Loading...
HomeMy WebLinkAboutRP 01-08; Laguna Point; Redevelopment Permits (RP)April 1,2004 TO: BUILDING DEPARTMENT FROM: Management Analyst, Housing & Redevelopment Department Approval of Plan Check PC030045 I have approved the above referenced plan check for the Laguna Pont Condominium project. I have noted the approval in the Permits system. If you have any questions, please contact me at x2817. Thank you for your assistance on this matter. (jyCEAKToTRUIZ /Management Analyst March 3, 2004 TO: SENIOR MANAGEMENT ANALYST, PLANNING DEPARTMENT FROM: Management Analyst, Redevelopment Department Final Mylar for Laguna Point (RP 01-08/CT01-13) The conditions of approval for Major Redevelopment Permit No. RP01-08 and Tentative Map No. CT01-13 requires the submittal of a final mylar of the site plan. Staff has reviewed the attached mylar and finds it consistent with the site plan approved by the Housing and Redevelopment Commission on April 9, 2002. Since the Housing and Redevelopment Department does not maintain storage of mylar plans, we request the Planning Department maintain this record in the same manner as all other discretionary land use permits. If you have any questions, please contact me at x2813. Thank you for your assistsmce-ocithis matter. LORI H. ROSENSTEIN Management Analyst January 26, 2004 TO: CITY CLERK FROM: Management Analyst, Redevelopment Department Notice of Restriction on Real Property (Laguna Point RP01-08/CT01-13) Recordation of the attached Notice of Restriction on Real Property was a Housing and Redevelopment Commission condition of approval for the Laguna Point project. The document requires the approval of the City Attorney. Please complete the routing of the document and submit to the County Recorder for recordation. If you have any questions, please contact me at x2813. Thank you for your assistance on this matter. LORI H. ROSENSTEIN Management Analyst January 16, 2004 TO: BUILDING DEPARTMENT FROM: Management Analyst, Redevelopment Department LAGUNA POINT (RP 01-08/CT 01-13) APN: 203-101-30,32,33 PLAN CHECK NO. PC030045 1 have completed the second plan check for the above referenced project. The Housing and Redevelopment Commission approved this project on April 9, 2002. The following conditions of approval must be satisfied prior to the issuance of the building permit: \/ 1. Developer must obtain final approval of a Final Landscape and Irrigation Plan , showing conformance with the approved Preliminary Landscape Plan and the City's A' Landscape Manual. The final landscape plan shall specify an average minimum 15- trunk height for the palm trees which shall be of varying heights. Landscape and ^, - ^ irrigation plans have been submitted throuah the landscape plancheck process and ^ final approval is expected in the near future. 2. Prior to issuance of the building permit, Developer shall submit to the City a Notice of Restriction to be filed in the Office of the County Recorder. The required Notice of Restriction has been sent to the developer for his signature. Final processina of the Notice is expected in the next week. 3. Prior to certificate of occupancv. the Developer shall provide the Housing and Redevelopment Department with a recorded copy of the official CC&Rs that have been approved by the Department of Real Estate. / 4. Prior to the issuance of the building permit, the Developer shall submit to the Housing and Redevelopment Department a reproducible 24" x 36" mylar copy of the final site plan for the project. This information has been entered into Permits Plus. If you have any questions, please contact me..Bt x2813. LORI H. ROSENSTEIN C: Bill Behun, Architect Bill Canepa, Owner Citv of Carlsbad Housing & Redevelopment Department January 16, 2004 BILL CANEPA WAVECREST RESORTS 829 SECOND STREET, #A ENCINITAS CA 92024 SUBJECT: Laguna Point (RP 01 -08/CT 01 -13) APN: 203-101-30,32,33 In accordance with the conditions of approval for the above referenced project, prior to the issuance of the building permit, the developer must submit a Notice of Restriction to be filed in the office of the County Recorder notifying all interested parties and successors in interest that the City of Carisbad has issued a Major Redevelopment Permit and Tentative Tract Map on the real property. I have enclosed said notice which must be signed and notarized according to the directions contained on the signature page. Please sign the enclosed document and return to me for processing and recordation. Please contact my office at (760) 434-2813, if you have any questions regarding the information contained in this letter. Sine LORI H. ROSENSTEIN Management Analyst 2965 Roosevelt St., Ste. B • Carisbad, CA 92008-2389 • (760) 434-2810/2811 • FAX (760) 720-2037 ^ fi itv of Carlsbad Housing & Redevelopment Department December 16, 2003 BILL CANEPA WAVECREST RESORTS II, LLC 829 SECOND STREET, #A ENCINITAS CA 92024 SUBJECT: Laguna Point (RP 01 -08/CT 01 -13) APN: 203-101-30,32,33 There was an error in my last correspondence to you, dated December 10, 2003. I erroneously stated the tentative map for the Laguna Point project is due to expire on February 25, 2004. The correct date is April 9. 2004. The reason for this is the February date referred to the date the Design Review Board took action on the project. However, the project, including the tentative map, did not receive final approval until the Housing & Redevelopment Commission granted it on April 9 th If you do not believe you can final the tentative map before April 9, 2004, it is advisable that you file for a time extension through the Carisbad Engineering Department. To do this an application must be filed not less than 20 days and no more than 90 days prior to the expiration of the tentative map. The filing fee is currently $1,900. Building permits should also be issued prior to the April 9, 2004 deadline. However, as long as you are showing a good faith effort that you are moving fon^/ard with the project there is some level of flexibility associated with the deadline for issuance of the building permits that does not apply to the tentative map. I apologize for any misunderstanding my previous correspondence caused. If you have any questions regarding the information contained in this letter, please contact my office at (760) 434-2813. Wishing you a most joyous holiday season. SincerStyr-^ LORI H. ROSENSTEIN Management Analyst 2965 Roosevelt St., Ste. B • Carisbad, CA 92008-2389 • (760) 434-2810/2811 • FAX (760) 720-2037 @ Citv of Carlsbad Housing & Redevelopment Department December 10, 2003 BILL CANEPA WAVECREST RESORTS II, LLC 829 SECOND STREET, #A ENCINITAS CA 92024 SUBJECT: Laguna Point (RP 01-08/CT 01-13) APN: 203-101-30,32,33 I have received your fax, dated December 8, 2003, including a copy of the preliminary letter from DRE and your request to waive the project condition requiring the project CC&R's be approved by the DRE prior to the issuance of building permits. We understand the DRE process can be very time consuming and it is not our intention to hold up the construction of the project in any way. Since we received proof that the DRE process has been initiated, we will consider the condition satisfied for now with the understanding that