Loading...
HomeMy WebLinkAboutRP 05-04; Army & Navy Academy Master Plan; Redevelopment Permits (RP) (2)CITY OF CARLSBAD LAND USE REVIEW APPLICATION 1) APPLICATIONS APPLIED FOR: (CHECK BOXES) (FOR DEPARTMENT USE ONLY) (FOR DEPARTMENT USE ONLY) • Administrative Peririit • Planned Industrial Permit • Administrative Variance • Planning Commission Determination Coastal Development Permit • Precise Development Plan • Conditional Use Permit Redevelopment Permit • Condominium Permit • Site Development Plan Environmental Impact Assessment • Special Use Permit • General Plan Amendment • Specific Plan • Hillside Development Permit • Tentative Parcel Map Obtain from Engineering Department • Local Coastal Plan Amendment • Tentative Tract Map • Master Plan • Variance • Non-Residential Planned Development • Zone Change • Planned Development Permit • List other applications not specified 2) 3) 4) ASSESSOR PARCEL NO(S).: PROJECT NAME: 203-010-16, 203-025-01, 203-041-02, 203-043-06, 203-051-03, 203-052-01 203-052-02, 203-053-01, 203-142-06, 203-141-02, 203-141-23 Army & Navy Academy Master Plan BRIEF DESCRIPTION OF PROJECT: Please see attached 5) OWNER NAME (Print or Type) Neil Nydegger, Chairman Board of Trustees, Army & Navy Academy 6) APPLICANT NAME (Print or Type) Hofman Planning Associates MAILING ADDRESS 2606 Carlsbad Boulevard MAILING ADDRESS 5900 Pasteur Court, Suite 150 CITY AND STATE ZIP TELEPHONE Carlsbad.CA 92018 (760)729-2385 CITY AND STATE ZIP TELEPHONE Carlsbad, CA 92008 (760)438-1465 1 CERTIFY THAT 1 AM THE LEGAL OWNER AND JHAJ ALL THE ABOVE INFORMATION IS TRUE AND CORRECT TO THE BEST OF MY 1 CERTIFY THAT 1 AM THE LEGAL REPRESENTATIVE OF THE OWNER AND THAT ALL THE ABOVE INFORMATION IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE. SIGfMATURE i \ J|\ DATE SIGNATURE 6 DATE 7) 'BRIEF LEGAL DESCRIPTION Portion of Lot 47 of Map No. 1782, Lot 46 of Map No. 1782, Lots 98-101 (inclusive) of Map No. 1782, Lots 75, 76 & 94-96 of Map No. 2037, Lots 153- 170 & Lots 177-198 of Map No. 2037, Portion of Blocks 1 & 2 of Oceanside Addition of Map No. 893, Lots 58-73, Lots 102-130 & Lots 132-150 of Map No. 2037. Form 16 PAGE 1 OF 2 NOTE: * A PROPOSED PROJECT REQul^G MULTIPLE APPLICATIONS BE FILED, BE SUBMITTED PRIOR TO 3:30 P.M. A PROPOSED PROJECT REQUIRING ONLY ONE APPLICATION BE FILED, MUST BE SUBMITTED PRIOR TO 4:00 P.M. 8) LOCATION OF PROJECT: 2605 Carlsbad Boulevard ON THE BETWEEN East and West STREETADDRESS CORNER OF Carisbad Boulevard (NORTH, SOUTH, EAST, WEST) (NAME OF STREET) Mountain View Drive AND (NAME OF STREET) Beech Avenue (NAME OF STREET) 9) LOCAL FACILITIES MANAGEMENT ZONE 10) PROPOSED NUMBER OF LOTS 13) TYPE OF SUBDIVISION 16) PERCENTAGE OF PROPOSED PROJECT IN OPEN SPACE 19) GROSS SITE ACREAGE 22) EXISTING ZONING N/A N/A N/A 15.89 V-R, R-3, DS, BAOZ Zone 1 11) NUMBER OF EXISTING RESIDENTIAL UNITS 14) PROPOSED IND OFFICE/ SQUARE FOOTAGE 17) PROPOSED INCREASE IN ADT 20) EXISTING GENERAL PLAN 7 staff 330 beds N/A RHM, P, OS 23) PROPOSED ZONING V-R, R-3, DS, BAOZ 12) PROPOSED NUMBER OF RESIDENTIAL UNITS 15) PROPOSEDCOMM SQUARE FOOTAGE 18) PROPOSED SEWER USAGE IN EDU 21) PROPOSED GENERAL PLAN DESIGNATION 24) HABITAT IMPACTS 27 additio lal staff 70 additio lal beds N/A RHM, P, OS N 25) IN THE PROCESS OF REVIEWING THIS APPLICATION IT MAY BE NECESSARY FOR MEMBERS OF CITY STAFF, PLANNING COMMISSIONERS, DESIGN REVIEW BOARD MEMBERS OR CITY COUNCIL MEMBERS TO INSPECT AND ENTER THE PROPERTY THAT IS THE SUBJECT OF THIS APPLICATION. I/WE CONSENT ENTRY FOR THIS PURPOSE FOR CITY USE ONLY FEE COMPUTATION APPLICATION TYPE TOTAL FEE REQUIRED FEE REQUIRED RECBVED MAR 2 h 2005 CITYOFCARLSBAD MOUSING &J£DEvgnpiieiT DATE STAMP Mimmt)N RECEIVED RECEIVED BY: DATE FEE PAID RECEIPT NO. Form 16 PAGE 2 OF 2 PROJECT DESCRIPTION PRQJECT NAME: Armv & Navy Academv Master Plan APPLICANT NAME: Hofman Planninq Associates Please describe fully the proposed project by application type. Include any details necessary to adequately explain the scope and/or operation ofthe proposed project. You may also include any background information and supporting statements regarding the reasons for, or appropriateness of, the application. Use an addendum sheet if necessary. Description/Explanation: The proposed project consists of a conceptual master site plan for the Army and Navy Academy that will guide the future renovation ofthe campus facilities. The Army and Navy Academy Master Plan covers 15.89 acres and is located north of Carisbad Village Drive and south of Buena Vista Lagoon with Carisbad Boulevard passing through the property, which is located within the northwest quadrant of the City of Carisbad. The site is bounded on the north by Pacific Avenue, on the east by the San Diego Northern (SDN) Railroad, on the south generally by Cypress Avenue (though portions ofthe site are situated south of and adjacent to Cypress Avenue) and on the west by the Pacific Ocean. The immediate surrounding land uses are single family and low density multi-family to the north and south, light commercial to the east and south along Carisbad Boulevard, and the ocean to the west. Elevations on site range from sea level to approximately 54 feet above sea level. The western portion of the site is comprised of a coastal bluff, resulting in an elevation differential of approximately 30 feet between the ocean and the top of the bluff. From Ocean Street to the highest elevation on the site the elevation differential is approximately 15 feet. The Army and Navy Academy Master Plan covers redevelopment, relocation, and renovation of existing land uses and facilities on an existing and highly disturbed infill site. The campus contains a number of buildings and facilities surrounded by ornamental planting and lawn, and a large grass athletic field. Much of the project area has been disturbed by construction activities that have taken place since the first buildings on site were constructed in the 1920's. No native habitat exists on the site. The plan does not constitute the addition of major new land uses or a significant increase in the capacity of the school, therefore many of the environmental factors result in either 'no impact' or are not applicable due to the nature ofthe project. DISCLOSURE STATEMENT Applicant's statement or disclosure of certain ownership interests on all applications which will require discretionary action on the part of the City Council or any appointed Board, Commission or Committee. The following information MUST be disclosed at the time of application submittal. Your project cannot be reviewed until this information is completed. Please print. Note: Person is defmed as "Any individual, firm, co-partnership, joint venture, association, social club, fratemai organization, corporation, estate, trust, receiver, syndicate, in this and any other county, city and county, city municipality, district or other political subdivision or any other group or combination acting as a unit." Agents may sign this document; however, the legal name and entity of the applicant and property owner must be provided below. 1. APPLICANT (Not the applicant's agent) Provide the COMPLETE, LEGAL names and addresses of ALL persons having a fmancial interest in the application. If the applicant includes a corporation or partnership, include the names, title, addresses of all individuals owning more than 10% of the shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE INDICATE NON- APPLICABLE (N/A) IN THE SPACE BELOW If a publiclv-owned corporation, include the names, titles, and addresses of the corporate officers. (A separate page may be attached if necessary.) Person Neil Nydegger Corp/Part Non-Profit Corporation Title Chairman, Board of Trustees Armv and Naw Academv Address 2605 Carlsbad Boulevard Address Carlsbad, CA 92018 OWNER (Not the owner's agent) Provide the COMPLETE, LEGAL names and addresses of ALL persons having any ownership interest in the property involved. Also, provide the nature of the legal ownership (i.e, partnership, tenants in common, non-profit, corporation, etc.). If the ownership includes a corporation or partnership, include the names, title, addresses of all individuals owning more than 10% ofthe shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW. If a publicly- owned corporation, include the names, titles, and addresses of the corporate officers. (A separate page may be attached if necessary.) Person Neil Nydegger Title Chairman, Board of Trustees Army and Navy Academy Address 2605 Carlsbad Boulevard Carlsbad, CA 92018 Corp/Part Non-Profit Corporation Address 1635 Faraday Avenue • Carisbad, CA 92008-7314 • (760) 602-4600 • FAX (760) 602-8559 Wj) NON-PROFIT ORGANIZATION OR TRUST If any person identified pursuant to (1) or (2) above is a nonprofit organization or a trust, list the names and addresses of ANY person serving as an officer or director of the non-profit organization or as trustee or beneficiary of the. Non Profit/Trust Army and Navy Academy Title Please see attached sheet for Board of Trustees Address 2605 Carisbad Boulevard Carlsbad, CA 92018 Have you had more than $250 worth of business transacted with any member of City staff, Boards, Commissions, Committees and/or Council within the past twelve (12) months? • ves m No If yes, please indicate person(s):. NOTE: Attach additional sheets if necessary. certify that all the above information is true and correct to the best of my knowledge. Print or type name of owner Print or type name of applicant Signature of owng^/app Signature of owng^/applicant's agent if applicable/date Print or type name of owner/applicant's agent H:ADMIN\COUNTER\DISCLOSURE STATEMENT 5/98 Page 2 of 2 Citv of Carlsbad Planning Department HAZARDOUS WASTE AND SUBSTANCES STATEMENT Consultaiion Of Lists of Sites Related To Hazardous Wastes (Cenificaiion of Compliance with Govemmem Code Section oi9o2.51 Pursuant to State ofCalifornia Government Code Seclion 65962.5,1 have consulted the Hazardous Wastes and Substances Sites List compiled by the Califomia Environmental Protection .-\genc\ and hereby cenify that (check one): [Xj The development projeci and any aliemaiives proposed in this application are not contained on the lists compiled pursuanl to Section 65962.5 of the Slate Government Code. r~i The developmenl project and any alternatives proposed in this applicalion are contained on the lists compiled pursuant to Seclion 65962.5 of the State Govemment Code. .\PPL1CANT Name ^^^^^^ Planning Associates Address-Pasteur Court, Ste. 150 Cadsbad, CA 92008 Phone Number: (760)438-1465 PROPERTY OWTsHER iN'ame: \\t\\ rvl\|deaQ6rj C\\amm -Board 4 TfuSiiass Address: £(.05 Carlsbod ?