HomeMy WebLinkAboutPUD 00-112; Atrium II; Planned Unit Development - Non-Residential (PUD) (2)•^r ~~~ City of Carlsbad Planning Department January 4, 2001 Newport National Corporation 2117 Industrial Court, Suite E Vista, CA 92083 SUBJECT: PUD 00-112/PIP87-02(A) - ATRIUM II Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning Department has reviewed your Nonresidential Planned Unit Development and Planned Industrial Permit Amendment, application no. PUD 00-112 and PIP 87-02(A), as to its completeness for processing. All of the items requested of you earlier have not been received and therefore your application is still deemed incomplete. Listed below are the item(s) still needed in order to deem your application as complete. This list of items must be submitted directly to your staff planner by appointment. All list items must be submitted simultaneously and a copy of this list must be included with your submittals. No processing of your application can occur until the application is determined to be complete. When all required materials are submitted the City has 30 days to make a determination of completeness. If the application is determined to be complete, processing for a decision on the application will be initiated. In addition, please note that you have six months from the date the application was initially filed, October 17, 2000, to either resubmit the application or submit the required information. Failure to resubmit the application or to submit the materials necessary to determine your application complete shall be deemed to constitute withdrawal of the application. If an application is withdrawn or deemed withdrawn, a new application must be submitted. Please contact your staff planner, Paul Godwin, at (760) 602-4625, if you have any questions or wish to set up a meeting to discuss the application. Sincerely, MICHAEL J. HOLZMILLER Planning Director MJH:PG:mh c: Chris DeCerbo Jeremy Riddle File Copy Data Entry Planning Aide 1635 Faraday Avenue • Carlsbad, CA 92008-7314 • (760) 602-4600 • FAX (760) 602-8559 • www.ci.carlsbad.ca.us LIST OF ITEMS NEEDED TO COMPLETE THE APPLICATION No. PUD 00-112/PIP 87-02(A) Planning: None. Engineering: 1. On the site plan identify the projected average daily traffic (ADT) for the proposed project utilizing latest SANDAG figures. 2. Provide a Soils Report addressing the feasibility and recommendations associated with the proposed project. Identify if there is anticipated remedial grading required for the project. ISSUES OF CONCERN Planning: None. Engineering: 1. On the site plan and conceptual grading plan include the proposed driveway slope as it approaches Loker Avenue. Refer to redline set of plans for guidance. 2. On the site plan and conceptual grading plan add symbols to clarify hardscape between the rolled curb and the existing access-hole. The hardscape could consist of PCC, grasscrete or asphalt. 3. One the conceptual landscape plan, call out the size and type of the existing public sewer main and call out all existing access-holes. Also add call outs to ensure that deep-rooted landscaping will not be installed over the existing public sewer main. Also depict the line-of-sight at the driveway entrance looking onto Loker Avenue using Caltrans Standards. The conceptual landscape plan was not included with this second review to verify if these previous issues were addressed. 4. On the conceptual grading plan, indicate how a truck (per Caltrans 407-E) with a 42-foot turning radius will circulate throughout the site. Depict the inside and outside turning radius of the truck at all critical turns to demonstrate feasibility. This is required to demonstrate feasibility of trash trucks and fire trucks traversing the site. 5. Address redlines as noted on the returned site plan and conceptual grading plan. 6. Attached is a redlined print of the project with engineering staff comments. Please be advised, this check print must me returned with the revised plans to facilitate continued staff review. City of Carlsbad Planning Department November 15, 2000 Newport National Corporation 2117 Industrial Court Suite E Vista, CA 92083 SUBJECT: PUD 00-112/PIP87-02(A) - ATRIUM II Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning Department has reviewed your Nonresidential Planned Unit Development and Planned Industrial Permit Amendment, application no. PUD 00-112 and PIP87-02(A), as to its completeness for processing. The application is incomplete, as submitted. Attached are two lists. The first list is information which must be submitted to complete your application. This list of items must be submitted directly to your staff planner by appointment. All list items must be submitted simultaneously and a copy of this list must be included with your submittals. No processing of your application can occur until the application is determined to be complete. The second list is issues of concern to staff. When all required materials are submitted the City has 30 days to make a determination of completeness. If the application is determined to be complete, processing for a decision on the application will be initiated. In addition, please note that you have six months from the date the application was initially filed, October 16, 2000, to either resubmit the application or submit the required information. Failure to resubmit the application or to submit the materials necessary to determine your application complete shall be deemed to constitute withdrawal of the application. If an application is withdrawn or deemed withdrawn, a new application must be submitted. Please contact your staff planner, Paul Godwin, at (760) 602-4625, if you have any questions or wish to set up a meeting to discuss the application. Sincerely, \/\b4w^ MICHAELJ>HOLZ1VIILLER Planning Director MJH:PG:cs Chris DeCerbo Jeremy Riddle File Copy Data Entry Planning Aide 1635 Faraday Avenue • Carlsbad, CA 92008-7314 • (760) 602-4600 • FAX (760) 602-8559 • www.ci.carlsbad.ca.us LIST OF ITEMS NEEDED TO COMPLETE THE APPLICATION No. PUD 00-112/PIP 87-02(A) Planning: None. Engineering: 1. On the site plan identify the projected average daily traffic (ADT) for the proposed project utilizing latest SANDAG figures. 