HomeMy WebLinkAboutRP 04-19; O'Ireland; Redevelopment Permits (RP) (2)Citv of Carlsbad
Housing & Redevelopment Department
November 4, 2004
ANTHONY CROSS
O IRELAND
2808 STATE STREET
CARLSBAD, CA 92008
Re: Approval of Sidewalk Sign Permit
Dear Mr. Cross:
Thank you for submitting your application for a Sidewalk Sign Permit. Having received all
required documents your application has been approved. Attached is a copy of the approved
Sidewalk Sign Permit for your records.
The attached permit allows you to retain your sign for; 1) as long as the Housing and
Redevelopment Commission allows sidewalk signs to remain, 2) as long as the sign continues
to meet the standards outlined within the Carlsbad Village Master Plan and Design Manual, and
3) as long as the sign is consistent with this permit approval. It is important to note that the
Housing and Redevelopment Commission will complete an annual review of the sidewalk sign
regulations to determine their continued applicability. A valid Certificate of Insurance is required
for as long as the A-Frame sign continues to be placed within the public right-of-way.
If you should have any questions regarding the information contained in this letter, please call
me at (760) 434-2813.
Sincerely,
CITY OF CARLSBAD
^^^^^
CLIFF JONES
Assistant Planner
Attachment
2965 Roosevelt St., Ste. B • Carlsbad, CA 92008-2389 • (760) 434-2810/2811 • FAX (760) 720-2037 ^