>c>[i\t\jaf6 Phone Number: Address of Site 2605 Carlsbad Boulevard Local Agency (City and Counry): ^'^^ ^"""^^ ^'^^^ Assessor's book, page, and parcel number: ZOyoiO-ilo^ 203 -02-5 -oi^ 2D3-oHl-0Z^ 203-o43-O^. 2D3-05I-Q3 203-052-01, 20:^-osz-o2-, 203-053-01, 203-Ita-Ob^ 203-141-02 Specify iist(s): 2Q5 • i^l -2-3 Regulatory Identification Number:. Date of List: Apphcant Signaturq/paie Property Owner S)ign^;)ure/Date Admia'Coiuiier/'HuWasie 1635 Faraday Avenue • Carlsbad, CA 92008-7314 • (760) 602-4600 • FAX (760) 602-8559 @ ANA BOARD OF TRUSTEES Neil Nydegger - Chairman - Board of Trustees Nydegger & Associates 348 Olive Street San Diego, CA 92103 John E. Dobroth - Secretary - Board of Trustees Superior Court of California 800 South Victoria Avenue Ventura, CA 93009 William G. Gang - Treasurer - Board of Trustees Information Systems Laboratories, Inc. 10070 Barnes Canyon Road San Diego, CA 92121 Cynthia Hernandez-Cassano 508 Veneto Court El Dorado, CA 95762 Michael Frey Freyboy Tobacco 3012 S. Rancho Drive Las Vegas, NV 89102 Claude A. "Bud" Lewis 1200 Carlsbad Village Drive Carisbad, CA 92008 Jeff Manley Cresa Partners 610 Newport Center Dr. Ste. 500 Newport Beach, CA 92660 Dirk T. Metzger Silvermark Consulting 550 West "C" Street - Ste 700 San Diego, CA 92101 Warren L. "Bud" Metzger 4323 Wallace Road Santa Rosa, CA 95404 Rodolfo Nelson Nelson Group P.O. Box 1540 Calexico, CA 92231 Ron K. Smith P.O. Box 705 Del Mar, CA 92014 Joseph J. Strazzeri Strazzeri Mancini LLP 3655 Nobel Drive, Ste. 330 San Diego, CA 92122 Frank H. Whitton 2329 Masters Road Carlsbad, CA 92008 Ex Officio Stephen M. Bliss 2505 Ocean Street Carlsbad, CA 92008 Denis Anderson 2065 Meadowlark Ranch Lane San Marcos, CA 92069 Kathryn Jurgensen Premier Meetings 2151 Michelson Drive, Ste. 239 Irvine, CA 92612 George Fox III Studley, Inc. 1661 Page Mill Road Palo Alto, CA 94304 Kate Shuster (Mrs. Lew) 421 Bridoon Terrace Encinitas, CA 92024 • SUPPLEMENTAL APPLICATION FORM FOR ALL COASTAL DEVELOPMENT PERMITS • APPLICATION CHECKLIST FOR SINGLE FAMILY REGULAR & MINOR COASTAL DEVELOPMENT PERMITS (Application checklist for Non-Single Family Regular Coastal Development Pennits covered under separate handout) This supplemental application is to be filed for any development requiring a Coastal Development Permit issued by the City of Carlsbad. 1. GENERAL BACKGROUND A. Estimated Cost of Development: Development costing $60,000 or more does not qualify as a Minor Coastal Development Permit. The Planning Director shall make the final determination regarding a project's cost of development. The primary basis for determining cost of development will be the application of dollar costs per square foot for different types of residential construction. These costs are set by the International Conference of Building Officials (ICBO) and are applied throughout San Diego County. Please complete the following information to assist in the determination of this project's cost of development (Contractor proposals may also be submitted for consideration by the Planning Director). => New Residential Square Footage: square feet x $78.00/sq. ft. = N/A => Residential Addition Square Footage: square feet x $94.00/sq. ft. = N/A Any Garage Square Footage: square feet x $22.00/sq. ft. = N/A Residential Conversion Square Footage: square feet x $26.00/sq. ft. = N/A => For Non-Residential Uses, use the following figures for calculations: Retail/Store (g $38.00/sq. ft.; Restaurant @ $69.00/ sq. ft.; Qffice @ $55.00/ sq. ft.; Manufacturing/Warehouse @ $24.00/sq. ft.: square feet x $ 0 /sq. ft. = N/A COST OF DEVELOPMENT ESTIMATE: S N/A B. Do you wish to apply for: 1. A Minor Coastal Development Permit (Under $60,000) 2. A Regular Coastal Development Permit ($60,000 or more) X Form 15 1/01 Page lof 8 street address of proposed development 2605 Carlsbad Boulevard D. Assessor's Parcel Number of proposed development 203-010-16, 203-025-01. 203-041-02, 203-043-06. 203-051-03, 203-052-01. 203-052-02. 203-053-01, 203-142-06. 203-141-02. 203-141-23 Development Description: Conceptual master site plan forthe redevelopment, relocation, and renovation of existinq land uses and facilities on Armv and Navy Academv campus. Briefly describe project: See Attached Proiect Description Describe the present land uses (i.e. Vacant land, single family homes, apartments, offices, etc.) that surround the proposed development to the: North: Sinqle familv and multi-familv South: Sinqle familv and multi-familv: and liqht commercial alonq Carlsbad Boulevard East: Liqht Commercial alonq Carisbad Boulevard West: Ocean Is project located within a 100- year flood plain? PRESENT USE OF PROPERTY •Yes M No El Yes • No A. Are there existing structures on the property? Ifyes, please describe. Yes. Existinq campus facilities include classrooms, dormitories, administrative buildinqs. facilities manaqement buildinq. staff and faculty housinq. chapel, swimminq pool, tennis courts, athletic field and buildinqs. (Refer to Current Land Use Map). B. Will any existing structure be removed/demolished? [^Yes ^ No If yes to either question, describe the extent of the demolition or removal, including the relocation site, if applicable (also show on plans). III. LOT COVERAGE —Items A, B, & C are not applicable because the master plan is not proposing new buildings at this time. A. Existing and Proposed - N/A Existinq New Proposed Total Building Coverage Landscaped Area Hardscape Area Unimproved Area (Left Natural) _sq. ft. .sq. ft. .sq. ft. .sq. ft. New Proposed sq. ft. sq. ft. sq. ft. sq. ft. _sq. ft. .sq. ft. _sq. ft. .sq. ft. Form 15 1/01 Page 2 of 8 B. Parking: Number of existing spaces Number of new spaces proposed Existing/Proposed TOTAL: Number of total spaces required Number of covered spaces Number of uncovered spaces Number of standard spaces Number of compact spaces Is tandem parking existing? | | Yes # Q No Is tandem parking proposed? QYes # Q No Grade Alteration: Is any grading proposed? I I Yes I I No Ifyes, please complete the following: 1. Amount of cut cu.yds. 2. Amount of fill cu. yds. 3. Maximum height of fill slope feet 4. Maximum height of cut slope feet 5. Amount of import or export cu. yds. 6. Location of borrow or disposal site Form 15 1/01 Page 3 of 8 PLEASE NOTE: Time limits on the processing of discretionary projects established by state law do not start until a project application is deemed complete by the City. The City has 30 calendar days from the date of application submittal to determine whether an application is complete or incomplete. Within 30 days of submittal of this application you will receive a letter stating whether this application is complete or incomplete. If it is incomplete, the letter will state what is needed to make this application complete. When the application is complete, the processing period will start upon the date of the completion letter. Applicant Signature: / Staff Signature: Date: 2>/25/c4 • To be stapled with receipt to the application • Copy for file Form 20 city of Carlsbad 163 5 Faraday Avenue Carlsbad CA 92 008 Applicant: HOFMAN PLANNING & ENGINEERING Description Amount RP050004 181.86 2 605 CARLSBAD BL CBAD Receipt Nuinber: R0073252 Transaction ID: R0073252 Transaction Date: 01/13/2009 Pay Type Method Description Amount Payment Check 18305 181.86 Transaction Amount: 181.86 city of Carlsbad 163 5 Faraday Avenue Carlsbad CA 92008 Applicant: HOFMAN PLANNING & ENGINEERING Description Amount CDP05011 -510.00 2 605 CARLSBAD BL CBAD Receipt Number: R0073331 Transaction ID: R0073331 Transaction Date: 01/21/2009 Pay Type Method Description Amount Payment REFUND -510.00 Transaction Amount: -510.00 city of Carlsbad 163 5 Faraday Avenue Carlsbad CA 92 001 Applicant: HOFMAN PLANNING & ENGINEERING Description Amount RP050004 -73.92 2 605 CARLSBAD BL CBAD Receipt Number: R0073332 Transaction ID: R0073332 Transaction Date: 01/21/2009 Pay Type Method Description Amount Payment REFUND -73.92 Transaction Amount: -73.92 HI a City of Carlsbad 163 5 Faraday Avenue Carlsbad CA 92 00i (R0048863 ) Applicant: HOFMAN PLANNING ASSOCIATES Description Amount CDP05011 510.00 Receipt Number: R0048863 Transaction ID: R0048863 Transaction Date: 03/30/2005 Pay Type Method Description Amount Payment Check 6971 510.00 Transaction Amount: 510.00 city of Carlsbad 163 5 Faraday Avenue Carlsbad CA 92 0 08 (R0048862 ) Applicant: HOFMAN PLANNING ASSOCIATES Description Amount RP050004 3,590.00 Receipt Number: R0048862 Transaction ID: R0048862 Transaction Date: 03/30/2005 Pay Type Method Description Amount Payment Check 6971 3,590.00 Transaction Amount: 3,590.00 Army and Navy Academy Master Site Plan November 2008 ARMY AND NAVY ACADEMY MASTER SITE PLAN mm Prepared by: Hofman Planning & Engineering 3152 Lionshead Avenue Carlsbad, CA 92010 House & Dodge Design 1929 Hancocl< Street, Suite 200 San Diego, CA 92110 November 2008 Table of coiA.tei^t£ TABLE OF CONTENTS CHAPTER 1 : INTRODUCTION 1 I . Purpose 1 II. Location & Physical Description 1 III. History of the Army and Navy Academy 2 IV. Project Description 2 V. General Plan and Zoning 4 VI. Applications 4 A . Master Site Plan 4 B . Discretionary Applications 7 CHAPTER 2 : GOALS OF THE ARMY AND NAVY ACADEMY SITE PLAN 8 CHAPTER 3 : DEVELOPMENT STANDARDS & DESIGN GUIDELINES 10 I . General Development Standards 10 II . Parking Standards 10 A . Build Out Parking Requirements 10 III. Design Guidelines 12 IV. Landscape Guidelines 12 V . Miscellaneous Items 12 CHAPTER 4 : PLANNING AREAS 13 I. Planning Area A 13 A . Baseline Conditions (April 2008) 13 B . General Plan and Zoning 14 C .Master Site Plan 14 D .Vision and Goals 15 E . Discretionary Permits Required for Development 15 II. Planning Area B 16 A .Baseline Conditions (April 2008) 16 B .General Plan and Zoning 16 C .Master Site Plan 16 D .Vision and Goals 16 E . Discretionary Permits Required for Development 16 III. Planning Area C 17 A . Baseline Conditions (April 2008) 17 B .General Plan and Zoning 17 C .Master Site Plan 17 D .Vision and Goals 17 E . Discretionary Permits Required for Approval 17 IV. Planning Area D 18 A . Baseline Conditions (April 2008) 18 B .General Plan and Zoning 18 C .Master Site Plan 18 D .Vision and Goals 18 E . Discretionary Permits Required for Approval 18 V . Planning Area E 19 Ari^y i^p^d Ncivy Accidei^y Mc^ster site PLt^iA. i Novein4.ber^, 200S 77?