prior to the issuance of the Certificate of Occupancy a recorded copy of the official CC&Rs that have been approved by the Department of Real Estate will be submitted to the Housing and Redevelopment Department. In addition, I want to remind you that the tentative map for your project is due to expire on February 25, 2004. Prior to this date the final map must be recorded, building permits issued, and construction much be initiated. Othen/vise, you must apply for a time extension to your tentative map. If you have any questions regarding the information contained in this letter, please contact my office at (760) 434-2813. Wishing you and your family a happy and healthy holiday season. LORI H. ROSENSTEIN Management Analyst 2965 Roosevelt St., Ste. B • Carlsbad, CA 92008-2389 • (760) 434-2810/2811 • FAX (760) 720-2037 ^ 12/08/03 13:03 WRUE PROPERTIES INC. 619 7532423 ^ 760 720 2037 NO.152 POI 829 Second Street #A Encinitas, Ca 92024 Phone.760-753-2440 Fax 760-753-2423 Memo To: tori Rosenstein Fax: 760-720-2037 Fram: Bill Canepa Date: 12/8/03 Wave Crest Resorts II LLC Following is a oopy off our plnli report from the DRE. We are concemed that they wont complete the review of our CC&iVS prfor to our beginning constniction (hopefully in January). We are requesting that the condition pertaining to appraved CC&R'S be modified to allow us to proceed. We do not intend to ofier units for sale until some time in 2005 as the prqect nears completion. Thank you. Citv of Carlsbad Housing & Redevelopment Department May 20, 2003 BILL CANEPA WAVECREST RESORTS II, LLC 829 SECOND STREET, #A ENCINITAS CA 92024 SUBJECT: Laguna Point (RP 01-08/CT 01-13) APN: 203-101-30,32,33 I have reviewed the revised roof pitch elevations with Housing and Redevelopment Director Debbie Fountain. It is our understanding that in order to stay under the 35-foot height limit approved for the project your architect has come up with two options: 1. Reduce the roof pitch from 5:12 to 4.75:12; or 2. Flatten out the pitch with a built up roof or metal cap. Staff has approved Option #1 as the preferred design to meet the height limit. This option has been found to be in substantial conformance with the approved land use permit. Revised building plans showing the approved revision must be submitted to the Carisbad Building Department for final plan check review. A copy of the modified building plans will be automatically routed through the Housing and Redevelopment Department for final approval. If you have any questions regarding the information contained in this letter, please contact my office at (760) 434-2813. Sine LORI H. ROSENSTEIN Management Analyst 2965 Roosevelt St., Ste. B • Carlsbad, CA 92008-2389 • (760) 434-2810/2811 • FAX (760) 720-2037 ^ NOVEMBER 19, 2002 TO: HOUSING POLICY TEAM FROM: Management Analyst, Redevelopment Department FINANCIAL ASSISTANCE REQUEST FOR LAGUNA POINT Background The process and methodology for evaluating cases where economic assistance has been requested for a project in the Village Redevelopment Area is set forth in Housing and Redevelopment Commission Policy No. 5 (see attached). As stated in Policy No. 5, it is the intent of the Housing and Redevelopment Commission that applicants have an early opportunity for a review of their proposal for compliance with the policy. In that regard, it is the role of the Housing Policy Team, acting as the Redevelopment Assistance Review Committee, to review requests for economic assistance within the Redevelopment Area and prepare a recommendation to the Housing and Redevelopment Commission. On April 9, 2002 the Housing and Redevelopment Commission conditionally approved a major redevelopment permit and tentative tract map for a 21-unit condominium project known as Laguna Point. At the time the project was presented to the Housing and Redevelopment Commission, the Commission was informed the applicant would be returning with a request for financial assistance to help offset the cost of providing three (3) for-sale low-income housing units within the project. The applicant has prepared a Proforma for the project, which is being forwarded to the Housing Policy Team for review and recommendation to the Housing and Redevelopment Commission. Proiect Description The 1.15 acre site is located on the south side of Laguna Drive between Roosevelt Street and State Street. The project consists of two levels of residential units over a fully enclosed parking garage. The building was designed as two separate components in order to reduce the mass of the structure along Laguna Drive. Building A is located on the west side of the property, at the corner of State Street and Laguna Drive and consists of 10 stacked flats. Building B is located on the east side of the property at the corner of Roosevelt Street and Laguna Drive and consists of 9 two-story units. The two buildings are joined by a centralized entryway, enclosed lobby, office, and elevator at the ground floor. Above the lobby are 2 two- story units. The project contains a wide range of units. There are 4 one-bedroom units ranging in size from 829 to 1,022 square feet, 8 two-bedroom units ranging from 1,442 to 1,657 square feet, and 9 three-bedroom units from 1,527 to 2,106 square feet. The three affordable units have one-bedroom and measure 829 square feet. Inclusionary Housing Requirements Per Redevelopment Law, 15% of the private housing units constructed within the boundaries of the Village Redevelopment Area must be affordable to low and moderate income persons, of which not less than 40% (or 6% of the total units) must be affordable to very low-income households. Per City Ordinance, 15% of the total housing units must be affordable to low income households. Developers of housing within the Redevelopment Area must comply with Housing Policy Team November 19, 2002 Page No. 2 both the Redevelopment Law and the City Ordinance in terms of the Inclusionary Housing Requirements. The three affordable units will satisfy the inclusionary housing requirement for the project. The applicant is requesting a grant in the amount of $70,000 per unit ($210,000 total) from the City to assist in providing these units. Method for Determining Financial Assistance Housing and Redevelopment Commission Policy No. 5 states that all financial assistance requests/proposals for private development projects will be considered by the Agency/Commission according to the following criteria: A. Economic need for financial assistance demonstrated by the development Proforma and operating statements for the project. B. The measure of direct economic public benefits generated by the project. These include: • The number of jobs created by the project and the benefit of such jobs to the Area and the City. • The amount of increased sales, property or transient occupancy tax to be received by the Area and/or City as a result of the project. C. Redevelopment benefits which include ways by which the project serves redevelopment objectives through: • A specific instance of blight elimination or removal of a blighting influence demonstrated by the project and the projected effects (aesthetic and fiscal) of removing such conditions. • Creation of a use or uses which serve residents