. Identify the height and sign area of the information sign.
4. Provide a site plan exhibit (24" x 36") which shows the existing parking lot layout in the
proposed area of revision. Identify parking spaces to be deleted.
5. Provide one copy of a SVi" x 11" location map (suggested scale of 200").
6. Include application type/number (PP 24(F)) on site plan.
j
ISSUES OF CONCERN
PLANNING:
1. No commercial advertising shall be permitted on bus shelters, information sign or concrete
seat walls.
ENGINEERING:
1. A maintenance agreement with the City may be needed.
2. A maintenance agreement with mall parking lot management entity may be needed.
3. Some type of lease agreement may be needed.
3UENA VISTA CPEEX
ENNEY BLDG
:r*H
LOWER LEVEL PARKING i 5"i*£ .*
-•• (23 XH KH. !t-.. iH '-.HH *••:.
JC PENNEY PARCEL
JCFfenney
2 levels
UPPER LEVEL PARKING
592scr -:•=
. PHASE 1\
-. PARCEL -.I LEVEL PARKING
il71Sja CINEMA PLAZA
PROJECT SITE
PLAZA CAMINO REAL BUS TURNOUT
LOCATION MAP
SCALB 1' - 200'
P&D Technologfej
DECEMBER 14, 1993
TO: CHRIS DECERBO
FROM: Jim Davis acting for Mike Shirey
VIA PRINCIPAL CIVIL ENGINEER OF LUR_
PP 24E, PLAZA CAMINO REAL BUS TURNOUT
We have reviewed the plans and application. The application is deemed complete for engineering
purposes even though the application lacks a title report. The plan is the same as was approved
before. Therefore we are finding the application complete with no significant issues.
MINOR ISSUES
The project involves expansion of the bus site on City property that furnishes parking for the
mall. Although the project has had prior approval, all issues related to the expansion may not
have been addressed and it appears worthwhile to (re)state the issues we see at this time:
A. A maintenance agreement with the City may be needed.
B. A maintenance agreement with mall parking lot management entity may be
needed.
C. Some type of lease agreement may be needed.
H:\LIBRARY\ENG\WPDATA\DAVIS\PLAZABUS.ISU
:mn
PROPERTIES
JAMES F. DAUSCH
EXECUTIVE VICE PRESIDENT
DEVELOPMENT/NEW BUSINESS
October 15, 1993
Mr. Ray Patchett, City Manager
City of Carlsbad
1200 Carlsbad Village Drive
Carlsbad, CA 92009-1576
Re: Transit Center - Plaza Camino Real
Dear Mr. Patchett:
CenterMark Properties, Inc., is the Managing General Partner of Plaza
Camino Real. This letter will confirm to you that all of the anchor stores have
reviewed the plans for the proposed Transit Center at Plaza Camino Real and
have given the approvals required by the Reciprocal Easement Agreement
covering the shopping center. CenterMark Properties also supports the
proposed transit center, based on the traffic enhancement it may bring, as well
as the improved convenience it will afford public transportation patrons and
residents of Carlsbad who shop at Plaza Camino Real.
Sincerely,
Jams F. Dausch
cc: Mr. Michael Holzmiller, Director of Planning
Community Development Department
2075 Las Palmas Drive
Carlsbad, CA 92009-1576
Mr. Ron Burns
CenterMark Properties, Inc. 611 Olive Street Suite 1555 St. Louis, Missouri 6 3101.1 797 Telephone 314.342 . 6200
A Subsidiary ol The!PirMl2S3tt£j (£S