^/^ of CoyiteiA±£ A .Baseline Conditions (April 2008) 19 B .General Plan and Zoning 19 C .Master Site Plan 19 D .Vision and Goals 19 E . Discretionary Permits Required for Development 19 VI. Planning Area F 20 A . Existing Conditions (April 2008) 20 B . General Plan and Zoning 20 C .Master Site Plan 20 D .Implementation of Vision and Goals 20 E . Discretionary Permits Required for Development 20 CHAPTER 5 : MASTER SITE PLAN DEVELOPMENT PHASING 21 I . Phasing Parking Requirements 21 II. Facility Improvements 22 A. Streets 22 B. Sewer and Water 23 C. Drainage 23 D. Overiiead Utilities 23 III. Required Entitlements 24 A .Applications within the Redevelopment Area (Planning Areas A, D, & E) 24 B .Applications outside ofthe Redevelopment Area (Planning Area B, C, & F) 25 IV . Phasing Administration 27 CHAPTER 6 : APPENDICES 28 I. Legal Description 28 AYW^Y^ av^d. Nt^vbj Aoadev\Ai^ Master site PLC^IA. ii November 3', zoos' l/itroduatLoiA. CHAPTER 1 : INTRODUCTION Purpose The purpose of the Army and Navy Academy Master Site Plan is to develop a conceptual site plan to be used as a guide for future development. The accompanying text provides a description of the Plan, the goals of the Army and Navy Academy and the approval process for subsequent entitlements. The purpose of the Master Site Plan and the accompanying exhibits is to provide sufficient information to evaluate the Master Site Plan concept. The exhibit is conceptual in nature and provided solely to indicate general location, amount and type of development, potential access points, circulation and the proposed development scheme for the Army and Navy Academy. The detailed design of individual buildings will be reviewed at the time of subsequent Redevelopment Permits or Site Development Plans to ensure that they are in conformance with the design criteria of the Army and Navy Master Site Plan and all other applicable City ordinances and policies. The Master Site Plan is not a Master Plan per the Carisbad Municipal Code and therefore does not contain its own development standards. The applicable development standards are found in the underlying zoning as contained in the Village Redevelopment Master Plan, Title 21 (Zoning ordinance) and the Local Coastal Program. Location & Physical Description The Army and Navy Academy Master Site Plan covers approximately 16 acres and is located within the northwest quadrant of the City of Carisbad in San Diego County. The site is north of Carisbad Village Drive and south of Buena Vista Lagoon with Carisbad Boulevard passing through the property. Specifically, the site is bounded on the north by Pacific Avenue, on the east by the San Diego Northern Railroad (SDNR), on the south generally by Cypress Avenue (though portions of the site are situated south of and adjacent to Cypress Avenue) and on the west by the Pacific Ocean. The immediate surrounding land uses are single family and multi-family to the north and south, light commercial to the east and south along Carisbad Boulevard, and the Pacific Ocean to the west. Elevations on site range from sea level to approximately 54 feet above sea level. The western portion of the site is comprised of a coastal bluff, resulting in an elevation differential of approximately 30 feet between the ocean and the top of the bluff. From Ocean Street to the highest elevation on the site the elevation differential is approximately 15 feet. The campus contains a number of buildings and facilities surrounded by ornamental planting and lawn, and a large grass athletic field. No native habitat exists on the site. Arioiy c?iA.d Ni^Vb) Academ.y Master site PLi^iA. 1 November^, 200^ I Introductioii III. History of the Army and Navy Academy The Army and Navy Academy was initially founded in 1910 as a private, non-profit military school. The Academy's academic, extracurricular and leadership programs were developed to create a well-rounded learning experience that develops honor, discipline and integrity. The Academy was established in its current location in Carisbad, CA in 1936. The Academy owns all its property by virtue of a bequest from a benefactor who willed the land with a conditional use stipulation that the Academy operate as a non-profit educational institution governed by a board of trustees. At the Academy, cadets cultivate responsible leadership skills preparing them for a lifetime of achievement. The educational program is built on three distinct goals: academic achievement, physical development and character development. For almost a century, the Academy has been a springboard for success in the lives of its cadets. Alumni career paths are wide-ranging, and graduates are particulariy well represented in the fields of business, law, medicine, education and government. IV. Project Description Baseline Conditions (April 2008) The Army and Navy Academy is situated on approximately 16 acres and consists of ten parcels. The largest parcel, which is 7.18 acres, contains the majority ofthe school facilities including classrooms, dormitories, a swimming pool, administrative buildings and a facilities management building. A 1.51 acre parcel located along Mountain View drive contains a parking area, tennis courts and staff housing. A 1.44 acre parcel located west of Ocean Street contains the school president's residence, a recreation hall and storage, and the chapel. Three parcels totaling approximately 1.05 acres located south of Cypress Avenue contain the senior lounge, library, staff housing, science building and faculty housing. The remaining four parcels, totaling approximately 5.12 acres, are located east of Carisbad Boulevard and contain an athletic field and an athletics building. There are a total of 29 buildings on campus serving approximately 340 students (316 boarding and 28 non- boarding students). Many of the older buildings on campus carry the eariy Colonial Spanish design heritage of North San Diego County. The Academy's location on the Southern California coast provides year round outdoor activities as well as a scenic backdrop for visits by friends and family. Exhibit 2 on page 3 depicts the baseline site plan. A majority of the academic, support and student housing facilities are antiquated. Some of these facilities are in need of replacement, while others require significant and costly renovation. The Academy has approximately $4.1 million in deferred maintenance and significant daily maintenance requirements generated as a result of facility age and intensive year round use. Ari^y i^iA.d Navy Academ,y Mc^ster site PLaiA. 2 Nover^berS', 200S lyitroductloiA. Master Site Plan The Army and Navy Academy Master Site Plan is depicted in Exhibit 3 on page 5. The objective of the Army and Navy Academy is threefold: to provide academic buildings, dormitories and support facilities that enhance the education and experience of the cadets; increase boarding student enrollment to 440 (315 high school and 85 middle school) students; and provide residential facilities to accommodate the onsite housing needs of faculty and support staff. Adequate facilities for dormitories, kitchens, dining and medical facilities are imperative to enhance student living accommodations as well as gain parental support and student registration. Technologically advanced classrooms enhance student learning and preparation for college. The athletic facilities provided in the Master Site Plan support athletic pursuits (organized and recreational) and enhance student physical conditioning. As the Academy is a residential boarding school, it is essential to provide residential and educational facilities that augment the student's experience and provide peace of mind for parents. The mission of the Army and Navy Academy is to be the premier military college preparatory school in the United States and to attain international recognition as a premier boarding school for young men. There are only 8 other comparable military academies in the United States today. V. General Plan and Zoning The General Plan and Zoning designations of the Army & Navy Academy Master Site Plan are shown on Exhibit 4 on page 6. The General Plan designations include: V (Village), RMH (Residential Medium High), P (Private School) and OS (Open Space). The corresponding zoning designations are V-R (Village Redevelopment), R-3 (Multiple- Family Residential), OS (Open Space) and BAOZ (Beach Area Overiay Zone). VI. Applications A. Master Site Plan The Master Site Plan is defined by the following permits: Redevelopment Permit (RP 05-04) - The majority of the project is in the Redevelopment Area, and as a result, an application for a Major Redevelopment Permit has been filed. Conditional Use Permit Amendment (CUP 94-02x1 A)- A portion of the Army and Navy Academy is located outside of the Redevelopment Area and in R-3 zoning district. A conditional use permit already exists for the site due to the school use in the R-3 zone. Therefore, a conditional use permit amendment is required with this submittal. ArkRy aiA,d Navy Academ^y Master site PLaiA, 4 NovemA,ber 3'. 200S RP05-04/CUP 94-02X1A EXISTING BUILDINGS rn FACILITIES MANAGEMENT m ACADEMIC BUILDING 400 HOOVER HAU nn ANDERSON HAa fsi McLENDON HAU m MclNTOSH HALL m ACADEMIC BUILDING 300 m LEWIS HAa m CREAN HALL Rol ATKINSON HAa rrn TAC COUNSELING CENTER nn OPERATIONS OFRCE 01] ACADEMIC BUILDING 1M [u] DAVIS HAa 1 ST FLOOR . AUDITORIUM/ GYM. 2ND FLOOR : EXECUTIVE OFFICES RFI ACADEMIC OFFICES Rsl BAND ROOM COTTAGE NO. 1 Rsl COMMANDANTS OFFICE Ril SUMMER PROGRAMS Hol COTTAGE NO. 3 rm COTTAGE NO. 4 COTTAGE NO 5 fal MILLER HAa MUSEUM rm COTTAGE NO. 6*7 [261 COMMAND* TAC rzTl BUSINESS OFRCE 1ST FLOOR: HEALTH CENTER 2ND FLOOR : WEST FEGAN rm DEVELOPMENT. ALUMNI AND ATHLETIC OFRCES Hol 1ST FLOOR: 2ND FLOOR: EAST FEGAN 1ST FLOOR: 2ND FLOOR: MESS HAa ADMISSIONS & PARENT AFFAIRS OFFICES TRANSPORTATION & HR (MOHAN HAa) rsi ACADEMIC BUILOING 500 rsi ACADEMIC BUILDING 800 rsi UBRARY rssi STAFF HOUSING r37l STAFF HOUSING rsi SCIENCE BUILDING rsi FACULTY APARTMENTS niol CHAPEL [TT] RECREATION HAa & STORE pel PRESIDENTS RESIDENCE rsi ATHLETIC FACILITY r**] STORAGE AREA [PT| EXISTING PARKING LOT Fi°l EXISTING PARKING LOT Fi^ EXISTING PARKING LOT Fi^l EXISTING PARKING LOT r?i1 EXISTING SPORT COURT LEGEND EXISTING PROPERTY UNE PROPOSED PROPERTY UNE EXISTING BUILDING EXISTING PARKING LOT ON SITE PARKING CAPACrrV DORMITORY CAPACrrY 83 REVISIONS: DGE Mark T. House John Dodge 2100 4.th Ave. Son Diego. CA 92101 e20os-2Qoe House & Dodge Detign, Inc. m • 00 Q > o S- < m if) < < < PREUMINARY NOT FOR CONSTRUCTION SCALE: 1"=60'-0" DATE: 11-05-08 BASELINE CONDITIONS (APRIL 2008) 2 RP 05 - 04/CDP 05^ 11/CUP 94 - 02X1A EXISTING BUILDINGS TO REMAIN 14 I DAVIS HALL 1ST FLOOR AUDnOKIUM/GYM. 2ND FLOOR CXCCUTIVE OFFICES NEW BUILDINGS / REMODEL ; A^ll NEW ADMISSIONS (i ADMINISTRATION BUILOING U-Zi NEW DINING HALL. COMMANDANTS OFFICE. OPERATIONS «, IT DEPARTMENT ;A-3i NEW CADET STORE iA^i RECREATION HALL - REMODELED [B-IJ NEWBRIDGE [tM' NEW DORMITORY (M' NEW DORMITORY I D-3 ANDERSON HALL . ADDITION / REMODEL loi CREAN HALL - ADDITION / REMODEL I E"^ NEW AUDITORIUM & MUSIC DEPARTMENT |E^" NEW ACADEMIC BUILDING |E-3 NEW ACADEMIC / LIBRARY BUILDING S WEST TOWER [E-£ ATKINSON HALL - REMODEL TO CLASSROOMS [E-^ NEW SCIENCE BUILDING |E:7 NEW OUTDOOR AMPHITHEATER [H^^ NEW STAFF HOUSING STAFF PARKING BELOW P-8 (18 SPACES) \H^2 : NEW STAFF HOUSING STAFF PARKING BELOW P-9 (18 SPACES) |M^! NEW MAINTENANCE FACILITIES BUILDING [P^y. PARKING LOT AT BLDG M-1 (3S1 SPACES) I P-2' PARKING LOT AT BLDG M-1 (8 SPACES) (M PARKING LOT AT BLDG. S-2 (lii SPACES) |p.4 PARKING LOT AT BLDG, A-1 (30 SPACES) I P-5: PARKING LOT AT BLDG E-1 (31 SPACES) (Pje' EXISTING PARKING LOT (P^ PARKING LOT AT BLDG. H-1 (6 SPACES) |P^ PARKING LOT AT BLDG. H-1 (18 SPACES) ' (PARKING AT GRADE. 