2. On the site plan include the distance from the project driveway to the southerly intersection with Palomar Airport Road. 3. On the site plan and conceptual grading plan, identify the record document that secures the reciprocal access easements for the shared driveway entrance with the adjacent property. Provide a copy for our records. 4. On the site plan provide sufficient dimensions on the site plan to clearly identify the size of parking stalls and drive aisle widths. 5. On the site plan and conceptual grading plan depict and call-out all existing underground facilities along the project frontage of Loker Avenue (size, type, hydraulic grade line, reference drawings, etc.) 6. Provide a Soils Report addressing the feasibility and recommendations associated with the proposed project. Identify if there is anticipated remedial grading required for the project. 7. Provide a title report for the subject property. 8. Provide a hydrology study that addresses storm flows experienced by the site and what measures are required in order to intercept the flows. Identify measures to ensure that post-development storm flows do not exceed pre-development storm flows. 9. Revise the site plan to depict all proposed easements. The current one only shows existing easements. 10. Revise the site plan to show the existing and proposed facilities required to serve the project. ISSUES OF CONCERN Planning: 1. Please include employee eating area calculations on plans. 2. Please show proposed roof screening plan. Engineering: 1. The updated National Pollution Discharge Elimination System (NPDES) permit is nearing approval, and would involve significant changes to this project and other projects processed throughout the San Diego region. It is our understanding that these changes would not include a grandfather clause for projects. This means that this project and all other projects will be immediately impacted pursuant to the approved NPDES requirements, no matter what stage projects are in. We encourage you to review the draft permit requirements so that you understand the nature of our comments when they are made on projects. In order to facilitate compliance of this project, the following are some criteria that should be incorporated into the design of the project: a) Post development run-off should not exceed pre-development run-off. This shall be certified via engineering calculations in the project hydrology/hydraulic report. Revise the plans to show all provisions to ensure no increase storm flows via methods such as detainment areas, ponded parking lots, detention basins, etc. b) On parking lot areas, include additional measures required to capture anticipated pollutants from the site. More often than not, grass-lined swales should be utilized to filter storm water before entering inlets. Fossil-filters alone may not be sufficient to capture all pollutants. c) Offsite and downstream siltation would not be permitted at any time during the project (long term or near term). 2. On the site plan and conceptual grading plan depict the preliminary location of irrigation and fire sprinkler service connections required to serve the project. Revise the legend to include all necessary symbols and call-outs. 3. Revise the conceptual grading plan and the site plan to include minimum 24-foot drive aisles. A 21.5 foot aisle is un acceptable. 4. Coordinate all elements of the project between the site plan and the conceptual grading plan. Missing items will lead to discrepancies in the project design (trash enclosures, water meter construction, etc.). 5. Consider having the site plan contain all the project information versus having a conceptual grading plan and a site plan. This may ease coordination and eliminate having duplicate information between the two drawings. 6. On the conceptual grading plan revise the topographic numbers so they are legible. 7. Revise the conceptual grading plan to identify how the northerly sump area drains. Identify the system that conveys storm water from this area. 8. Revise the site plan and conceptual grading plan to depict the location of the onsite storm drain system to ensure there are no conflicts with the project design. 9. On the site plan and conceptual grading plan clarify the granting of two types of easements. One should be a public waterline easement granted to the Carlsbad Municipal Water District. The other will be a access easement granted to the City of Carlsbad. 10. On the site plan and conceptual grading plan include the proposed driveway slope on the plans. 11. On the site plan and conceptual grading plan identify the paved width of the existing driveway. 12. On the site plan and conceptual grading plan provide vehicular access to the existing sewer access-hole as shown on the returned plan. City crews must be able to maneuver a vactor truck to the access-hole in order to perform maintenance or repairs as needed to this public facility. 13. On the site plan and conceptual grading plan locate and callout the proposed potable water and irrigation water meter close to each other for ease of meter-reader access. 