as well as visitors to the Area. • The provision of other benefits to the Area which advance other specific objectives outlined within the Village Design Manual and Master Plan Implementation Program for the Redevelopment Area such as creating uses that are complimentary to others in the Area and serve as catalysts with respect to other desired development activity. Discussion of Criteria Criteria A: The economic need for financial assistance is demonstrated by the Proforma provided by the applicant. Staff has reviewed the Proforma and finds the figures accurately depict the development costs for a project of this size. The costs for site work, landscaping, street improvements, and government agency fees have all been derived by the applicant after consulting with the appropriate City Departments. However, there is a high level of uncertainty associated with the estimated sales prices projected by the applicant. The reason for this is that there have been no comparable projects built or sold in the area to support the estimated prices. The applicant found one comparable project, the Ocean Pointe condominium project in South Carisbad, and used the sales figures from that project to derive the estimated sales figures for this project. Criteria B: The measure of direct economic public benefits generated by the project is determined by the amount of property tax to be received by the City as a result of this project. The proposed project will have a positive impact in terms of increased property tax. The current assessed value of the project site is around $1.4 million. With the new construction, it is estimated that the assessed value will increase to approximately $8.5 million. The increase Housing Policy Team November 19, 2002 Page No. 3 in value would result in additional tax increment revenue for the Carisbad Redevelopment Agency of approximately $71,000 per year. Criteria C: The redevelopment benefits of the project include the elimination of blight and the creation of a use that is complimentary to other uses in the Redevelopment Area. The subject property is situated along a highly visible corner at the northern-most entrance to the Village. Currently, the site contains an existing 6-foot high block wall on the corner of State Street and Laguna Drive and a chain link fence surrounding the western-most portion of the property. The eastern-most portion of the property has been plagued by the illegal dumping of large household appliances and furniture. Development of the proposed project would provide a highly desirable gateway to the redevelopment area, additional street improvements along Laguna Drive and Roosevelt Street, and the elimination of a blighting influence on the surrounding area. The proposed project constitutes one of the first multi-family for-sale projects in the Redevelopment Area since it's establishment in 1981. Additionally, it is one of only two newly constructed residential projects that include affordable housing. The project creates much needed market rate and affordable housing in the Residential Support Area (District 4), where the objective is to provide a rich mix of housing types located in close proximity to shops, restaurants, and the commuter rail station. It is the opinion of the Housing and Redevelopment Department that the proposed project will serve as a catalyst for other residential projects in the Area and provide a more diverse demographic base to utilize neighborhood services, shops, restaurants and public transportation. Conclusion Based on the analysis of the above criteria, it appears the proposed project warrants some level of economic assistance. The Housing Policy Team is being asked to provide a recommendation to the Housing and Redevelopment Commission on the amount of financial assistance. LORI H. ROSENSTEIN Attachments: Housing and Redevelopment Commission Policy No. 5 Applicant's Proforma 829 Second Street, Suite A Encinitas, CA 92024 (760) 753»2440 RESORTSIILLC FAX (760) 753.2423 email: wcresort@pacbell.net WA^CREST 11/4/02 Mr. Craig Ruiz Housing & Redevelopment City of Carlsbad 2965 Roosevelt Carlsbad, Ca 92008 Subject: Laguna Point Financial Assistance Dear Mr. Ruiz: We are writing in response to your letter to Christopher Earl dated October d***, 2002 pertaining to the above referenced project's financial assistance request. Mr. EarPs partnership has withdrawn from the purchase. However, we wish to pursue the request on our own behalf. Mr. Earl has given us his proforma, and we have modified his costs by reducing the land acquisition cost by $400,000 to $1,725,000. This cost reflects our cost to date. It does not reflect any lender interest or any return on our capital since we acquired the two pieces of property, 4 years ago and 1 Vi years ago, respectively. We modified Mr. EarPs pricing to reflect a 1JQL% proljtabove cost. This pricing was achieved by estimating a sales price of($282.47 per square ft. and giving view premiums of $800,000 for the eleven units facihg-ftorih toward the lagoon. To this figure, we added the estimated $360,000 collective sales revenue for the 3 affordable units and the proposed City subsidy of $210,000. This pricing may be somewhat optimistic as the best comparable sales we could fmd were in the Ocean Pointe condominium project in South Carlsbad. A 1450 square ft. unit with no view in the final sales phase was priced at $379,000 or $261.50 per square ft. With respect to an affordable housing contribution, we are contributing our land at cost. An additional contribution to affordable housing is that the cost of the affordable units is considerably greater than their mandated sales price plus the proposed subsidy. That difference, we will have to absorb. The aflbrdable units comprise 7.71% of the project's living area and 14.26% of its parking requirements. We believe a weighted cost of 9% of the entire project is reasonable, which amounts to a collective cost of approximately $815,334. With a collective allowable sales price of approximately $360,000 and a $210,000 City subsidy, there is stili an additionai $245,334 cost contribution from the developer required. Regarding your request for an appraisal, enclosed please find a copy of an appraisal prepared for United California Bank dated 6/25/02. The land value determined by that appraisal was $2,710,000. Please contact me if we can provide any additional information. Bill Canepa President 11/04/2002 Laguna Point Proforma Sales Revenue 18 units-base price View premiums 3 affordable units Proposed City subsidy Total Sales Revenue 8,595,000.00 800,000.00 360,000.00 210,000.00 OJL- 979<«^O0LOO- Costs Total acquisition Total off-site costs Total on-site costs Total financing costs Total Project Costs Total Project Profit 1,725,000.00 662,372.00 6,242,456.00 429,436.00 9,059,264.00 Citv of Carlsbad Housing & Redevelopment Department October 8, 2002 Christopher Eari Compass Builders South Pacific Street, Suite A Oceanside, CA 92054 Subject: Laguna Pointe Financial Assistance Dear Mr. Eari: Recently, members of the Housing and Redevelopment Department reviewed your request for financial assistance for the Laguna Point project. The three proformas that you submitted were reviewed