2 STORY STAFF HOUSING ABOVE.) [M PARKING LOT AT BLDG. H-2 (18 SPACES) (PARKING AT GRADE. 1 STORY STAFF HOUSING ABOVE) [sT EXISTING SPORT COURT (S^ NEW ATHLETIC FACILITY •^S^A NEW SPORTS COURT - BASKETBALL [siir DAY STUDENT CENTER AT DAVIS HALL - REMODEL LEGEND EXISTING PROPERTY LINE PROPOSED PROPERTY LINE EXISTING TO REMAIN EXISTING TO BE REMODELED NEW CONSTRUCTION PARKING LOT LANDSCAPING / LAWN ON SITE PARKING CAPACITY GENERAL NOTES 1 ] BASIC BUILDING LOCATIONS WILL BE APPROVED WITH THIS PLAN. VARIATIONS TO EXACT BUILDING CONFIGURATION MAY OCCUR DURING SUBSEQUENT APPROVALS. 2) PROPOSED PHASING ORDER MAY CHANGE AS DETERMINED BY ARMY AND NAVY ACADEMY HOUSE '^DQDGE Mark T. House John Dodge 2100 4th Ave. San Dlego. CA 92101 ® 2(X)6 - 2008 House & Dodge Design, Inc I PRELIMINARY NOT FOR CONSTRUCTION SCALE. \' =e>c -O' DATE. o -o° -c& MAS'ER 3 RP-05-04/CUP 94-02X1A Hofman Planning & Engineering 3152 Lionstiead Avenue cadsbad, CA 92010 (760) 692-<100 LU Q <r • 00 Q O O > o ^ —' CM <<^" < < Q O CD ID _, ^ to < CM Q < PREUMINARY NOT FOR CONSTRUCTION SCALE: I = DATE: W/a^/Ob SENERAL PLAN & Z^t-JINKb 4 lintroductLom B. Future Discretionary Applications The Master Site Plan is conceptual in nature and provides a roadmap for the development of the campus. The construction and development of the buildings within the Master Site Plan concept will require additional applications and approvals. For ease of description, the entire site is broken into six planning areas based on the divisions created by existing streets as shown in Exhibit 4. A detailed discussion of the individual planning areas is provided in Chapter 4 of this document. The majority of the site is located in the Village Redevelopment Area with the exception of Planning Areas B, C and F. Buildings constructed within the Village Redevelopment Area are subject to an Administrative, Minor, or Major Redevelopment Permit depending on the valuation of the project. All processing requirements of the Village Redevelopment Plan shall be enforced for this area and are discussed in further detail in Chapter 5. The remaining portion of the site is located outside of the Village Redevelopment Area and is subject to Title 21 of the Carisbad Municipal Code. Processing of uses proposed in this area are governed by Title 21. A more detailed discussion of the required discretionary actions is contained in Chapter 5 of this document. The entire site is located in the Coastal Zone and therefore subject to the Carisbad Local Coastal Program. Development within the Coastal Zone is subject to a Coastal Development Permit. A more detailed discussion of the required discretionary actions is contained in Chapter 5 of this document. Aria^y aiA,d Navy Academ,y Master SLte PLaiA. 7 NoventberS', ZOOS <^oai£ oftheArriAij aiA^d Navij Aoademij Master PLaiA. CHAPTER 2 : GOALS OF THE ARMY & NAVY ACADEMY SITE PLAN The Army and Navy Academy has established goals that will guide the development of the Master Site Plan over the implementation period. All land within the Master Site Plan area is envisioned to be developed consistent with the following goals: 1. Provide facilities to help realize the Academy's IVIission. The Master Site Plan provides for state-of-the-art computer labs, smart classrooms, and improved modern athletic amenities to enable cadets to excel in academic activities as well wellness and fitness activities. In addition to academics and athletics, the Academy must provide adequate housing options for all students. The Master Site Plan lays the groundwork for the Academy to upgrade and expand the current student housing to accommodate the recruitment needs of the Academy. All planning should build and sustain upon the Academy's reputation for excellence in the civilian/military community. The Army and Navy Academy has a well established reputation as a school built to develop scholarship and honorable character in young men and to motivate them to realize their potential. The Master Site Plan will increase recognition in the value of the Academy while enhancing working relationships between the military and the civilian academic community. 3. The Academy campus should be designed so that administration, educational, residential, support facilities, and other activities are within easy walking distance of each other. The Army and Navy Academy dedicates itself to providing a comprehensive education in a safe and structured environment. This Master Site Plan is designed so that the facilities that are essential to the daily life of the cadets are part of an integrated community to serve their needs. 4. The character of the Academy should be consistent with the surrounding community. This Master Site Plan is designed to ensure that the Academy's future development is consistent with the existing surroundings and builds upon the Academy's attractive location next to the Pacific Ocean. Arm.y aiA.d Navy Academ,y Master site PLat^. 8 Noveruber^, 200S <::::^oaLs oftheArmij a/id NaVLj Academij Master PLaiA. 5. All planning should include design characteristics that will attract people to the Academy. This Master Site Plan aims to pursue award-winning design standards to encourage recruitment and recognition of the Academy nation-wide. The Plan will maintain an environment where the core values of the Academy are continuously demonstrated. 6. The Academy should help conserve resources and minimize waste. Drought tolerant landscaping will be utilized as much as possible in accordance with the recommendations of Carisbad's Landscape Manual. Whenever feasible, equipment and outside furniture should be constructed from recycled materials. ArKi^y aiA.d Navy Acac^ei^y Master site PLaiA. 9 November3, soos t>eveioj^nteiA.t .stayidards § i^eslgiA^ c::iuldeLiMs CHAPTER 3 : DEVELOPMENT STANDARDS & DESIGN GUIDELINES The primary goal of the Army and Navy Master Site Plan is to create a modernized facility that meets the needs of the students and staff, and blends with the character of the surrounding neighborhood. The following standards and guidelines will help achieve this goal. I. General Development Standards All development shall comply with the requirements of the underiying zoning as shown by Exhibit 4 and described in the Carisbad Village Master Plan and Design Manual and Title 21 of the Carisbad Municipal Code. These zoning designations are V-R (Village Redevelopment), R-3 (Multiple-Family Residential), OS (Open Space) and BAOZ (Beach Overiay Zone). Development standards may be modified as allowed by Carisbad Village Master Plan and Design Manual and Carisbad Municipal Code 21.42.140; 21.06.090. II. Parking Standards Because of the unique nature of the use and its location being both within the Village Redevelopment area and the R-3 zone, a modification to the parking standards has been allowed by CUP 94-02x1 A pursuant to Title 21.42.140 (A)(4) and standards modification through the Carisbad Village Master Plan and Design Manual. The CUP only applies to Planning Areas B, C, and F. The majority of the site is within Village Redevelopment (VR) and subject to a Redevelopment Permit (RP). However, it is the combination RP/CUP that can modify the standards and allow the parking to spread out somewhere within the boundaries of the Army and Navy Academy. The findings required for allowing a modification of the underiying parking requirement are described below. A. Build Out Parking Requirements An exemption to the parking standard is allowed for the Army and Navy Academy due to the specialized nature of the site. The Conditional Use Permit ties the project together and creates a standard that addresses the actual parking needs of the Academy. This standard is based on the following components. The Army and Navy Academy is a boarding school and on campus students are not allowed to have a car. The only exception to this rule is a select few seniors during the last two months of school. A number of requirements for obtaining this two month senior privilege, including grades, have historically limited this number to 2-3 students. However, there is the potential that day cadets of driving age will drive to school and will require parking. Therefore, based on the policy that on-campus students do not drive to school and cannot have a car on-campus, parking will be required at a ratio of: • 1 space per employee • 1 space per day cadet of driving age At such time that boarding cadets are permitted to keep a car on campus, then the requirement for onsite parking stalls will be adjusted accordingly to accommodate the demand and those parking stalls must be provided on campus. The development of this requirement is based on the following assumptions: • Historically, approximately 10% of the students at the Academy are day cadets Arm,y aiA.(7( Navy AoadeiA^y Master Site PLaiA. 