14. On the site plan and conceptual grading plan ensure that all meter boxes are located within the proposed public water easement. This includes meters that are relocated as part of the project. 15. On the site plan, conceptual grading plan, and conceptual landscape plan add callouts to ensure that deep-rooted landscaping will not be installed over the existing public sewer main. 16. On the site plan, conceptual grading plan, and conceptual landscape plan callout the size and type of the existing public sewer main and callout all existing access-holes. 17. On the conceptual grading plan identify the location of the trash enclosure to serve Lotl 18. On the conceptual grading plan, indicate how a truck (per Caltrans 407-E) with a 42- foot turning radius will circulate throughout the site. Depict the inside and outside turning radius of the truck at all critical turns to demonstrate feasibility. 19. On the site plan, conceptual grading plan, and conceptual landscape plan depict the line-of-sight at the driveway entrance looking onto Loker Avenue using Caltrans Standards. 20. On the site plan and conceptual grading plan, depict the double detector check valve assembly of the fire service for the site (per CMWD standards). Ensure the double detector check valve is not located within public water easements, since are the responsibility of the owner. 21. On the site plan and conceptual grading plan, identify all measures required to ensure that post-development run-off does not exceed pre-development run-off. 22. Revise the project hydrology study to comply with the above item. 23. Address redlines as noted on the returned site plan, conceptual grading plan, and conceptual landscape plan. 24. Attached is a redlined check print of the project with Engineering staff comments. Please be advised, this check print must be returned with the revised plans to facilitate continued staff review. City of Carlsbad Planning Department August 8, 2000 Mr. Scott Brusseau Newport National Corporation 2117 Industrial Court, Suite C Vista, CA 92083 SUBJECT: PRE 00-50 - LOT 2 CARLSBAD OAKS BUSINESS PARK APN: 204-081-02-00 A preliminary review of your project was conducted on July 27, 2000. Listed below are the issues raised by staff. Please note that the purpose of a preliminary review is to provide you with direction and comments on the overall concept of your project. The preliminary review does not represent an in-depth analysis of your project. Additional issues of concern may be raised after your application is submitted and processed for a more specific and detailed review. Planning: 1. The subject site is located in the Planned Industrial (P-M) zone and in the Carlsbad Airport Center Specific Plan (SP 200). The General Plan Land Use designation is Planned Industrial (PI). The proposed project will be subject to all development standards, policies and provisions contained in these documents. Copies of these documents are available at the Development Services Planning Front Counter. 2. The overall request to develop a three-story office building on a site which presently contains an existing three-story office building is generally supported by staff. The use is allowed in the P-M zone and by the Carlsbad Airport Specific Plan, and all building setbacks have been met. 3. It will be necessary to amend the existing Planned Industrial Permit (PIP 87-02) for this site. The current fee for a Planned Industrial Permit Amendment is $1,250 and applications are available at the Development Services Planning Front Counter. 4. No building heights have been proposed. Building heights may not exceed 35', with a maximum of three stories. Height protrusions which do not exceed 45' and do not provide usable floor area may be allowed, pursuant to Sections 21.34.070(1) and 21.46.020 of the City of Carlsbad Municipal Code. Additional building height to a maximum of 45' may be approved by the Planning Director with increased setbacks at a ratio of one horizontal foot for every one foot of vertical construction beyond 35'. 5. Parking areas shall be planted with trees at the ratio of one tree per each five parking stalls. Parking islands shall be designed in conformance with the City of Carlsbad Landscape Manual. Parking stalls and aisle widths shall comply with the design standards outlined in Chapter 21.44 of the Carlsbad Municipal Code. 1635 Faraday Avenue • Carlsbad, CA 92008-7314 • (760) 602-46OO • FAX (760) 602-8559 PRE 00-50 - LOT 2 C/H.SBAD OAKS BUSINESS CENTER August 8, 2000 Page 2 6. All mechanical/roof equipment shall be completely screened from view in a manner which is architecturally compatible with the overall building design. 7. Employee eating areas shall be provided at the rate of 300 square feet per 5,000 square feet of building area. Amenities shall be provided within the outdoor eating area, as described in Chapter 21.30.070 of the Carlsbad Municipal Code. 8. A minimum of 15% of the building site shall be landscaped. Please comply with the requirements of the Carlsbad Airport Center Specific Plan and -the City of Carlsbad Landscape Manual. Engineering: 9. Please be advised that in order to make a more in-depth review of the proposed development, a more complete design of the project is required. 10. The proposed quitclaim of the existing sewer easement may only be considered if an access easement is granted to the City of Carlsbad in order to access the existing rear- lot facilities. See the plans for a preliminary layout of the access easement. 11. Identify if there are grade changes over the existing sewer and water mains. 