HomeMy WebLinkAboutPS 89-94; Research Court Monument; Sign Permits/Programs (PS)City of Carl sbad 2075 Las Palmas Drive
Carl sbad, CA 92009 (619) 438-1161
SIGN PERMITS
SIGN
REC '
DATE
SIGN
RECEIPT NO.
APPLICANT MUST SUBMIT THREE (3) SETS OF SIGN/SITE PIANS. Average processing Time: 2 weeks
NAME OF PROJECT: /?4SPwd &rt fl@Wmh p
SIGN TYPE: 8 (b) Industrial (c) Residential
(e) Freeway (f) Marquee (9) Community identity (h) Service Stn. Prices (I) Campaign
SIGN PROGRAM AND/OR
SPECIFIC PLAN CRITERIA: Yes I/ No - SPECIFIC PLAN NUMBER
VILLAGE REDEVELOPMENT AREA Yes No - **REQUIRES VR APPROVAL
SIGN ORDINANCE: Yes v No
COASTAL ZONE: Yes NO J/COASTAL PERMIT Yes No -
EXISTING SIGNS: TvDe Number
(a) Pole 0
(b) Monument 0
(c) Wall 0
- Size
PERMITS ISSUED FOR EXISTING SIGNS: Yes No - Date
BUILDING FRONTAGE: (Building street frontage) &'# ft. EXISTING SIGNS (SQ. FT.): 0 sq. ft. REMAINING SIGN ALLOWANCE (AT PRESENT) : PROPOSED SIGN:
REMAINING SIGN ALLOWANCE (AFTER THIS SIGN): sq. ft.
PLANNER CHECK LIST:
1. Field check by planner.
2. Within maximum length, area.
3. Style consistent with Specific Plan criteria, if applicable.
4. Location: In right-of-way
In visibility triangle at corner On roof
visibility issues.
5. Pole and monument signs to be checked by Bob Johnson, Traffic Engineer, for
APPROVED: P1 anner: Date :
',,.. ""F . - ..
CITY OF CARLSBAD
1200 ELM AVENUE CARLSBAD, CALIFORNIA 92008
438.5621
REC'D FROM ATE
ACCOUNT NO. DESCRIPTION
~
AMOUNT
I I ~ I
. ". . . . . . . -. "
4
~~ ~
Mortar or masonry
when steal required
Locate steel in
center of wall
~ ~~ ~~
ca P
Walls constructed as shown here will be considered as acceptable by
the City of San Diego Inspection Department.
"- . "
CONCRETE FOR FOOTING, 1 Part cement 2% parts sand 3% parts gravel.
MORTAR MIX: 1 Part cement !4 10 %. part hydrated lime or lime putty.
3'1: parts sand or 1 part plastic cement and 3 parts sand.
GROUT: Same as mortar mix, water added to pouring consistent/.
All cells containing stccl to be solidly filled with grout.
Rod or vibrate pout within 10 min. of pouring to irlsure solid
consolidation.
INSPECTIONS: 1. Call for foundation inspi ction after foo5hy'has tlc:c!; iornwd
and steel is tied securely in fir?al position, al:d before cd<,cirLg
concrete.
2. Cdll for second Inspt'cflon aftcr thc blocks have bcer1 laid 111) tL)
the full Iwight of thc wi~ll, with stccl in pl;:ce, but b!::oro thc grout
is poured. 3. Call for fin;ll i~lspxtion c.llcq1 011 work is conlplctctf.
MASONRY FENCE DETAILS E1D 7
m
motlvlQtlollQl
"
823 w 23rd ST. NATIONAL CITY CA 92050 619/474-8246
1240 RAILROAD ST
CORONA CA 91 720 7141734-3970
4749 W POSITAS ROAD, SUITE L LIVERMORE CA 94550 4 151449- 1900
&LiE 2 JGNTYPE
3d-L MON
'ART OF