10 Novembers', 200S T^eveLopmeint .stayidards § Deslgi/i <^uL-deUines Of the day cadets, approximately one third are of driving age The faculty apartments will meet the following requirements: • 2 spaces per unit for 2 bedroom or more • 1.5 spaces per unit for studio or 1 bedroom • Guest parking wili be provided at 0.5 spaces per unit through 10 and .25 spaces over 10 units The last element to address in the development of the modified parking standard for the Army and Navy Academy is the issue of double counting. At build out, there will be 37 staff members that will live in the 37 faculty/staff apartments and work on campus. Based on the above requirements, parking spaces would be counted for those staff members as employees as well as residents, therefore double counting the actual parking demand for these staff members. To eliminate this redundancy, 37 parking spaces will be subtracted from the total required spaces. Therefore, the modified parking standard for the Academy shall be 171 spaces. The following table provides a breakdown ofthe parking requirements. Table 1: Build Out Parking Requirements Notes: ^ Based on parking policy, historical data and build out student population of 440. Assumes 10% of student population are day cadets and 1/3 of that 10% are of driving age ^Faculty/Staff that live on campus are double counted as employees and as residents of staff housing. Therefore the number of employees that live on campus will be subtracted from the total to adjust for the double count. BUILD OUT PARKING REQUIREMENTS SCHOOL Employees 1 space/employee X 116 employees = 116 Spaces space/day cadet of day cadets of Students^ 1 driving age X 15 driving age 15 Spaces HOUSING Staff Units 2 bedroom 2 spaces/unit X 18 units 36 Spaces 1 bedroom 1.5 spaces/unit X 19 units 28.5 Spaces space for each unit up Guest Parking 0.5 through ten units. X 10 units 5 Spaces space for each unit in 0.3 excess of ten units. X 27 units 6.75 Spaces Subtotal 207.25 Spaces Adjust for double count^ 37 Spaces 170.25 Spaces TOTAL PARKING REQUIRED 171 Spaces Ari/M,y C{\A.d Navy AcadekVLy Master site PLaiA. 11 Novembers, 200S III. Design Guidelines The Army and Navy Academy Master Site Plan Design Guidelines create a cohesive architectural theme throughout the campus. The following design guidelines will be considered when implementing the Master Site Plan: • Architecture should blend with buildings to be retained on site. • All development shall have a strong relationship to the street. • Buildings shall be enriched with architectural features and details. • Landscaping shall be an important component of the architectural design. • Provide benches and low walls along public pedestrian frontages. • Minimize privacy loss to adjacent residential uses. • Provide landscaping within surface parking lots. • Utilize simple building forms. • Avoid flat roofs and mansard roof forms. • Screen mechanical equipment from public view. • Design visual interest into all sides of buildings. • Respect the materials and character of adjacent development. • Utilize light and neutral base colors. • Distinctive entry statements shall be provided at the major entry points to the Academy. • Buildings and/or building designs which are deemed to have significant historical and/or design character to the community shall be preserved and/or recreated to the extent feasible. IV. Landscape Guidelines Landscaping of the Army and Navy Academy campus will be consistent with the City of Carisbad Landscape Manual. V. Miscellaneous Items No outdoor storage of materials shall occur onsite unless required by the Fire Chief. When so required, the Academy shall submit and obtain approval of the Fire Chief and the Redevelopment Director of an outdoor storage plan and, thereafter, comply with the approved plan. PLa^Min0 Areas. CHAPTER 4 : PLANNING AREAS The entire site is divided into six Planning Areas for descriptive purposes. These planning areas are illustrated in Exhibit 4 on page 6. The following is a discussion of the baseline conditions and development plan for the individual planning areas. The Master Site Plan provides an approximate range for building square footage. Development of the site will occur over a span of many years and the building square footage may increase or decrease based on future demands required by the Army and Navy Academy. Therefore, finalized square footages will be established through subsequent approvals. The Master Site Plan identifies staff and faculty housing as a key component of the Army and Navy Academy campus. The intent of the Master Site Plan is to provide a total of 37 staff/faculty units on campus. This represents the desired number of on-site faculty housing for an ultimate school enrollment of 440 students. The overall goal of the Army and Navy Academy is to be able to provide affordable on-site housing to attract the best faculty available. Ten Tactical Officers (TAC) apartments will be incorporated within the student dormitory buildings on the main campus for supervision purposes. Faculty housing is provided in Planning Areas C and D, adding up to an additional 27 units. As with the other campus buildings, the specific design of the staff/faculty housing will be established through subsequent approvals, but the intent of the Master Site Plan is to ensure adequate staff housing in these locations on the Army and Navy Academy property. I. Planning Area A Planning Area A is located in the center of the project area and is the largest of the six planning areas in the Master Site Plan with a gross area of 7.2 acres. It contains the majority of the Army and Navy Academy facilities including academic buildings, administration offices and student housing. A. Baseline Conditions (April 2008) The bulk of the educational and administrative facilities on the campus are located in Planning Area A. Existing facilities include classrooms, academic offices, the mess hall, facilities management building, business offices, and other administrative departments. Near the middle of this planning area is Davis Hall, which contains the school's auditorium and gymnasium on the first floor and executive offices on the second floor. The school museum is located adjacent to Carisbad Boulevard. All of the dormitory space on campus is located in Planning Area A. Crean Hall is situated in the southwest corner of the site and provides 64 beds. To the north is Atkinson Hall, a two-story building which currently contains 32 beds. Lewis and Mcintosh Hall, adjacent to corner of Ocean Street and Pacific Street, each contain 16 beds, while McClendon and Hoover Hall each house 18 beds. Anderson Hall is a two-story, 80 bed dormitory located along Pacific Street. The upper floor of West Fegan accommodates 12 beds. In addition to the dormitories, there are also a number of cottages dedicated to cadet housing that add an additional 48 beds. ArnA.y aiA,(?( Navy Academy Master site PLaiA, 13 Novembers 200s PLaintA.iiA.0 Areas B. General Plan and Zoning General Plan Land Use: Zoning: V (Village) V-R (Village Redevelopment) Master Site Plan Planning Area A remains the heart of the Army & Navy Academy Campus, description of the plan is included below. A brief This Master Site Plan includes the construction of four education buildings within the planning area including classrooms, a science building, auditorium and library. The plan also includes the remodeling of Atkinson Hall into classrooms and the construction of an amphitheater outside the auditorium and music department. In addition to the educational facilities, the Master Site Plan provides for administration buildings, a dining facility and cadet store. Athletic facilities within the planning area include locker rooms and a basketball court located adjacent to the existing pool. Planning Area A continues to contain all of the dormitory rooms on campus. The plan includes the construction of two dormitory buildings adjacent to Anderson Hall, each providing 90 beds and two Tactical Officers (TAC) apartments. Anderson Hall will be remodeled to accommodate 160 beds and four TAC officer apartments. Crean Hall will also be renovated to accommodate 90 beds and two TAC officer apartments. At build out, the dormitories will provide a total of 430 beds and 10 TAC apartments. Table 1 provides a summary of the plan for Planning Area A. Table 2: Development Plan for Planning Area A BIdg. Approx. No. Building Name Stories Footprint Approx. S.F. Range * A-1 Admissions & Administration Building 2 4,199 8,398 10,078 A-2 Dining Hall, Commandant's, Operations & IT Dept. 2 10,586 21,172 25,406 A-3 Cadet Store 1 1,688 1,688 2,026 A-5 Health Center at Remodeled Davis Hall 1 1,908 1,908 2,290 B-1 Bridge -1,595 1,595 1,595 D-1 Dormitory 2 6,689 13,378 16,054 D-2 Dormitory 2 6,689 13,378 16,054 D-3 Anderson Hall 2 12,910 25,820 30,984 D-4 Crean Hall 2 6,884 13,766 16,522 E-1 Auditorium (500 seats) & Music Department 1 5,730 5,730 6,876 E-2 Academic Building 2 8,679 17,358 20,830 E-3 Academic / Library Building & West Tower 2 5,737 11,474 13,769 E-4 Atkinson Hall - Remodel to Classrooms 2 4,050 8,100 9,720 E-5 Science Building 1 6,973 6,973 8,368 E-7 Amphitheater 1 5,088 5,088 6,106 S-3 Pool Locker Rooms and Bleachers 1 1,147 1,147 1,376 S-4 Sports Court - Basketball 1 4,331 4,331 5,197 S-5 Day Student Center at Davis Hall - Partial Remodel 1 5,181 5,181 6,217 14 Davis Hall - Existing 1 11,779 11,779 15,614 111,843 178,264 215,080 * Note: Building areas are approximated and may increase or decrease based on future demands required by the Army and Navy Academy. Finalized square footages will t>e established through subsequent approvals. Arkviy aiA.d Navy Academ,y Master site PlaiA. 