12. Add symbols to the plans to identify the difference between existing and proposed improvements. 13. Depict the location of existing adjacent buildings and surface improvements. 14. Please indicate all existing and proposed utilities along Loker Avenue (i.e., storm drain, water, sewer, etc.) that will serve the development. Indicate gravity flow sewer facilities with invert elevations. The submitted plan does not depict any facilities, except sewer. 15. Depict all existing sewer and water facilities (onsite) and all their appurtenances (access holes, valves, fire hydrants, blow-offs, air-release valves) to identify if there conflicts with existing and proposed improvements. 16. Indicate all existing and proposed surface improvements (curb, gutter, sidewalk, paving, inlets, street lights, adjacent driveways, vaults, transformers, etc.) along property fronting Loker Avenue, and verify that no conflicts exist. 17. Identify the distance from the driveway to Palomar Airport Road. 18. Revise the plan to indicate the ADT (traffic), EDU's (sewer), GPM (potable water), and GPM (reclaimed water) generated or required by the proposed development. 19. Identify the anticipated ADT at the shared driveway serving Lot 1 and Lot 2. Clarify whether this will be a medium-use or high-use driveway. 20. Meet with the Fire Department to identify the necessary fire protection measures required for this project (access, fire hydrants, sprinklering, etc.). All proposed fire hydrants must be served by public water mains. PRE 00-50 - LOT 2 JK-SBAD OAKS BUSINESS CENTER August 8, 2000 Page 3 21. Show all existing and proposed topography and drainage patterns for the site. Revise the plans to indicate how on-site surface runoff is controlled. Identify the location, alignment, and discharge of any proposed drainage system. 22. Indicate the legal description of the proposed development. Indicate legal descriptions of all adjacent properties. 23. Provide a Vicinity Map on the site plan. 24. Submit the site plan at either a 1" = 40', or, 1" = 20' scale. 25. Indicate the volume of grading (cut, fill, import, export, remedial) proposed for the project in cubic yards. There is insufficient information provided to make a clear determination of whether a grading permit is required. 26. A Public Improvement will be required for modifications to existing facilities in order to avoid conflicts between existing and proposed facilities. 27. If slopes are proposed off-site, a private slope easement must be obtained from the adjacent property owner. 28. Delete any proposed parking spaces that are directly adjacent to a proposed drive aisle to avoid potential conflicts with vehicles backing out. 29. Provide a parking lot connection/outlet so that parking lot aisle lengths do not exceed 150-feet. 30. Show typical street sections of Loker Avenue that indicate existing and proposed improvements. 31. Dimension the site plan. Drive aisles must have a minimum width of 24'. Unless they are adjacent to a parallel loading area, then the drive aisle must have a minimum width of 32'. 32. Depict the location of trash enclosures required to serve the development. Call-out enclosures per Carlsbad Standard drawing GS-16. Identify how refuse trucks will maneuver throughout the site. 33. A recent Preliminary Title Report (PR) (issued within 6 months of formal application submittal) will be required for the proposed project. 34. All easements and encumbrances as identified in Schedule "B" of the PR must be indicated on the site plan. The future disposition of any easements and encumbrances must also be identified. 35. The complete property boundary must be shown on the site plan, which must include all bearings and distances. 36. Please indicate how a truck (per Caltrans 407-E) with a 42-foot turning radius will circulate throughout the site. PRE 00-50 - LOT 2 August 8, 2000 Page 4 cM_SBAD OAKS BUSINESS CENTER 37. Indicate how National Pollutant Discharge Elimination System (NPDES) criteria will be met. This could include, but not be limited to, doing one or a combination of the following: directing surface run-off through vegetated swales prior to discharge to a storm drain or the public right of way, constructing a gravel/sand/fossil filter system, constructing de-pollutant basins, etc. Also, any loading areas that are located in a sump must have pump facilities to direct drainage to a pollutant mitigation area. 38. Clarify whether a joint-use access easement has been secured for the southerly driveway (see original PIP conditions of approval). If not one should be obtained as part this application. 39. Indicate the line-of-sight at the driveway entrance looking north and south onto Loker Avenue using Caltrans guidelines. Verify no conflicts exist. 40. Provide a preliminary hydrology study that identifies the development discharge flows. The study should also identify preliminary recommendations on the anticipated storm drain infrastructure required as part of the development. 41. This preliminary review does not constitute a complete review of the proposed project, additional items of concern may be identified upon formal project application submittal. 42. A redlined check print is enclosed for the applicants use in making the requested revisions. This check print should be returned with the formal application submittal to facilitate continued staff review. Please contact Paul Godwin at (760) 602-4625 if you have any questions. Sincere '&/ I \.AS T I WAYNE Assistant Planning Director GEW:PG:cs Michael J. Holzmiller Chris DeCerbo Jeremy Riddle Mike Smith Bill Plummer File Copy Data Entry