to determine the level of financial assistance appropriate for the proposed project, and to determine if the request should be taken forward to the Housing Policy Team for further consideration. Previously, the Housing Policy Team reviewed a request for a similar project at this same location. At that time, the Housing Policy Team was willing to support financial assistance in the amount of $70,000 per affordable unit. The Housing and Redevelopment Department staff is willing to support this same assistance level, once the following requested information is reviewed and approved by staff. With each previous affordable housing project developed in the City of Carisbad, the developer of the project has also contributed financially to the project. In each instance, the developer has contributed the land for the affordable units, plus a direct subsidy (cash). The three proformas reviewed by staff did not include any type of assistance from the developer. Before the Housing and Redevelopment Department staff will support City financial assistance, the proposal will need to be revised to reflect financial participation by the developer. If no developer financial assistance is to be proposed, a written justification for City financial assistance shall be provided. In the proforma, the purchase price of the land is stated as $2,125,000. Recent sales information reviewed by staff for property in the redevelopment area is somewhat lower than the purchase price stated in the proforma. When responding to staffs requests for additional information contained in this letter, please also provide a copy of a recent appraisal conducted by a qualified appraiser that supports the purchase price stated in the proforma. 2965 Roosevelt St., Ste. B • Carlsbad, CA 92008-2389 • (760) 434-2810/2811 • FAX (760) 720-2037 @ Carlsbad 21 Loguna Point CA21.0B2I02C ENTRA HOMES. LLC Emrt a L* ( 2 3 4 s 20 t J( 7. > 9 13 »0. If. 12 14 15 It 17 tl It PRODUCT PLAN PIAN PL*N PUUI PtAN PON PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN A B C D E E-1 F F-1 G H H-1 J J-1 J-2 J-3 K L M Mix 1 1 1 1 1 1 1 1 2 1 1 3 1 1 1 1 1 1 Square Footage (Unit) 829 848 853 1022 1852 1799 1808 1770 1442 2106 1956 1643 1657 1633 1646 2046 1641 1527 Mix Percentage 3% 3% 3% 3% e% 5% 6% 5% 9% 6% 6% 15% 5% 5% 5% 6% 5% 5% Deck Square Feet 97 97 130 109 185 155 138 153 120 236 234 183 188 181 182 238 137 165 Total Square Feet (Less Deck) 829 848 853 1022 1852 1799 1808 1770 2884 2106 1956 4929 1657 1633 1646 2046 1641 1527 Landscaoe & IHardscape Sales Price S 120.000 $ 120.000 $ 120.000 S 399.000 $ 570.000 S 599.000 $ 565.000 i 599.000 S 515.000 S 595.000 S 565.000 S 555.000 $ 485.000 $ 485.000 $ 485.000 $ 525,000 S 470.000 $ 475.000 Dollars Per Square Foot S 144.75 i 141.51 $ 140.68 $ 39041 $ 307.78 S 33296 $ 312.50 $ 338.42 S 357.14 $ 282.53 $ 288.85 s 337.80 $ 292.70 $ 297.00 $ 294.65 $ 256.60 $ 28641 $ 311.07 Premiums / (Subsidy) $ % $ J $ $ S $ $ $ $ $ $ $ $ $ X $ Revenue $ 120.000 $ 120.000 $ 120.000 i 399.000 S 570.000 t 599,000 $ 565.000 S 599.000 $1,030,000 s 595.000 S 565.000 $1,665,000 $ 485.000 $ 485.000 $ 485.000 $ 575.000 $ 470.000 $ 475.000 ACQUISITION a OFF SITE COSTS ' I2»»01 Acquisition s 101.190 $ 101.190 $ 101.190 s 101.190 $ 101.190 s 101.190 S 101.190 S 101.190 s 202.381 s 101.190 $ 101.190 $ 303.571 $ 101.190 $ 101.190 $ 101.190 $ 101.190 s 101.190 $ 101.190 Closinq Costs s 253 i 253 253 s 253 s 253 s 253 $ 253 s 253 $ 506 $ 253 $ 253 $ 759 $ 253 $ 253 $ 253 $ 253 $ 253 $ 253 Soils / Geoloqy $ 1.200 i 1.200 $ 1.200 s 1.200 $ 1.200 s 1.200 s 1.200 % 1.200 s 2.400 s 1.200 $ 1.200 $ 3.600 $ 1.200 $ 1.200 $ 1.200 $ 1.200 $ 1.200 $ 1.200 Civil Enqinaerinq (Desian & Survevino) $ 4.350 $ 4.350 $ 4.350 $ 4.350 $ 4.350 s 4.350 $ 4.350 i 4.350 % 8.700 $ 4.350 $ 4.350 } 13.050 $ 4.350 $ 4.350 $ 4.350 $ 4.350 $ 4.350 S 4.350 Bonds S Faes $ 1.721 i 1,721 S 1.721 s 1.721 s 1.721 $ 1.721 $ 1.721 s 1.721 i 3.442 s 1.721 $ 1.721 i 5.163 $ 1.721 $ 1.721 $ 1.721 $ 1.721 $ 1.721 $ 1.721 Rouqti Gradinq $ 3.626 S 3.626 s 3.628 s 3.626 s 3.626 s 3.626 s 3.626 $ 3.626 $ 7.252 $ 3.626 $ 3.626 % 10.878 $ 3.626 $ 3.626 $ 3.626 $ 3.626 $ 3.626 $ 3.626 Street Improvements $ 2,992 i 2.992 s 2.992 s 2.992 s 2.992 $ 2.992 s 2.992 $ 2.992 s 5.984 $ 2.992 s 2.992 $ 8.976 S 2.992 $ 2.992 $ 2.992 $ 2,992 $ 2.992 $ 2.992 Public Underqround Utilities $ 2.706 % 2.706 $ 2.706 $ 2.706 $ 2.706 s 2.706 $ 2.706 s 2,706 $ 5.412 s 2.706 s 2.706 $ 8.118 $ 2.706 $ 2.706 $ 2.706 $ 2.706 $ 2.706 $ 2.706 Landscape & Hardscape $ 11,028 $ 11.028 s 11.028 $ 11.028 s 11.028 s 11.028 $ 11.028 s 11.028 i 22.056 $ 11.028 $ 11.028 $ 33.084 $ 11.028 S 11.028 S 11.028 $ 11.028 $ 11.028 $ 11.028 Utilities to Structure $ 850 $ 850 $ 850 s 850 $ 850 $ 850 $ 850 $ 850 s 1.700 $ 850 $ 850 $ 2.550 $ 850 $ 850 $ 850 $ 850 $ 850 $ 850 Prooertv Taxes s 1,326 s 1.326 s 1.326 s 1.326 s 1.328 s 1.326 s 1.326 s 1.326 $ 2,651 s 1.326 s 1.326 $ 3.977 $ 1.326 $ 1.326 $ 1.326 $ 1.326 $ 1.326 $ 1.326 Continaencv s 1,490 $ 1.490 s 1.490 s 1.490 s 1.490 $ 1.490 s 1.490 $ 1.490 $ 2,980 s 1.490 s 1.490 $ 4.470 $ 1.490 $ 1.490 $ 1.490 $ 1.490 $ 1.490 $ 1.490 Estimated Total A & Off Site Costs $ 132,732 s 132.732 $ 132.732 $ 132.732 $ 132.732 $ 132.732 s 132.732 $ 132.732 s 265,464 $ 132.732 $ 132.732 $ 398.196 $ 132.732 $ 132.732 s 132.732 $ 132.732 $ 132.732 S 132.732 ON SITE COSTS 1M2 ' 31.542 * 31542 * 31.542 ' 31542 315.2 • 3,542 «30B ' 31542 ' 31542 • ««25 ' 31542 31,542 « 3.542 1 31.542 I 3.542 S 31.542 Parking Structure $ 31,120 $ 31.120 t 31.120 s 31.120 s 31.120 s 31.120 $ 31.120 $ 31.120 s 62,240 $ 31.120 $ 31.120 $ 93.360 $ 31.120 $ 31.120 s 31.120 $ 31.120 $ 31.120 $ 31.120 Residential Structure $ 70.548 $ 72.165 $ 72.590 s 86.972 s 157.605 s 153.095 s 153.861 $ 150.627 $ 245.428 $ 179.221 s 166.456 $ 419.458 $ 141.011 $ 138.968 $ 140.075 $ 174.115 $ 139.649 $ 129.948 Decks $ 2,328 $ 2.328 s 3.120 s 2.816 $ 4.440 X 3.720 $ 3.312 i 3,672 s 5.760 $ 5.664 $ 5.616 $ 13.176 $ 4.512 $ 4.344 $ 4.368 $ 5.712 $ 3.288 $ 3.960 Architecture S 12.750 i 12.750 s 12.750 $ 12.750 $ 12.750 $ 12.750 I 12.750 $ 12.750 $ 25.500 s 12.750 s 12.750 $ 38.250 $ 12.750 $ 12.750 $ 12.750 $ 12.750 $ 12.750 $ 12.750 Landscape Architecture $ 1.190 1.190 $ 1.190 i 1.190 i 1.190 $ 1.190 i 1.190 s 1.190 $ 2.380 s 1.190 s 1,190 $ 3.570 $ 1.190 $ 1.190 s 1.190 $ 1,190 $ 1.190 $ 1.190 Legal & Accounting $ 1,000 s 1.000 s 1.000 s 1.000 s 1.000 s 1.000 s 1.000 s 1.000 s 2.000 s 1.000 $ 1,000 $ 3.000 $ 1.000 $ 1.000 $ 1.000 $ 1.000 $ 1.000 $ 1.000 Structural Engineering S 1.400 % 1,400 $ 1.400 $ 1.400 s 1.400 s 1.400 s 1.400 $ 1.400 s 2. BOO s 1.400 $ 1,400 $ 4,200 $ 1.400 $ 1.400 $ 1.400 $ 1.400 $ 1.400 $ 1.400 Mechanical Engineering $ 478 $ 478 s 476 $ 476 s 476 s 476 s 478 s 476 $ 952 s 476 $ 476 $ 1.429 $ 476 $ 476 $ 476 $ 476 $ 476 $ 476 Electrical Engineering $ 476 $ 476 s 476 s 476 s 476 $ 476 s 476 $ 476 s 952 $ 476 $ 476 $ 1.429 $ 476 $ 476 $ 476 $ 476 $ 476 $ 476 Prints , S 290 s 290 $ 290 s 290 s 290 s 290 s 290 $ 290 $ 580 s 290 s 290 $ 870 s 290 $ 290 s 290 $ 290 $ 290 $ 290 Insurance itF % 15.500 s 15.500 s 15.500 s 15.500 $ 15.500 s 15.500 $ 15.500 s 15.500 s 31.000 $ 15.500 $ 15.500 $ 46,500 $ 15.500 $ 15.500 $ 15.500 s 15.500 $ 15.500 $ 15.500 Permits a Impact Fees S 12.518 s 12.805 s 12.880 s 15.432 $ 27.965 % 27.165 s 27.301 s 26.727 $ 43,548 i 31,801 $ 29,536 $ 74,428 $ 25.021 $ 24.858 $ 24.855 $ 30.895 $ 24.779 $ 23.058 School Fees $ 1.774 $ 1.815 $ 1.825 s 2.187 $ 3.963 s 3,850 $ 3.860 $ 3.788 s 6.172 $ 4.507 s 4.186 $ 10.548 $ 3.546 s 3.495 $ 3.522 $ 4.378 $ 3.512 $ 3.268 HOA Reserve $ 2,640 s 2.640 $ 2.640 $ 2.640 $ 2.640 $ 2.640 $ 2.640 s 2.640 $ 5.280 s 2.640 s 2.840 7.920 $ 2.640 $ 2.640 $ 2.640 $ 2.640 $ 2.640 $ 2.640 Warranty Accrual S 900 $ 900 $ 900 s 2.993 $ 4,275 $ 4,493 s 4.238 s 4.493 s 7.725 s 4.463 $ 4.238 $ 12.488 $ 3.038 $ 3.638 s 3.638 $ 3.938 $ 3.525 $ 3.563 Indirect Construction S 1,989 $ 1.989 S 1.989 $ 1.989 $ 1.989 $ 1,989 $ 1.989 s 1.989 s 3.978 s 1.989 s 1.989 $ 5.967 $ 1.989 $ 1.989 $ 1.989 $ 1.989 $ 1.989 $ 1.989 Model Costs S 5,951 $ 5.951 s 5.951 s 5.951 s 5.951 $ 5.951 s 5.951 $ 5.9S1 s 11.902 $ 5.951 $ 5.951 $ 17.853 $ 5.9511 $ 5.951 t 5.951 $ 5.951 $ 5.951 $ 5.951 Model Maintenance S 300 $ 300 s 300 $ 300 s 300 s 300 $ 300 $ 300 $ 600 s 300 $ 300 $ 900 $ 300 $ 300 s 300 $ 300 $ 300 $ 300 Marketinq $ 900 S 900 s 900 s 2,993 s 4.275 s 4.493 s 4.238 s 4.493 s 7.725 s 4.463 $ 4.238 12.488 $ 3.638 $ 3.638 $ 3.638 $ 3.938 $ 3.525 3.563 Sales Commissions $ 5,400 S 5.400 s 5.400 i 17.955 s 25.650 s 26.955 s 25.425 s 26.955 s 46.350 $ 26.775 $ 25.425 $ 74.925 $ 21,825 $ 21.825 s 21.825 s 23.625 $ 21,150 $ 21.375 Closing Costs i 1.320 s 1.320 s 1.320 % 4.388 $ 8.270 s S.S89 s 8.215 i S.S89 $ 11.330 $ 6.545 s 6.215 S 18.315 $ 5.335 $ 5.335 s 5.335 s 5,775 $ 5.170 $ 5.225 General S Administrative $ 10.864 $ 11.006 s 11.112 $ 12.510 $ 18.962 $ 18.523 $ 18.532 s 18.303 $ 31.473 s 20.977 $ 19.836 $ 52.175 $ 17.460 $ 17.267 s 17.366 $ 20.488 $ 17.224 $ 16.438 Contractor Costs S 3.973 s 4.025 s 4.064 s 4.575 s 6.935 s 6.774 s 6.778 s 6.694 s 11.510 s 7.672 $ 7.254 $ 19.081 $ 6.386 $ 6.315 s 6.351 $ 7.493 $ 6.299 $ 6.011 s I24.IM mrai t ia.aw t t41.96B I 21t.T<» 1 2n.»5 1 2ii.ne s 208.110 s 3M.ua 23a.739 , 22C.M7 , SM 7.5 , 1M.545 s 1B7.33t , in.4u s 234.152 1 196.860 s t67J66 Esfimated Tofal On Sife Costs $ 185,608 s 187.746 $ 189.195 $ 227.704 s 335.423 s 330.739 s 328.850 s 327.422 $ 567.186 $ 367.168 $ 348.081 $ 932.328 $ 307.453 $ 304.564 $ 306.054 $ 356.438 $ 303.204 $ 291.490 Estimated Total Off Site Costs S 132,732 $ 132.732 $ 132.732 $ 132.732 $ 132.732 $ 132.732 s 132.732 $ 132.732 $ 265.464 s 132.732 s 132.732 $ 398.196 $ 132.732 $ 132.732 $ 132.732 $ 132.732 s 132.732 $ 132.732 Est. Total On 8 Off Sife Costs Estimated Profit B4 Financing Costs Less Sales Costs $ 311.620 S 313,757 $ 315.207 $ 338.092 $ 436.235 $ 429,927 $ 429.942 $ 426.610 $ 774.970 S 466.580 $ 449,173 $1,237,284 $ 413,025 $ 410.136 $ 411.626 $ 458.770 $ 409.616 $ 397.622 Construction Loan Amount $ 264.877 $ 266,694 $ 267.926 $ 287.378 $ 370.799 $ 365.438 $ 365.451 $ 362.619 $ 658.725 $ 396.593 $ 381.797 $1,051,691 $ 351.071 $ 348.616 $ 349.882 $ 389,955 $ 348.174 $ 337.978 Cash Required I $ 46.743 I $ 47.064 | $ 47.261 I $ 50.714 | $ 65.435 | $ 64.469 | $ 64.491 | $ 63.992 I $ 116.246 | $ 69.967 | S 67.376 | $ 1B5.593 I S 61.954 | $ 61.520 I $ 61.744 I $ 68.816 I $ 61.442 | $ 59.6431 | $ 1.264.S291 | $ 60.216 I I $ 38.55 I 13.42%| Origination Fee $ 3.311 $ 3.334 $ 3.349 $ 3.592 $ 4.635 $ 4.568 $ 4.568 $ 4.533 $ 8.234 $ 4.9S7 $ 4.772 $ 13.146 $ 4.388 $ 4.358 $ 4.374 $ 4.874 $ 4.352 $ 4.225 Interest Costs $ 12.913 $ 13.001 $ 13.061 $ 14.010 $ 18.076 $ 17.815 $ 17.816 $ 17.678 $ 32.113 $ 19.334 $ 18.613 $ 51.270 $ 17.115 $ 16.995 $ 17.057 $ 19.010 $ 16.973 $ 16.476 Total Financinq Costs $ 16.224 $ 16.335 $ 16.410 $ 17.602 $ 22,711 $ 22,383 $ 22.384 $ 22,210 $ 40.347 $ 24.291 S 23.385 t 64.416 $ 21.503 $ 21.353 $ 21.430 $ 23.885 $ 21.326 $ 20.701 Tofal Estimafed Costs PROFIT / (LOSS) I $ 334.564 I $ 336.812 I $ 338.337 I $ 378.037 I S 490.866 I $ 485,854 I $ 483.966 I $ 482.364 1 $ 872.997 I $ 524.191 I $ 504.198 I $1.394.940 I S 481.688 I $ 458,649 | $ 460.216 I $ 512.055 I $ 457.262 I $ 444.9231 I $ 9.421.9191 I $ 448.663 I I $ 287.20 I 100.00%! Estimated Pretax Profit $ (214.564) $ (216.812) $ (218,337) $ 20.963 $ 79.134 $ 113.146 $ 81.034 S 116.636 $ 157,003 $ 70,809 $ 60,802 S 270,060 $ 23,312 $ 26.351 $ 24.784 $ 12.945 $ 12.738 $ 30.077 Estimated Pretax Profit Percentaqe -178.80% -180.68% -181 95% 5.25% 13.88% 18.89% 14.34% 1947% 1524% 11.90% 10.76% 16 22% 4 81% 5.43% 5 11% 247% 2.71% 6.33% 21 1562 100% 2928 32806 $ 470.095 $ 300 92 $ $ 9.872.000 / $ 2.125.000 $ 5.313 $ 25.200 $ 91.350 $ 36.141 $ 76,146 $ 62.832 $ 56.826 $ 231.588 $ 17.850 $ 27.838 $ 31.289 $ 2.787.372 S «ej.372 $ 653.520 $ 2.791.791 $ 81.936 $ 267.750 $ 24,990 $ 21,000 $ 29.400 $ 10.000 $ 10.000 $ 6.090 $ 32S.S00 $ 495.371 $ 70.205 $ 55.440 $ 74.040 $ 41.769 $ 124.971 $ 6.300 $ 74.040 $ 444.240 $ 108,592 $ 350.518 $ 128.189 $ 6.195.851 $ 2.787.372 $ 8.983.022 $ 888.978 $ 8.430.190 $ 7.165.662 $ 1.264.529 $ 89.571 $ 349.326 $ 438.897 s 9.421.919 $ 450,081 4.56% 64.77 22.55% P€RCENT OF TOTAL COSTS $ 84.97 I $ 427.763 I I $ 42.332 I I $ 27.10 I 2.84% 0.27% 1.33% 007% 3.72% 1.36% I $ 273.82 I 95.34%! I S 21.432 I I $ 13.72 I 4.78%| 9/23/2002 9:50 AM Carlsbad 21 Laguna Point CA2i-as22a2e ENTRA HOMES. LLC Earl t Lm Conatnietfon Com. PRODUCT Mix 1 2 3 4 s 20 1 2t 7. « • 13 fO. 11.12 14 IS 16 17 i< 19 PRODUCT Mix PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PRODUCT Mix A 8 C D E E-1 F F - 1 G H H-1 J J-1 J-2 J-3 K L M PRODUCT Mix 1 1 1 1 1 1 1 1 2 1 1 3 1 1 1 1 1 1 Squara Footage (Unit) 829 848 853 1022 1852 1-799 1808 1770 1442 2106 1956 1643 1657 1633 1646 2046 1641 1527 Mix Percentaqe 3% 3% 3% 3% 6% 5% 6% 5% 9% 6% 6% 15% 5% 5% 5% 6% 5% 5% Deck Squara Feet 97 97 130 109 185 155 138 153 120 236 234 183 188 181 182 238 137 165 Total Sauare Feel (Less Deck) 829 848 853 1022 1852 1799 1808 1770 2884 2106 1956 4029 1657 1633 1646 2046 1641 1527 Landscape & Hardscape Sales Price $ 120.000 $ 120.000 S 120.000 $ 399.000 $ 570.000 $ 599.000 $ 565.000 $ 599.000 $ 515.000 $ 595.000 $ 565.000 $ 555.000 $ 485.000 $ 485.000 $ 485,000 $ 525.000 $ 470.000 $ 475.000 Dollars Per Square Foot $ 144.75 $ 141.51 $ 140.68 $ 390.41 $ 307.78 $ 332.96 $ 31250 $ 338.42 $ 357.14 $ 282.53 $ 288.85 $ 337.80 $ 292.70 $ 297.00 $ 294.65 $ 256.60 $ 286.41 $ 311.07 Premiums / (Subsidy) $ 175.000 $ 175.000 $ 175.000 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Revenue $ 295.000 $ 295.000 $ 295.000 $ 399.000 $ 570.000 $ 599.000 $ 565.000 $ 599.000 $1,030,000 $ 595.000 $ 565,000 $1,665,000 $ 485.000 $ 485.000 $ 485.000 $ 525.000 $ 470.000 $ 475.000 ACQUISITION & OFF SITE COSTS Acquisition $ 101.190 $ 101.190 $ 101.190 $ 101.190 $ 101.190 $ 101.190 $ 101.190 $ 101.190 $ 202.381 S 101.190 $ 101.190 $ 303.571 $ 101.190 $ 101.190 $ 101.190 $ 101.190 $ 101.190 $ 101.190 Closing Costs $ 253 $ 253 $ 253 $ 253 $ 253 $ 253 $ 253 $ 253 $ 506 $ 253 $ 253 $ 759 $ 253 $ 253 $ 253 $ 253 $ 253 $ 253 Soils / Geology $ 1.200 $ 1.200 $ 1.200 $ 1.200 $ 1.200 $ 1.200 $ 1.200 $ 1.200 $ 2.400 $ 1.200 $ 1.200 $ 3.600 $ 1.200 $ 1.200 $ 1.200 $ 1.200 $ 1.200 $ 1.200 Civil Engineering (Design & Surveying) $ 4.350 $ 4.350 $ 4.350 $ 4.350 $ 4.350 $ 4.350 $ 4.350 $ 4.350 $ 8.700 $ 4.350 $ 4.350 $ 13.050 $ 4.350 $ 4.350 $ 