14 November S 200g PiaiA.yiLtA.0 Areas Vision and Goals The purpose of this planning area, including its design standards and allowed uses, is to provide updated facilities that will modernize the campus (Goal 1). A state-of- the-art computer lab will offer approximately 30 modern workstations for use by Academy cadets. These facilities will provide cadets the opportunity of optimizing the most current technology to suit their needs within the community of the Academy (Goal 3). Modern, innovative technological facilities will attract members and ensure that the Academy is recognized as a nation-wide leader in providing the most advanced technology to its cadets (Goal 5). The goals of the Master Site Plan will also be realized with the construction of new dormitories to house the increased population of new cadets in the future (Goal 1). New facilities will be located based on the needs to the students and staff (Goal 3). Discretionary Permits Required for Development All development proposals shall be processed in conformance with the requirements ofthe Carisbad Municipal Code as detailed in Chapter 5 ofthis Master Site Plan. Arm.y aiA,d Navy Academ,y Master site PLa^v 15 November S 200S Piani^iiA^g Areas II. Planning Area B Planning Area B is located along the western edge of the Master Site Plan, bordered by Ocean Street to the east and the Pacific Ocean to the west. The area is approximately 1.44 acres and is situated outside of the Redevelopment boundaries. A. Baseline Conditions (April 2008) Facilities in this planning area include the chapel, recreational hall and cadet store. Planning Area B also contains the school president's residence. B. General Plan and Zoning General Plan Land Use: P (Private School) and QS (Open Space) Zoning: R-3 (Multiple-Family Residential), QS (Open Space), BAO (Beach Area Overiay) C. Master Site Plan The chapel and the president's residence are designated to remain in their current location. The Master Site Plan includes the remodeling of the Recreation Hall to provide more up to date facilities for the cadets. Recreational activities are planned for the beachfront property owned by the Academy. Table 2 provides a summary of the development plans for the area. Table 3: Development Plan for Planning Area B BIdg. No. Building Name Stories Approx. Footprint Approx. S.F. Range * A-4 Recreation Hall 1 8,248 8,248 9,898 40 Chapel 1 5,906 5,906 5,906 42 President's Residence 2 4,652 4,652 4,652 18,806 18,806 20,456 * Note: Building areas are approximated and may increase or decrease based on future demands required by the Army and Navy Academy. Finalized square footages will be established through subsequent approvals. D. Vision and Goals The purpose of this planning area, including its design standards and allowed uses, is to best utilize the property along the Pacific Ocean (Goal 4). The private beachfront and multi purpose building located in this area offers cadets the opportunity to enjoy a variety of recreational activities to suit their leisure needs within the community of the Academy (Goal 3). Providing and modernizing these types of facilities helps implement the Academy's vision of offering its cadets a comprehensive education (Goal 1). E. Discretionary Permits Required for Development All development proposals shall be processed in conformance with the requirements of the Carisbad Municipal Code as detailed in Chapter 5 of this Master Site Plan. Arm,y avx^d Navy Acadekuy Master Site PLaiA-16 November S 200S PiaiA,tA.iiA.g Areas III. Planning Area C Planning Area C is located south of Cypress Avenue, east of Ocean Street, west Garfield Street. One of the smaller planning areas with a gross area of 0.53 acres. Planning Area C is home to academic and staff housing facilities. A. Baseline Conditions (April 2008) Faculty apartments, a single family staff residence and a science building are currently located in Planning Area C. This planning area lies outside the boundaries of the Redevelopment Area. B. General Plan and Zoning C. General Plan Land Use: Zoning: Master Site Plan RMH (Residential Medium High) R-3 (Multiple-Family Residential) and BAO (Beach Area Overiay) A staff housing building replaces the science building and faculty apartments. This staff housing provides up to a maximum of 12 units for Academy staff. Below in Table 3 is a summary ofthe plan: Table 4: Development Plan for Planning Area C BIdg. No. Building Name stories Footprint Approx. S.F. Range * H-2 Staff Housing 2 2,921 5,842 7,010 2,921 5,842 7,010 * Note: Building areas are approximated and may increase or decrease based on future demands required by the Army and Navy Academy. Finalized square footages will be established through subsequent approvals. D. Vision and Goals The purpose of this planning area, including its design standards and allowed uses, is to provide updated facilities that will modernize the campus (Goal 1). Improved facilities will attract new cadets and increase recognition of the Academy outside of the community (Goal 5). Updated facilities will also help realize Goal 6 by conserving natural resources. E. Discretionary Permits Required for Approval All subsequent development proposals shall be processed in conformance with the requirements of the Carisbad Municipal Code as detailed in Chapter 5 of this Master Site Plan. Arm.y aad Navy Acadei^y Master site Pla IA. 17 November s, 200^ PLanMiA,g Areas IV. Planning Area D Planning Area D is located south of Cypress Avenue and east of Garfield Street. With a gross area of 0.52 acres, Planning Area C is the smallest of the six planning areas. A. Baseline Conditions (April 2008) Planning Area D lies within the Village Redevelopment area and contains the school library, senior lounge and staff housing. B. General Plan and Zoning General Plan Land Use: Zoning: V (Village) V-R (Village Redevelopment) C. Master Site Plan A staff housing building replaces the library, senior lounge and staff apartments, providing up to a maximum of 15 units for Academy staff. Below in Table 4 is a summary of the plan: Table 5: Development Plan for Planning Area D BIdg. No. Building Name Stories H-1 Staff Housing Approx. Footprint Approx. S.F. Range 3,364 10,092 12,110 3,364 10,092 12,110 Note: Building areas are approximated and may increase or decrease based on future demands required by the Army and Navy Academy. Finalized square footages will be established through subsequent approvals. D. Vision and Goals The purpose of this planning area, including its design standards and allowed uses, is to provide updated facilities that will modernize the campus (Goal 1). Improved facilities will attract new cadets and increase recognition of the Academy outside of the community (Goal 5). Updated facilities will also help realize Goal 6 by conserving natural resources. Discretionary Permits Required for Approval All subsequent development proposals shall be processed in conformance with the requirements of the Carisbad Municipal Code as detailed in Chapter 5 of this Master Site Plan. Arku.y aiA.d Navy Acade^Ky Master site PLauv 18 Novembers 200^ PLatA.iA.LiA.0 Areas V. Planning Area E Planning Area E has a gross area of 5.12 acres and is located east of Carisbad Boulevard, west of the Buriington Northern Santa Fe railroad tracks, and north of Beech Avenue. Baseline Conditions (April 2008) Home to the Academy's athletic facilities, this planning area contains the football and baseball field. A storage area is situated on the eastern edge of the planning area, adjacent to Beech Avenue. This Planning Area is separated from the rest of the Academy by Carisbad Boulevard, a four lane, major arterial. B. General Plan and Zoning General Plan Land Use: Zoning: V (Village) V-R (Village Redevelopment) Master Site Plan Planning Area E remains a focal point for the Academy's athletic facilities. The Master Site Plan includes the construction of an Athletic Center on the north end of the parcel adjacent to the field. A bridge over Carisbad Boulevard connects the Athletic Center with the main campus. A parking lot is provided at the northwest corner of the Athletic Center. The Maintenance Facilities Building and parking is designated for the south end of the field. The development in Planning Area E is listed below in Table 5. Table 6: Deveiopment Plan for Planning Area E BIdg. No. Building Name Stories Approx. Footprint * Approx. S.F. Range * M-1 Maintenance Facilities Building 1 3,457 3,457 4,148 S-2 Athletic Building and East Tower 2 9,594 19,188 23,026 13,051 22,645 27,174 * Note: Building areas are approximated and may increase or decrease based on future demands required by the Army and Navy Academy. Finalized square footages will be established through subsequent approvals. D. Vision and Goals The purpose of this planning area, including its design standards and allowed uses, is to build upon the unique athletic environment offered by the Academy. Improved, modern, athletic amenities that allow for a variety of fitness activities will help realize the Academy's core mission of motivating young men to realize their full potential, and assist in implementing Goal 1 of this Master Site Plan. Goal 3 of this Plan can also be accomplished with the addition of an improved pedestrian walkway that will better link the main campus to these facilities. E. Discretionary Permits Required for Development All subsequent development proposals shall be processed in conformance with the requirements of the Carisbad Municipal Code as detailed in Chapter 5 of this Master Site Plan. Ari^^y aiA-d Navy Acadei^y Master site PLaiA. 19 November s, 200^ PLaiA,iA.ln0 Areas VI. Planning Area F Planning Area F is located northeast of Mountain View Drive and west of Carisbad Boulevard. Planning Area F has a gross area of 1.51 acres and lies outside the limits ofthe Village Redevelopment area. A. Existing Conditions (April 2008) Planning Area F contains additional athletic facilities for the cadets including the school tennis courts, rifle range and a roller hockey rink. A parking lot is also situated in this area providing 28 spaces. B. General Plan and Zoning General Plan Land Use: Zoning: RMH (Residential Medium High) R-3 (Multiple-Family Residential) and BAO (Beach Area Overiay) Master Site Plan The tennis courts remain alongside the roller hockey rink. The parking lot is located adjacent to the hockey rink providing 28 parking spaces. The following table provides an overview of the plan for Planning Area F. Table 7: Development Plan for Planning Area F BIdg. No. Building Name Stories Approx. Footprint Approx. S.F. Range * S-1 Sports Court - Roller Hockey Rink 1 10,942 10,942 10,942 Tennis Courts 1 10,942 10,942 10,942 * Note: Building areas are approximated and may increase or decrease based on future demands required by the Army and Navy Academy. Finalized square footages will be established through subsequent approvals. Implementation of Vision and Goals The purpose of this planning area, including its design standards and allowed uses, is to provide updated facilities that will modernize the campus (Goal 1). Improved parking structures can open space for additional facilities such as recreational or athletic facilities in this area. Discretionary Permits Required for Development All subsequent development proposals shall be processed in conformance with the requirements of the Carisbad Municipal Code as detailed in Chapter 5 of this Master Site Plan. Arm,y aiA^d Navy Atadtw^y^ Master site PLaiA, 20 November S 200^ PhasliA.0 Plan CHAPTER 5 : MASTER SITE PLAN DEVELOPMENT PHASING The Army and Navy Academy Master Site Plan is conceptual in nature, providing sufficient information to evaluate the Master Site Plan concept. The development of the campus will occur over a span of many years. The purpose of the plan is to guide future development based on the needs of the Academy. I. Phasing Parking Requirements Since the Master Site Plan will develop over a number of years, a measure needs to be established to determine parking requirements throughout the phasing process. An increase in parking demand will occur with increased dorm capacity and additional staff housing. For this reason, the development of dorm buildings and staff housing units will be evaluated against a threshold for increased parking demands during subsequent discretionary review. For the increased parking demand related to the construction of dorm buildings, a ratio is utilized that links the student increase based on dorm capacity to an increase in faculty and commandant employees. Based on existing standards, as well as the projected growth in students and faculty/commandants, there is a ratio of 5.8 students per faculty/commandant. Based on the net increase in bed capacity and this ratio, the increase in parking demand for each of the dorm building is as follows: Table 8. Increased Parking Demand New Dorm Building Total Beds at Build Out Requires Removal/Remodel of Beds Demolished Net Increase in Bed Capacity Increase in Parking Demand (spaces) D-1 90 McLendon Hall 18 72 12.4 D-2 90 Hoover Hall & Cottages 6 &7 26 64 11.0 D-3a 80 Existing Anderson 40 40 6.9 D-3b 80 Existing Anderson 40 40 6.9 D-4 90 Crean Hall & Atkinson Hall 96 -6 -1.0 The first phase of the Master Site Plan will be the construction of a parking lot off of Beech at the south end of the athletic fields. With the construction of this parking lot, a total of 122 parking spaces will be provided on campus. Therefore, there will be a surplus of 25 parking spaces per the baseline parking standard of 97 spaces as shown in Table 8. Table 9. Baseline Parking Demand Notes: ^ Based on parking policy, historical data and existing student population of 350. Assumes 10% of student population are day cadets and 1/3 of that 10% are of driving age ^Faculty/Staff that live on campus are double counted as employees and as residents of staff housing. Therefore the number of employees that currently live In staff houslng/apts will be subtracted from the total to adjust for the double count. BASELINE PARKING (per standard) Employees 1 space/employee x 94 employees = 94 Spaces Students^ 1 space/day cadet x of driving age day cadets of 11 driving age = 11 Spaces Subtotal Adjust for double count^ 105 Spaces 8 Spaces 97 Spaces TOTAL PARKING REQUIRED 97 Spaces Arm.y aiA-d Navy Academ.y Master site PLaiA. 21 Novembers 200S PhasLi^c) PLain The subsequent development of the dorm buildings will be evaluated based on this threshold of 25 spaces. Regardless of the order in which the dorms are developed, the increased parking demand created by that dorm will be evaluated against this threshold. For example, the development of D-1 and D-2 could occur prior to requiring additional parking as the increased parking demand ofthe two buildings would be 23 parking spaces. Once D-3 is developed, the parking demand will exceed the 25 spaces and additional parking would be required. The staff apartments will provide their required parking when constructed. II. Facility Improvements A. Streets The streets adjacent to the Army and Navy Academy and identified in the Master Site Plan include Beech Avenue (east of Carisbad Blvd.), Carisbad Blvd., Mountain View Drive, Pacific Street, Ocean Street, Garfield Street (south of Cypress Ave.), and Cypress Avenue. No street improvements are proposed in conjunction with the Master Site Plan. Five of the seven streets have been identified as alternative design streets and until the process is resolved through City Council action, the streets are proposed to remain in their current state in conformance with the approved Alternative Street Design Policy. Upon application for any development that may require street improvements, the alternative street design process will be initiated. In addition, street improvements to Beech Avenue east of Carisbad Blvd. shall be designed and improved concurrent with development on Beech Avenue, east of Carisbad Blvd. Similariy any development to the Army and Navy Academy Sports Field, Administration Buildings or frontage buildings shall include final design and improvement to the unimproved frontage of Carisbad Blvd. Widening ofthe Carisbad Blvd. Bridge at the Railroad crossing is beyond the scope of this project. Payment of Traffic Impact Fees shall be considered fair share contribution of the Carisbad Blvd/RR Bridge improvement requirement. STREET DEVELOPMENT STATUS Beech Avenue (east of Carisbad Blvd.) Concurrent W/Development Carisbad Blvd. Concurrent W/Development Mountain View Drive Alternative Street Pacific Street Alternative Street Ocean Street Alternative Street Garfield Street (south of Cypress Ave.) Alternative Street Cypress Avenue. Alternative Street AriA/i-y aiA.d Navy AcadenA,y Master site PLaiA. 22 Novembers, 200S Phasing Pian B. Sewer and Water At the discretion of the City Engineer, water and sewer studies shall be conducted prior to the issuance of any building permit that triggers the need for water. The study shall address both potable water lines and water lines needed for fire protection. The studies shall address the inventory, general capacity and on site utility needs for these services. The "backbone" system and alternative lateral pipe locations that would service future on site development shall be shown with the studies to avoid any piecemeal placement of lateral lines and to ensure that there will be sufficient capacity in the lines for the build out scenario of ANA. A phasing schedule will be provided showing trigger points when facilities must be constructed. The studies will be triggered with the first discretionary permit or building permit, whichever occurs first. Exempted from the need to provide these studies are parking lots, landscape improvements and tenant improvements that do not change the existing land use nor increase the EDU demand for either sewer or water. C. Drainage At the discretion of the City Engineer, a drainage study shall be conducted prior to any discretionary permit that would result in a change in surface water flow or that increased discharge of water. Tenant Improvements which do not change a buildings exterior configuration would be exempt along with building permits that create no impact to surface flows such as a fence. The intent of the drainage study is to determine methods to reduce the existing amount of drainage that impacts the surrounding streets and public drainage system. Such methods may include diverting water to other drainage basins, detention facilities and\or retention of the drainage water on site. The project shall be in compliance with the SUSMP and Low Impact Design (LID) standards in effect at the time of permit application D. Overhead Utilities Pursuant to the Carisbad Municipal Code and applicable standards, all overhead facilities that require relocation based on discretionary approval or building permit shall be included in a study that will address inventory and consider phasing of the utilities. The phasing of underground utilities will be allowed at the discretion of the City Engineer. The study will be triggered depending upon the location of the proposed development. Development on the interior campus that will result in conflicts with the overhead utilities shall provide a focused study concurrent with development. For Beech Avenue and Carlsbad Blvd, which are not alternative design streets, a focused study will also be initiated with development along those frontages. ArkRy aiA.d Navy Acadein^y Master site PLaiA. 23 November S, 200^ Phasing Plan The under-grounding of the remainder of overhead utilities may be determined through the Alternative Street Design process. If under-grounding is included in the Alternative Street Design process, a study shall be prepared with the first discretionary or building permit following the Alternative Street Design determination. Required Entitlements The Master Site Plan for the Army and Navy Academy was approved in 2008 and defined by a Redevelopment Permit, a Coastal Development Permit and a Conditional Use Permit Amendment. Development within the Army and Navy Academy Campus will be reviewed relative to the Redevelopment Permit, Conditional Use Permit, Coastal Development Permit, State Law, Carisbad's General Plan, Municipal Codes, and City Standards, Policies and Guidelines. There are two general pathways for development review depending ifthe project is located inside or outside the redevelopment area. The following describes the two development review processes. A. Applications within the Redevelopment Area (Planning Areas A, D, & E) All projects in the City of Carisbad Village Redevelopment Area are subject to the design review and development approval process set forth in the City of Carisbad Village Redevelopment Master Site Plan and Design Manual. The manual describes three types of permits that may be required with the development of any portion of the Master Site Plan: Administrative Redevelopment Permit (RP) An Administrative Redevelopment Permit must be obtained when: • New construction of building(s) or addition(s) to the building footprint which have a building permit valuation which is equal to or less than $50,000; and/or • Interior or exterior improvements to existing structures which result in an intensity of use; and/or • Provisional Land Uses, where a minor or major redevelopment permit is not required. • Changes in permitted land uses which result in site changes, increased ADT, increased parking requirements, or result in compatibility issues/problems; and/or <• Signs for existing businesses or facilities; and/or • Repair or Maintenance Activities which are not exempt; and • Project does not require a variance of any type. The Housing and Redevelopment Director shall have the authority to approve, approve with conditions, or deny an administrative permit for an eligible administrative permit. No action is required from the Design Review Board or the Housing and Redevelopment Commission. ArkKy akvd Navy Acade^vty Master site PLaiA, 24 Novembers, 200^ Phasing Plan Minor Redevelopment Permits (RP) A Minor Redevelopment Permit must be obtained when: • New construction of building(s) or addition(s) to the building footprint which have a building permit valuation which is greater than $50,000 but less than $150,000 • Variances for projects within this category and those which would othen/vise be exempt or be eligible for an administrative permit. The Design Review Board shall have the authority to approve, approve with conditions, or deny Minor Redevelopment Permits. The Design Review Board shall also act upon appeals from decisions made by the Housing and