4.350 $ 4.350 $ 4.350 $ 4.350 Bonds & Fees $ 1.721 $ 1.721 $ 1.721 $ 1.721 $ 1.721 $ 1.721 S 1.721 $ 1.721 $ 3.442 $ 1.721 $ 1.721 $ 5.163 $ 1.721 $ 1.721 $ 1.721 $ 1.721 $ 1.721 $ 1.721 Rough Grading $ 3,626 $ 3.626 $ 3.628 $ 3.626 $ 3.826 $ 3.626 $ 3.826 $ 3.626 $ 7.252 $ 3.626 $ 3.626 $ 10.878 $ 3.626 $ 3.626 $ 3.626 $ 3.626 $ 3.626 $ 3.626 Street Improvements $ 2,992 $ 2.992 $ 2.992 $ 2.992 $ 2.992 $ 2.992 S 2.992 $ 2.992 $ 5.984 $ 2.992 $ 2.992 $ 8.976 $ 2.992 $ 2.992 $ 2.992 $ 2.992 $ 2.992 $ 2.992 Public Underground Utilities $ 2.706 $ 2.706 $ 2.706 $ 2,706 $ 2.706 $ 2.706 $ 2.706 $ 2.706 $ 5.412 $ 2.706 $ 2.706 $ 8.118 $ 2.706 $ 2.706 $ 2.706 $ 2.706 $ 2.706 $ 2.706 Landscape & Hardscape $ 11.028 $ 11.028 $ 11.028 $ 11.028 $ 11.028 $ 11.028 $ 11.028 $ 11.028 $ 22.056 $ 11.028 $ 11.028 $ 33.084 $ 11.028 $ 11.028 $ 11.028 $ 11.028 $ 11.028 $ 11.028 Utilitiet to Structure $ 850 $ 850 $ 850 $ 850 $ 850 $ 850 $ 850 $ 850 $ 1.700 $ 850 $ 850 $ 2.550 $ 850 $ 850 $ 850 $ 850 $ 850 $ 850 Property Taxes $ 1.326 $ 1.326 $ 1.326 $ 1.326 $ 1.326 $ 1.326 $ 1.326 $ 1.326 $ 2.651 $ 1.326 $ 1.326 $ 3.977 $ 1.326 $ 1.326 $ 1.326 $ 1.326 $ 1.326 $ 1.326 Continaency $ 1.490 $ 1.490 $ 1.490 $ 1.490 $ 1.490 $ 1.490 $ 1.490 $ 1.490 $ 2.980 $ 1.490 1.490 $ 4.470 $ 1.490 $ 1.490 $ 1.490 $ 1.490 $ 1.490 $ 1.490 Estimated Total A. & Off Site Costs $ 132.732 $ 132.732 $ 132.732 $ 132.732 $ 132.732 $ 132.732 $ 132.732 $ 132.732 $ 265.464 $ 132.732 $ 132.732 $ 398.196 $ 132.732 132.732 $ 132.732 $ 132.732 $ 132.732 $ 132.732 ON SITE COSTS Parking Structure $ 31,120 $ 31.120 $ 31.120 $ 31.120 $ 31.120 $ 31.120 $ 31.120 $ 31.120 $ 62.240 $ 31.120 $ 31.120 $ 93.360 $ 31.120 $ 31.120 $ 31.120 $ 31.120 $ 31.120 $ 31.120 Residential Structure $ 70,548 $ 72.165 $ 72.590 $ 86.972 $ 157.605 $ 153.095 $ 153.861 $ 150.627 $ 245.428 $ 179.221 $ 166.456 $ 419.458 $ 141.011 $ 138.968 $ 140.075 $ 174.115 $ 139.649 $ 129.948 Decks $ 2.328 $ 2.328 $ 3.120 $ 2.618 $ 4.440 $ 3.720 $ 3.312 $ 3.672 $ 5.760 $ 5.664 $ 5.616 $ 13.176 $ 4.512 $ 4.344 $ 4.368 $ 5.712 $ 3.288 $ 3.960 Est. Total On 4 Off Site Costs Estimated Profit B4 Financing Architecture $ 12.750 $ 12.750 $ 12.750 $ 12.750 $ 12.750 $ 12.750 $ 12.750 $ 12.750 $ 25.500 $ 12.750 $ 12.750 $ 38.250 $ 12.750 $ 12.750 $ 12.750 $ 12.750 $ 1Z7S0 $ 12.750 Landscape Architecture $ 1.190 * 1.190 $ 1,190 $ 1.190 ^ 1,190 $ 1.190 $ 1.190 $ 1.190 $ 2.380 $ 1.190 $ 1.190 $ 3.570 $ 1.190 $ 1.190 $ 1.190 $ 1.190 $ 1.190 $ 1.190 Legal & Accounfing $ 1,000 $ 1.000 $ 1.000 $ 1.000 $ l.OOO $ 1.000 $ 1.000 $ 1.000 $ 2.000 $ 1.000 $ 1.000 s 3,000 $ 1.000 $ 1.000 $ 1.000 $ 1.000 $ 1.000 $ l.OOO Structural Engineering $ 1.400 S 1.400 $ 1,400 $ 1.400 $ 1.400 $ 1.400 $ 1.400 $ 1.400 $ 2.800 $ 1.400 $ 1.400 $ 4,200 $ 1.400 1.400 $ 1.400 $ 1.400 $ 1.400 $ 1.400 Mechanical Engineering $ 476 $ 476 $ 476 $ 476 $ 476 $ 476 $ 478 $ 476 $ 952 $ 476 $ 476 $ 1.429 $ 476 476 $ 476 $ 476 $ 476 $ 476 Electrical Engineering $ 476 $ 476 $ 476 $ 476 $ 476 $ 476 $ 478 $ 476 $ 952 $ 476 $ 476 $ 1.429 $ 476 $ 476 476 ? 476 $ 476 $ 476 Prints $ 290 i 290 $ 290 $ 290 $ 290 $ 290 $ 290 $ 290 $ 580 $ 290 $ 290 $ 870 $ 290 $ 290 $ 290 $ 290 $ 290 $ 290 Insurance $ 15.500 s 15,500 $ 15.500 $ 15,500 $ 15.500 $ 15.500 $ 15.500 $ 15.500 $ 31.000 $ 15.500 $ 15.500 $ 46.500 $ 15.500 $ 15.500 $ 15.500 $ 15.500 $ 15.500 $ 15,500 Permits & Impact Fees $ 12.518 $ 12.805 $ 12.880 $ 15.432 $ 27.965 $ 27.165 $ 27.301 $ 26.727 $ 43.548 $ 31.801 $ 29.536 $ 74.428 $ 25.021 $ 24.658 $ 24.855 $ 30.895 $ 24.779 $ 23.058 School Fees $ 1.774 $ 1.815 $ 1.825 ^ 2.187 $ 3.963 $ 3.850 $ 3.869 $ 3.788 $ 6.172 $ 4.507 $ 4.186 $ 10.548 $ 3.546 $ 3.495 $ 3.522 $ 4,378 $ 3.512 $ 3.268 HOA Reserve $ 2.640 $ 2.640 $ 2.640 $ 2.640 $ 2.640 $ 2.640 $ 2.640 $ 2.640 $ 5.280 $ 2.640 $ 2.640 $ 7.920 $ 2.640 $ 2.640 $ 2.640 $ 2.640 $ 2.640 $ 2.640 Warranty Accrual $ 2.213 $ 2.213 $ 2.213 $ 2.993 $ 4.275 $ 4.493 $ 4.238 $ 4,493 $ 7.725 $ 4.463 $ 4.238 $ 12.488 $ 3.638 $ 3.638 $ 3.638 $ 3.938 $ 3.525 S 3.563 Indirect Construction $ 1.989 $ 1.989 $ 1.989 $ 1.989 $ 1.989 $ 1.989 $ 1.989 $ 1.989 $ 3.978 $ 1.989 $ 1.989 $ 5.967 $ 1.989 $ 1.989 $ 1.989 $ 1.989 $ 1,989 $ 1.989 Model Costs $ 5.951 $ 5.951 $ 5.951 $ 5.951 $ 5.951 $ 5.951 $ 5.951 $ 5.951 $ 11.902 $ 5.951 $ 5.951 $ 17.853 $ 5.951 $ 5.951 $ 5.951 $ 5.951 $ 5,951 $ 5.951 Model Maintenance $ 300 $ 300 $ 300 $ 300 $ 300 $ 300 $ 300 $ 300 $ 600 $ 300 $ 300 $ 900 $ 300 $ 300 300 $ 300 $ 300 $ 300 Marketing $ 2.213 $ 2.213 $ 2.213 $ 2.993 $ 4.275 $ 4.493 $ 4.238 $ 4.493 $ 7.725 $ 4.463 $ 4.238 $ 12.486 $ 3.636 $ 3.638 $ 3.638 $ 3.93S $ 3.525 $ 3.563 Sates Commissions $ 13.275 $ 13.275 $ 13.275 $ 17.955 $ 25.650 $ 26.955 $ 25.425 $ 26.955 $ 46.350 $ 26.775 $ 25.425 $ 74.925 $ 21.825 $ 21.825 $ 21.825 $ 23.625 $ 21.150 $ 21.375 Closing Costs S 3.245 $ 3.245 $ 3.245 $ 4.389 $ 6.270 $ 6.589 $ 6.215 $ 6.589 $ 11.330 $ 6.545 $ 6.215 $ 18.315 $ 5.335 $ 5.335 $ 5.335 $ 5.775 $ 5.170 $ 5.225 General & Administrative $ 10.979 $ 11.121 $ 11.227 $ 12.510 $ 18.962 $ 18.523 $ 18.532 $ 18.303 $ 31.473 $ 20.977 $ 19.836 $ 52.175 $ 17.460 $ 17.267 $ 17.366 $ 20.488 $ 17.224 $ 16.438 Contractor Costs $ 4.015 $ 4,067 $ 4.106 $ 4.575 $ 6.935 $ 6.774 $ 6.778 $ 6.694 $ 11.510 $ 7.672 $ 7.254 $ 19.081 ? 6.386 $ 6.315 $ 6.351 $ 7.493 $ 6.299 $ 6.011 t 126.47I < i7r.on I .26.311 1 142J66 f 216.706 s 2.1606 1 3.1.716 t 20.160 1 396.666 < 236.736 t 236.667 1 9663*5 S mow 1 .07.336 1 n*.466 I 234.152 S .66.690 6 167.696 Estimated Total On Site Costs $ 198.190 $ 200.327 $ 201.777 $ 227.704 $ 335.423 $ 330.739 $ 328.850 $ 327.422 $ 567.186 $ 367.168 $ 348.081 $ 932,328 $ 307.453 $ 304.564 $ 306.054 $ 355.438 $ 303.204 $ 291.490 Estimated Total Off Site Costs $ 132.732 $ 132.732 $ 132.732 $ 132.732 $ 132.732 $ 132.732 $ 132.732 $ 132.732 $ 265.464 $ 132.732 $ 132.732 $ 398.196 $ 132.732 $ 132.732 $ 132.732 $ 132.732 $ 132.732 $ 132.732 $ 2.125.000 $ 5.313 $ 25.200 $ 91.350 $ 36.141 $ 76.146 $ 62.832 $ 56.826 $ 231.588 $ 17.850 $ 27.838 $ 31.289 $ 2.787.372 $ 653.520 $ 2.791.791 $ 81.936 $ 267.750 $ 24.990 $ 21.000 $ 29.400 $ 10.000 ? 10.000 $ 6.090 $ 325.500 $ 495.371 $ 70.205 $ 55.440 $ 77.978 $ 41.769 $ 124.971 $ 6.300 $ 77.978 $ 467.865 $ 114.367 $ 350.862 $ 128.315 COSTS PER UNIT $ 12.750 $ 1.190 $ 1.000 $ 1.400 $ 476 $ 476 $ 290 $ 15.500 $ 23.589 $ 3.343 $ 2.640 $ 3.713 $ 1,989 $ 5.951 $ 300 $ 3.713 $ 22.279 $ 5.446 $ 16.708 $ 6.110 FINANCING Costs Less Sales Costs $ 314.402 $ 316.539 $ 317.989 $ 338.092 $ 436.235 $ 429.927 $ 429.942 $ 426.610 $ 774.970 $ 466.580 $ 449.173 $1,237,284 $ 413.025 $ 410.136 $ 411.626 $ 458.770 $ 409.616 $ 397.622 Construction Loan Amount $ 267.241 $ 269.058 $ 270.290 $ 287.378 $ 370.799 $ 365438 $ 365.451 $ 362.619 $ 658.725 $ 396.593 $ 381.797 $1,051,691 $ 351.071 $ 348.616 $ 349.882 $ 389.955 $ 348.174 $ 337.978 $ 8.438.536 $ 7.172.755 Cash Required Origination Fee $ 3.341 $ 3.363 $ 3.379 $ 3.592 $ 4.635 $ 4.568 $ 4.568 $ 4.533 $ 8.234 $ 4.957 $ 4.772 $ 13.146 $ 4.388 $ 4.358 $ 4.374 $ 4.874 $ 4.352 $ 4.225 Interest Costs $ 13.028 $ 13.117 $ 13.177 $ 14.010 $ 18.076 $ 17.815 $ 17.816 $ 17.678 $ 32.113 $ 19.334 $ 18.613 $ 51.270 $ 17.115 $ 16.995 $ 17.057 $ 19.010 $ 18.973 $ 16.476 Total Financinq Costs $ 16.369 $ 16.480 $ 16,555 $ 17.602 $ 22.711 $ 22.383 $ 22.384 $ 22.210 $ 40.347 $ 24.291 S 23.385 $ 64.416 $ 21.503 $ 21.353 $ 21.430 $ 23.885 $ 21.326 $ 20.701 COSTS PERCENT OF PER TOTAL so. FT. COSTS $ 64.77 22.48% $ 0.16 0.06% $ 0.77 0.27% $ 2.78 0.97% $ 1.10 0.38% $ 2.32 0.80% $ 1.92 0.66% $ 173 0.60% $ 7.06 2.45% $ 0.54 0.19% $ 0.85 0.29% $ 0.95 0.33% i 84 97 29.46% S 2019 $ 32.50 6.91% $ 85.10 29.51% $ 27.98 0.87% $ 8.16 2.83% ? 0.76 0.26% $ 0.64 0.22% $ 0.90 0.31% $ 0.30 0.11% $ 0.30 0.11% $ 0.19 0.06% $ 9.92 3.44% $ 15.10 5.24% s 2.14 0.74% $ 1.69 0.59% S 2.38 0.82% $ 1.27 0.44% $ 3.81 1.32% 0.19 0.07% s 2.38 0.82% $ 14.26 4.95% s 3.49 1.21% $ 10.70 3.71% s 3.91 1.36% 330.922 I $ 333.059 I $ 334.509 I $ 360.436 I $ 468.155 I $ 463.471 I $ 461.582 I $ 460.154 I $ 832.650 I $ 499.900 I $ 480.813 I $1.330.524 I $ 440.185 I $ 437.296 I $ 438.786 I $ 488.170 I $ 435.936 I $ 424.222 I I $ 9.020.768 I I $ 429.5601 I $ 274.97 I 9536%! (35.922)1 $ (38.059)1 $ (39.509)1 $ 38.564 I $ 101.845 I $ 135.529 I $ 103.418 I $ 138.846 I $ 197.350 I $ 95.100 I $ 84.187 I $ 334.476 I $ 44.815 I $ 47.704 I $ 46.214 I $ 36.830 I $ 34.064 | $ 50.778 I I $ 1.376.2321 I t 65.535 ] I $ 41.95 I 14.55%! $ 257.23 89.20% $ 218.84 75.82% 1$ 47,160 1$ 47.4811$ 47.698 1$ 50.714 1$ 65435 1$ 64.469 1$ 64.491 1 $ 63.992 1$ 116.246 1$ 69.967 1 $ 67.376 1$ 185593 1$ 61.954 1$ 61.520 1$ 61.744 1$ 68.816 1$ 61.442 1$ 59.6431 I $ 1.265.780l I $ 60.275 1 I $ 38.58 I 13.38%! $ 2.73 0.95% $ 10.66 3.70% $ 13.39 4.64% Total Estimated Costs PROFIT / (LOSS) I $ 347.290 ! $ 349.539 ! $ 351.064 ! $ 378.037 j $ 490.866 ! $ 485.654 ! $ 483.966 I $ 482.364 I $ 872.997 I $ 524.191 1 $ 504.198 I $1.394.940 ! $ 461.688 I $ 458.649 I $ 460.216 I $ 512.055 ! $ 457.262 I $ 444.9231 I $ 9.460.0991 I $ 450.461 1 j $ 288.36 I 100.00%! Estimated Pretax Profit $ (52.290) $ (54.539) $ (56.064) $ 20.963 $ 79.134 $ 113.146 $ 81.034 $ 116.636 $ 157.003 $ 70.809 $ 60.802 $ 270.060 $ 23.312 $ 26.351 $ 24.784 $ 12.945 $ 12.738 $ 30.077 Estimafed Pretax Profit Percentaqe -17.73% -18.49% -19 00% 5.25% 13.88% 18.89% 14.34% 19.47% 15 24% 11.90% 10.76% 16.22% 4.81% 543% 511% 2.47% 271% 6.33% 9/23/2002 9:50 AM Carlsbad 21 Loguno Poirit' CA21 •09230: e ENTRA HOMES. LLC Etrt a Lane Conalruclfan Com. 1 2 3 4 s 29 « 2) 7. » 9 f3 10. 11. 12 14 li It (7 It f9 PRODUCT PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN A B C D E E-1 F F-1 G H H-1 J J-1 J-2 J-3 K L M Mix 1 1 1 1 1 1 1 1 2 1 1 3 1 1 1 1 1 1 Square Footaqe (Unit) 829 848 853 1022 1852 1799 1808 1770 1442 2106 1956 1643 1657 1633 1646 2046 1641 1527 Mix Percentaqe 3% 3% 3% 3% 6% 5% 6% 5% 9% 6% 6% 15% 5% 5% 5% 6% 5% 5% Deck Square Feet 97 97 130 109 185 155 138 153 120 236 234 183 188 181 182 238 137 165 Total Square Feet (Less Deck) 829 848 853 1022 1852 1799 1808 1770 2884 2106 1956 4929 1857 1633 1646 2046 1641 1527 Landscape 8> Hardscape Sales Price $ 120.000 $ 120.000 $ 120.000 $ 399.000 $ 570.000 $ 599.000 $ 565.000 X 599.000 $ 515.000 X 595.000 X 565.000 $ 555000 X 485.000 X 485.000 X 485.000 $ 525.000 X 470.000 X 475.000 Dollars Per Sguare Foot $ 144.75 $ 141.51 $ 140.68 $ 390.41 $ 307.78 $ 33296 $ 312.50 X 338.42 $ 357.14 $ 282.53 X 288.85 $ 337.80 $ 292.70 X 297.00 X 294.65 X 256 SO X 286.41 s 311 07 Premiums / (Subsidy) $ 217.000 $ 217.000 $ 217.000 $ $ $ $ X $ $ $ $ X X X $ X $ Revenue $ 337.000 $ 337.000 $ 337.000 $ 399.000 $ 570.000 $ 599,000 $ 565.000 X 599.000 $1,030,000 $ 595.000 $ 565.000 $1,665,000 X 485.000 X 485.000 $ 485000 $ 525 000 X 470.000 $ 475 000 ACQUISITION a OFF SITE COSTS « I26.9601 Acquisition $ 101.190 $ 101,190 $ 101.190 $ 101.190 $ 101.190 $ 101,190 $ 101.190 $ 101,190 $ 202.381 $ 101.190 $ 101.190 $ 303.571 X 101,190 X 101.190 $ 101.190 $ 101.190 X 101.190 X 101.190 Closinq Costs $ 253 $ 253 $ 253 $ 253 $ 253 $ 253 $ 253 $ 253 $ 506 $ 253 $ 253 $ 759 X 253 X 253 $ 253 $ 253 X 253 X 253 Soils / Geology $ 1.200 $ 1.200 $ 1.200 $ 1.200 $ 1.200 $ 1.200 $ 1.200 $ 1,200 $ 2.400 $ 1.200 $ 1.200 $ 3.600 I 1.200 X 1.200 $ 1.200 $ 1.200 X 1.200 X 1.200 Civil Engineering (Design 4 Sun/evinq) $ 4.350 $ 4.350 $ 4.350 $ 4.350 $ 4.350 $ 4.350 $ 4.350 $ 4,350 X 8.700 $ 4.350 $ 4.350 $ 13.050 X 4.350 X 4.350 $ 4.350 4.350 $ 4.350 X 4.350 Bonds & Fees $ 1.721 $ 1,721 $ 1,721 $ 1.721 $ 1.721 $ 1.721 $ 1.721 $ 1,721 X 3.442 $ 1.721 $ 1.721 X 5163 X 1.721 I 1.721 $ 1.721 $ 1.721 $ 1.721 X 1.721 Rough Gradinq $ 3.826 $ 3.626 $ 3,626 $ 3.626 $ 3.626 $ 3.626 $ 3.626 $ 3,626 X 7.252 $ 3.626 $ 3.626 I 10.878 X 3.626 X 3.626 X 3.626 $ 3.626 $ 3.826 X 3.626 Street Improvements $ 2.992 $ 2.992 S 2,992 $ 2.992 $ 2.992 $ 2.992 X 2.992 $ 2,992 X 5.984 $ 2.992 $ 2.992 X 8.976 X 2.992 X 2.992 X 2.992 X 2.992 $ 2.992 X 2.992 Public Underground Utilities $ 2.706 $ 2.706 $ 2,706 $ 2.706 $ 2.706 $ 2.706 $ 2.706 $ 2,706 X 5412 $ 2.706 $ 2.706 X 8.118 X 2.706 X 2.706 I 2.706 X 2.706 $ 2.706 $ 2.706 Landscape & Hardscape $ 11.028 $ 11.028 $ 11,028 $ 11.028 $ 11.028 $ 11,028 X 11.028 $ 11,028 X 22.056 $ 11.028 $ 11.028 X 33.084 $ 11.028 X 11.028 $ 11.028 X 11.028 $ 11.028 $ 11.028 Utilities to Structure $ 850 $ 850 $ 850 $ 850 $ 850 $ 6S0 $ 850 $ 850 X 1.700 $ 850 $ 850 X 2.550 $ 850 X 850 $ 850 X 850 $ 850 $ 850 Property Taxes $ 1.326 $ 1.326 $ 1,326 $ 1.326 $ 1.326 $ 1.326 $ 1.326 $ 1,326 X 2.651 $ 1.326 $ 1.326 X 3.977 $ 1,326 X 1.326 $ 1.326 X 1.326 $ 1.326 X 1.326 Contingency $ 1.490 $ 1.490 $ 1,490 $ 1.490 $ 1.490 $ 1.490 $ 1.490 $ 1,490 X 2.980 $ 1.490 $ 1.490 X 4.470 $ 1.490 X 1.490 X 1.490 X 1.490 $ 1.490 $ 1.490 Estimated Total A. & Off Site Costs $ 132.732 $ 132.732 $ 132,732 $ 132.732 $ 132.732 $ 132,732 $ 132.732 $ 132,732 $ 265.464 $ 132.732 $ 132.732 $ 398.196 $ 132.732 X 132.732 $ 132.732 s 132.732 X 132.732 X 132 732 ON SITE COSTS .1.542 ' 31.943 ' 31.542 * 31.542 * 31542 9 31.542 ' 31543 • 31.542 ' 63063 ' 31.542 31542 «625 9 3 , 942 9 3, 942 9 3 , 942 9 3 , 542 9 3,9.2 9 31 542 Parking Structure $ 31.120 $ 31.120 % 31,120 $ 31.120 $ 31.120 $ 31.120 $ 31.120 $ 31,120 $ 62.240 $ 31.120 X 31.120 $ 93.360 $ 31.120 X 31.120 X 31.120 X 31.120 X 31.120 $ 31.120 Residential Structure $ 70.548 $ 72.165 $ 72.590 $ 86.972 $ 157.605 $ 153.095 $ 153.861 $ 150,627 $ 245.428 $ 179.221 $ 166.456 $ 419.458 $ 141.011 X 138.968 X 140.075 X 174.115 X 139649 $ 129.948 Decks $ 2.328 $ 2.328 $ 3.120 $ 2.616 $ 4.440 $ 3.720 $ 3.312 $ 3,672 $ 5.760 X 5.664 $ 5618 $ 13.176 X 4.512 X 4.344 $ 4.368 $ 5.712 X 3.288 $ 3960 Architecture Architecture $ 12.750 $ 12.750 $ 12.750 $ 12.750 $ 12.750 X 12.750 $ 12.750 X 12.750 $ 25.500 $ 12.750 $ 12.750 $ 38.250 $ 12.750 $ 12.750 $ 12.750 $ 12.750 X 12.750 $ 12.750 Landscape Architecture $ 1.190 $ 1.190 $ 1.190 $ 1.190 $ 1.190 $ 1.190 $ 1.190 X 1.190 X 2.380 X 1.190 X 1.190 $ 3.570 X 1.190 $ 1.190 X 1.190 X 1.190 X 1.190 $ 1.190 Legal & Accounting $ 1.000 $ 1.000 $ 1.000 $ 1.000 $ 1.000 $ 1.000 $ 1.000 X 1.000 $ 2.000 I 1.000 $ 1.000 3.000 X 1.000 $ 1.000 $ 1.000 I 1.000 X 1.000 $ 1.000 Structural Engineering $ 1.400 $ 1.400 $ 1.400 $ 1.400 ^ 1.400 $ 1.400 $ 1.400 X 1.400 X 2.800 X 1.400 $ 1.400 X 4.200 X 1.400 $ 1.400 $ 1.400 1.400 $ 1.400 $ 1.400 Mechanical Engineering $ 476 $ 476 $ 476 $ 476 $ 476 $ 476 $ 476 X 476 X 952 X 476 $ 476 $ 1.429 X 476 X 476 X 476 X 476 X 476 $ 476 Electrical Enqinaerinq $ 476 $ 476 $ 476 $ 476 476 $ 476 X 476 X 476 X 952 X 476 $ 476 $ 1.429 X 476 X 476 I 476 476 X 476 $ 476 Prints $ 290 $ 290 $ 290 $ 290 $ 290 $ 290 X 290 X 290 580 X 290 X 290 $ 870 X 290 X 290 $ 290 X 290 X 290 $ 290 Insurance $ 15.500 $ 15.500 $ 15.500 $ 15.500 $ 15.500 $ 15.500 $ 15.500 X 15.500 X 31.000 $ 15.500 $ 15.500 X 48.500 X 15.500 X 15500 X 15.500 $ 15.500 $ 15500 $ 15.500 PermKs & Impact Fees $ 12.518 $ 12.805 $ 12.880 $ 15.432 $ 27.965 $ 27.155 $ 27.301 X 26.727 $ 43.548 $ 31.801 X 29.536 X 74.428 $ 25.021 X 24.658 X 24.855 X 30.895 $ 24.779 $ 23.058 School Fees $ 1.774 $ 1.815 $ 1.825 $ 2.187 $ 3.963 $ 3.850 $ 3.869 $ 3.788 X 6.172 X 4.507 X 4.186 $ 10.548 $ 3.546 $ 3.495 X 3.522 X 4.378 $ 3.512 $ 3.268 HOA Reserve $ 2.640 $ 2.640 $ 2.640 $ 2.640 $ 2.640 $ 2.640 $ 2.640 $ 2.640 $ 5.280 2.640 X 2.640 $ 7.920 $ 2.640 X 2.640 X 2.640 X 2.640 $ 2.640 $ 2.640 Warranty Accrual $ 2.528 $ 2.528 $ 2.528 $ 2.993 $ 4.275 $ 4.493 $ 4.238 $ 4.493 $ 7.725 X 4.463 X 4.238 $ 12.488 $ 3.638 $ 3.638 } 3.638 X 3.R38 X 3.525 X 3 563 Indirect Construction $ 1.989 $ 1.989 $ 1.989 $ 1.989 $ 1.989 $ 1.989 X 1.989 $ 1.989 $ 3.97B X 1.989 $ 1.989 > 5.967 J 1.989 X 1.989 X 1.989 X 1.989 X 1.989 X 1989 Model Costs $ 5.951 $ 5951 $ 5.951 $ 5.951 $ 5951 $ 5.951 $ 5.951 $ 5.951 $ 11.902 $ 5.951 X 5.951 X 17.853 $ 5.951 $ 5.951 I 5951 I 5,951 $ 5.951 X 5.951 Model Maintenance $ 300 $ 300 $ 300 $ 300 $ 300 $ 300 $ 300 $ 300 $ 600 $ 300 $ 300 X 900 $ 300 $ 300 $ 300 X 300 $ 300 X 300 Marketinq $ 2.528 $ 2.528 $ 2.528 2.993 $ 4.275 $ 4.493 4.238 X 4.493 % 7.725 $ 4.463 X 4.238 12.488 $ 3.638 $ 3.638 X 3.638 $ 3.938 $ 3.525 X 3.563 Sales Commissions $ 15.165 $ 15.165 $ 15.165 $ 17.955 $ 25.650 $ 26.955 $ 25.425 I 26,955 $ 46.350 $ 26.775 $ 25.425 X 74.925 X 21.825 $ 21.825 $ 21.825 $ 23.625 $ 21.150 X 21.375 Closing Costs $ 3.707 $ 3.707 3.707 $ 4.389 $ 6.270 $ 6.569 $ 6.215 X 6.589 $ 11.330 X 6.545 $ 6.215 18.315 X 5,335 $ 5.335 $ 5.335 X 5.775 $ 5.170 X 5.225 General & Administrative $ 11.007 $ 11.148 $ 11.255 $ 12.510 $ 18.962 $ 18.523 X 18.532 X 18.303 $ 31.473 X 20.977 $ 19.836 X 52.175 $ 17.460 $ 17.267 $ 17.366 X 20.488 % 17.224 X 16.438 Contractor Costs $ 4.025 $ 4.077 $ 4.116 $ 4.575 $ 6.935 $ 8.774 X 6.778 $ 6.694 $ 11.510 X 7.672 $ 7.254 X 19.081 $ 8.386 X 6.315 $ 6.351 X 7.493 X 6.299 X 6.011 Estimated Total On Site Costs Estimated Total Off Site Costs Est. Total On 8, Off Site Costs Estimated Profit B4 Financing 333.941 I X 336.079 ! X 337.528 ! $ 360.436 ! $ 468.155 ! $ 463.471 ! $ 461.582 ! X 460.154 j X 832.650 ! X 499.900 I X 480.813 ! X1.330.524 I X 440.185 I X 437.296 I X 438.786 I $ 486.170 I X 435.936 I X 424.222 I 128J46 X 6,242.455 X 2.787.372 . • • - • - • - • - • - •— . - ^ . ^ . I . ^.z....^^ I . I . ^w..^ I .. ..^...^ I ! $ 9.029.827"I 3.059 ! $ 921 ! $ (528)! $ 38.564 1 X 101.845 ! X 135,529 ! X 103.418 ! X 138.846 I X 197.350 ! X 95.100 I X 84.187 ! X 334.476 I X 44.815 I X 47.704 I X 46.214 I X 36.830 I X 34.064 I X 50.778 I ! X 1.493.1731 Costs Less Sales Costs Construction Loan /Amount X 315.069 I $ 317.207 I $ 318.656 I $ 336.092 I $ 436.235 I $ 429.927 I $ 429.942 I $ 426.610 I $ 774.970 I X 466.580 I X 449.173 I X1.237.284 I X 413.025 | X 410.136 I X 411.626 ! X 458.770 I X 409.816 I X 397.622 X 267.809 ! X 269626 1 X 270.858 I X 287.378 ! X 370.799 ! X 365.438 ! X 365.451 ! X 362.619 I X 658.725 I X 396!593 I X 381797 I XI.051.691 I X 351,071 I X 348'616 I X 349'882 I $ 3891955 I $ 348.174 I X 337!978 X 8.440.539 X 7.174.458 COSTS PER UNIT COSTS PER SQ. FT. PERCENT OF TOTAL COSTS Cash Required Origination Fee X 3.348 X 3.370 $ 3.386 $ 3.592 $ 4.635 $ 4.568 $ 4.568 $ 4.533 $ 8.234 X 4.957 X 4.772 X 13.146 X 4.388 $ 4.358 $ 4.374 X 4.874 X 4.352 X 4.225 Interest Costs $ 13.056 X 13.144 $ 13.204 $ 14.010 $ 18.076 $ 17.815 $ 17.818 $ 17.678 X 32.113 X 19.334 X 18.613 I 51.270 X 17.115 $ 16.995 $ 17.057 X 19.010 X 16.973 X 16.476 Total Financinq Costs $ 16.403 $ 16515 $ 16.590 $ 17.602 $ 22.711 $ 22.363 $ 22.384 $ 22.210 X 40.347 X 24.291 X 23,385 X 64,416 X 21.503 $ 21.353 X 21.430 X 23.885 X 21.326 $ 20.701 Total Estimated Costs Total Estimated Costs $ 350.345 1 $ 352594 ! $ 354.118 ! $ 378.037 ! $ 490.866 ! $ 485 854 ! $ 483.966 ! $ 482.364 ! $ 872.997 I $ 524.191 | $ 504.198 ! $1,394,940 ! $ 461.888 1 $ 458.649 1 $ 460 216 1 $ 512 055 1 $ 457 262 1 $ 444 923 PROFIT / (LOSS) Estimated Pretax Profit PROFIT / (LOSS) Estimated Pretax Profit X (13.345) $ (15594) $ (17.118) $ 20.963 $ 79.134 $ 113.146 $ 81.034 $ 116.636 X 157.003 I 70.809 X 60.802 X 270.060 $ 23.312 $ 26.351 X 24.784 X 12.945 X 12.738 X 30.077 Estimated Pretax Profit Percentaqe -3 96% -4.63% -5.08% 5.25% 13.88% 18.89% 14 34% 1947% 1524% 11.90% 10.76% 16.22% 4.81% 543% 5.11% 2.47% 271% 6.33% ! X 429.992 1 ! $ 275.25 I 95.36%! X 71.1031 I X 4552 ! 1577%! !X 47.260 I X 47.581 ! X 47.798 ! X 50.714 ! X 65.435 ! X 84.469 ! X 64.491 I X 63.992 ! X 116.246 ! X 69.987 I X 67.376 I X 185593 I X 61.954 jX 61.520 I X 61.744 I X 68.816 I X 61.442 I X 59.643 1 I X 1.266.081 1 | X 60.290 I ! X 38.59 ! 13.37%! ! $ 9.469.2621 I $ 450.917 I ! $ 288.64 I 100.00%! $ 1.053,738 10.01% ! $ 50.178 1 ! X 32.12 ! 11.13%! 9/23/2002 9:50 AM September 18, 2003 TO: BUILDING DEPARTMENT FROM: Management Analyst, Redevelopment Department LAGUNA POINT (RP01-08/CT 01-13) APN: 203-101-30,32,33 PLAN CHECK NO. PC030045 I have completed the first plan check for the above referenced project. The Housing and Redevelopment Commission approved this project on April 9, 2002. The following conditions of approval must be satisfied prior to the issuance of the building permit: 1. Developer shall submit and obtain final approval of a Final Landscape and Irrigation Plan showing conformance with the approved Preliminary Landscape Plan and the City's Landscape Manual. The final landscape plan shall specifv an averaae minimum 15-trunk height for the palm trees which shall be of varying heights. Landscape and irrigation plans must be submitted through a separate landscape plancheck process. Please consult staff at the Planning Counter for further information. 2. Prior to issuance of the building permit. Developer shall submit to the City a Notice of Restriction to be filed in the Office of the County Recorder. Housing & Redevelopment staff will prepare the Notice of Restriction. Developer shall sign and notarize the Notice and return to the Housing & Redevelopment Department for final processing. 3. A note shall be added to the lighting plan (Sheets E6 and E7) indicating all exterior lights are to be designed to reflect downward to avoid any impacts on adjacent residents or property. 4. Prior to issuance of the building permit, the Developer shall provide the Housing and Redevelopment Department with a recorded copy of the official CC&Rs that have been approved by the Department of Real Estate. 5. Prior to the issuance of the building permit, the Developer shall submit to the Housing and Redevelopment Department a reproducible 24" x 36" mylar copy of the final site plan for the project. This information has been entered into Permits Plus. If you have any questions, please contactine at x2813. LORI H. ROSENSTEIN C: Bill Behun, Architect Bill Canepa, Owner Larry Black, Landscape Plancheck Consultant