Redevelopment Director. Major Redevelopment Permits (RP) A Major Redevelopment Permit must be obtained when: • New construction of building(s) or addition(s) to the building footprint which have a building permit valuation which is greaterthan $150,000. • Variances for projects within this category. The Housing and Redevelopment Commission shall have the authority to approve, approve with conditions, or deny Major Redevelopment Permits following receipt of a recommendation from the Design Review Board. The Commission shall also act upon appeals from decisions made by the Board. Coastal Development Permit (CDP) Coastal Development permits will be required for all development within the Coastal Zone. B. Applications outside of the Redevelopment Area (Planning Area B, C, & F) Planning Areas B, C and F of the Army and Navy Academy Master Site Plan are situated outside of the boundaries of the City of Carisbad Village Redevelopment Area. Projects proposed for these planning areas are subject to Title 21 of the Carisbad Municipal Code and must follow the permitting procedures of Title 21. Pursuant to section 21.16.020 (R-3 Multiple-Family Residential Zone) private schools are allowed by a Planning Commission approved CUP. The Master Site Plan for the Army and Navy Academy was approved and defined by Conditional Use Permit (CUP 94-02x1A). Therefore, no additional Conditional Use Permits are required to implement each phase of the Army and Navy Academy campus unless the phase proposes changes to the uses specified within the approved Master Site Plan. Required permits for development in Planning Areas B, C, & F will include: Site Development Plan (SDP) Pursuant to section 21.82.040 (Beach Area Overiay Zone) no building permit or other entitlement shall be issued for any use unless there is a valid SDP. When a Ari^y aiA,d Navy Acadein^y Master site PLaiA- 25 Novembers, 200S Phasing Plan development requires a Conditional Use Permit or a Planned Development Permit, then an SDP is not required. Coastal Development Permit (CDP) Pursuantto section 21.201.030 (Coastal Development Permit Procedures) development within the Coastal Zone shall obtain a Coastal Development Permit. Table 9 summarizes the required entitlements for the development of Master Site Plan. Table 9. IVIaster Site Pian Phasing Entitlements BIdg. No. Building Name Planning Area Required Entitlements A-2 Dining Hall, Commandant's, Operations & IT Dept. A RP/CDP A-3 Cadet Store A RP/CDP A-4 Recreation HalP B SDP/CDP A-5 Health Center at Remodeled Davis Hall^ A RP/CDP B-1 Bridge^ E RP/CDP D-1 Dormitory A RP/CDP D-2 Dormitory A RP/CDP D-3 Anderson Hall A RP/CDP D-4 Crean Hall A RP/CDP E-1 Auditorium (500 seats) & Music Department A RP/CDP E-2 Academic Building A RP/CDP E-3 Academic / Library Building & West Tower A RP/CDP E-4 Atkinson Hall - Remodel to Classrooms^ A RP/CDP E-5 Science Building A RP/CDP E-7 Amphitheater A RP/CDP H-1 Staff Housing D RP/CDP H-2 Staff Housing C SDP/CDP M-1 Maintenance Facilities Building E RP/CDP S-2 Athletic Building and East Tower E RP/CDP S-3 Pool Locker Rooms and Bleachers A RP/CDP S-4 Sports Court - Basketball A RP/CDP S-5 Day Student Center at Davis Hall - Partial Remodel^ A RP/CDP RP Redevelopment Permit (type of redevelopment permit will be determined prior to submittal) CDP Coastal Development Permit SDP Site Development Plan ^Remodel of building may not require a SDP/CDP, but rather a non-discretionary permit if only tenant improvements are required. Evaluation of the scale of remodel will be conducted and determination will be made by Planning Director at time prior to project submittal. ^ Remodel of building may not require a RP/CDP, but rather a non-discretionary permit if only tenant improvements are required. Evaluation of the scale of remodel will be conducted and determination will be made by Planning Director at time prior to project submittal. ^Bridge will require approvals and coordination from Redevelopment as well as Engineering since it will be constructed over the public right-of-way. Arm,y aiA.d Navy Acadeioiy Master site VICWA. 26 Novembers 200^ Phasing Pian IV. Phasing Administration The Academy phasing plan meets the needs of the campus as of the April 2008 baseline. Throughout the process of redeveloping the campus, the order in which particular buildings are constructed will likely change based on changing needs and funding sources. Therefore, while the phases appear in sequential order in the following exhibits (A.01-A.20), the phases can occur in any order as long as the necessary improvements related to that phase are developed concurrently. Arioiy av\.d Navy Academ,y Master site PLaiA. 27 Novembers, 200S PHASE 1 SCOPE OF WORK NEW BUILDINGS NEWADMISSIOHS SAOMHISTRATION aJILDING (A31 NEW DINING HAl.L,COMMANDANT.S OFFICE. OPERAriONS « IT (3ePA«TMENT [ASI NBA/CADET STORE |A71 RECREATION HAU.. Ra^lODELED IA?1 HEALTH CENTER AT Dwve HALL - REMODELED fS^ NEWBRIDGE NEWDORMrrORY IP?] NEWDORMrropy 15^ ANDERSON HALL - ADDITION / REMO DEL CREAW HALL - ADDITION / REMODEL [13 NEW AUDITORIUM 4 MUSIC DEPARTMENT 1151 NEWACSCCMIC BUtDINO |F3l NEWACACeMIC/LIBRARYBUILDINS* WEST TOWCR fS^I ATKINSON HALL-REMODELTO CLASSROOMS (E?I NEW SCIENCE ailLDING [g^ NEW ART DEPARTMENT-REMOtDEL [E?1 NEWAMPHITHEATER |H-i1 NEW STAFF HOUSING STAFF PARKING BELOWP-8 (18 SPACES) IFTsI NEW STAFF HOUSING STAFF PARKING BELOW P-9 (18 SPACES) IKHI NEW MAINTENANCE FACL ITIES BUILDING fPTi PARKING LOT AT BLDG M-1 (39 SPACES) |P^ PARKING LOT AT BLDG M-1 (3 SPACES) (wl PARKING LOT AT BLDG S-2 (16 SPACES) [P?1 PARKING LOT AT BLDG A^I (30 SPACES) [P^ PARKING LOT AT BLDG. E-1 (31 SPACES) [P?1 PARKING LOT AT BLDG. H-1 (8 SPACES) l^el PARKING LOT AT BLDG H-1 (18 SPACES) (PARKING AT SRADE 1 STORY STAFF HOUSING ASOVE j fFSl PARKING LOT AT BLDG H-3 < 18 SPACES) (PARKING AT GRADE 1 STORY STAFF HOUSING ABOVE) [S^ NEW ATHLETIC FACILITY fMl NEWPOOL LOCKER ROOMS AND BLEACHERS NEW SPORTS COURT-BASKETBALL rgsl DAY STUDENT CENTER AT DAVIS HAU. - REMODEL ON SITE PARKING CAPACITY DORMITORY CAPACITY SITE PLAN •^•^ SCALE- N.TS. N e EXISTING BUILDINGS DD m Q] m m CD m DU •11 ca UB UB un cn rm [IS] nn GD im m] on on •n Qs] DD on rwi cm on nn on on on on on on im El on IH] lEiil Em [ID FACILrrES MANAGEMENT ACADEMIC BUILDING 400 HOOVER HALL ANDERSON HALL McLENDON HALL MclNTOSH HALL ACADEMIC BUILDING 300 LEWIS HALL CREAN HALL ATKINSON HALL TAC COUNSELING CENTER OPERATIONS OFFICE ACADEMIC BUILDING 100 DAVIS HAU 1ST FLOOR AUDITORIUM/GYM 2ND FLOOR : EXECUTIVE OFFICES ACADEMIC OFFICES BAND ROOM COTTAGE NO 1 COMMAN(WANT'S OFFICE SUMMER PROGRAMS COTTAGE NO.3 COTTAGE NO 4 COTTAGE NO 5 MLLER HALL MUSEUM COTTAGE NO 6 « 7 COMMAND STAC BUSINESS OFFICE 1ST FLOOR MESS HALL 2ND FIOOR : ADMISSIONS S PARENT AFFAIRS OFFICES EAST FEGAN 1ST FLOOR MESS HALL 2ND FLOOR STAf F HOUSING TRANSPORTATION * HR (MOHAN HALL) ACADEMIC BUIIDING 500 ACADEMIC BUILDING 800 LIBRARY STAFF HOUSING STAFF HOUSING SCIENCE BUILOING FACULTY APX«TMENTS CHAPEL RECREATION HALL « STORE PRESIDENTS RESIDENCE ATHLETIC FACILITY STORAGE AREA EXISTING PARKING LOT EXISTING PARKING LOT EXISTING PARKING LOT EXISTING PARKING LOT EXISTING SPORT COURT LEGEND EXISTING PROPERTY LINE PROPOSED PROPERTY LINE EXISTING TO BE REMOVED CURRENT PHASE DEMOISION COMPLETED PARKING LOT GENERAL NOTES 1) BASIC BUILDING LOCATIONS WILL BE APPR OVED WITH THIS PLAN VARIATIONS TO EXACT BUIDING CONFIGURATION MAY OCCUR DURING SUBSEQUENT APPROVALS 2) PROPOSED PHASING ORDER MAY CHANGE ,AS DETERMWED SY ARMY AND NAVY ACADEMY. ReVI8iON8> HS DGE Mark T. House John Dodgo •nniMCA Mm m.Mr.ofrz m tuglomi Jr«tlv R rttadiy. in •.M.a. Mrt, <.»eU II. bl tfwMMg. ind Mlw ©2005 - 2008 House & OxJga Design, Inc i PRELIMINARY NOT FOR CONSTRUCTION SCALE-N.T.&. DATE. 01-0^-06 PHASIN6 EXHIBIT A1.01 PHASE 2 SCOPE OF WQRK DEMO COTTAGES NO 8 & 7 (BUILDING NO 2S) DEMO COMMAND A TAC (BULDING NO 26) BUILD NEWSCENCE BUILDING (BUILDING NO E-5) NEW BUILDINGS NEWADMISSIONSS ADMINISTRATION BUILDING [A31 NEWDINING HALL, COMMANDANTS OFFICE, OPERATIONS 4 IT DEPARTMENT [M] NEW CADET STORE rA4l RECREATION HAU - REMODELED [M\ HEALTH CENTER AT DAVIS HALL • REMODELED rs?! NEWBRIDGE [D?| NEW DORMITORY IFTI NEWDORMITORV ID?) ANDERSON HALL-ADDITION/REMODEL [D4l CREAN H/M.L - ADDITIOM / REMODEL fE-Tl NEW AUDITORIUM 4 MUSIC DEPARTMENT IEH NEW ACADEMIC BULDING [&3l NEWACAOEMIC/LIBRARY BUILDING S WEST TOWER [&4l ATKINSON HALL - REMODEL TO CLASSROOMS [&5l NEW SCIENCE BUILDING [FSl NEWART DEPARTMENT-REMODEL [ETI NEWAMPHITHEATER [HTI NEW STAFF HOUSING STAFF PARKING BELOWP-8 (18 SPACES) |H^ NEW STAFF HOUSING STAFF PARKING BELOW P-9 (18 SPACES) IKTTI NEW MAINTENANCE FACILITIES BUILDING IPH PARKING LOT AT BLDG M-1 (39 SPACES) [M1 PARKING LOT AT BLDG M-1 (3 SPACES) fp31 PARKING LOT AT BLDG. S-2 (16 SPACES) !P7\ PARKING LOT AT BLDG A-1 (30 SPACES) [P31 PARKING LOTAT BLDG. E-1 (31 SPACES) [P?] PARKING LOT AT BLDG H-1 (6 SPACES) [P51 PARKING LOT AT BLDG H-1 (18 SPACES) (PARKING AT SRADE 2 STORY STAFF HOUSING ABOVE ) PARKING LOT AT BLDG H-2 (18 SPACES) (PARKING AT GRADE 1 STORY STAFF HOUSING ABOVE) fS^ NEW ATHLETIC FACILITY [S31 NEW POOL LOCKER ROO MS AND BLEACHERS fsTI NEW SPORTS COURT-BASKETBALL ON SITE PARKING CAPACITY DORMITORY CAPACITY EXISTING BUILDINGS m m m m m on QD UB EE DH DH on oa on on Hol na rm on on on an rm •n on nn oa on ta on on oa on [M HB ED RTI on E] IS] Ea EH [ID FACiLrres MANAGEMENT ACADEMIC BUIIDING 400 HOOVER HALL ANDERSON HALL McLENDON HALL MclNTOSH HALL ACADEMIC BUILDING 300 LEWIS HALL CREAN HALL ATKINSON HALL TAC COUNSELING CENTER OPERATIONS OFFICE ACADEMIC BUILDING 100 DAVIS HALL 1ST FLOOR AUDITORIUM/ GYM 2ND FLOOR : EXECUTIVE OFFICES ACADEMIC OFFICES BAND ROOM COTTAGE NO 1 COMMANDANT'S OFFICE SUMMER PROGRAMS COTTAGE NO.3 COTTAGE NO 4 COTTAGE NO 5 MILER HALL MUSEUM COTTAGE NO 6 « 7 COMMAND STAC BUSINESS OFFICE 1ST FLOOR MESS HALL 2N0 FLOOR : ADMISSIONS S PARENT AFFAIRS OFFICES EAST FEGAN 1ST FLOOR MESS HALL 2ND FLOOR . STAFF HOUSING TRANSPORTATION *HR (MOH/W HALL) ACADEMIC BUILDING 500 ACADEMIC BUILDINO BOO LIBRARY STAFF HOUSING STAFF HOUSING SCIENCE BUILDING FACULTY APARTMENTS CHAPEL RECREATION HALL S STORE PRESIDENT'S RESIDENCE ATHLETIC FACILITY STORAGE AREA EXISTING PARKING LOT EXISTING PARKING LOT EXISTING PARKING LOT EXISTING PARKING LOT EXISTING SPORT COURT LEGEND EXISTING PROPERTY LINE PROPOSED PROPERTY LINE EXISTING TO BE REMOVED CURRENT PHASE DEMOISION COMPLETED PARKING LOT GENERAL NOTES 1) BASIC BUILDING LOCATIONS WILL BE APPROVED WITH THIS PLAN VARIATIONS TO EXACT BULDING CONFIGUftATION MAY OCCUR DURING SUBSEQUENT APPROVALS 2) PROPOSED PHASING OR DEJ! MAY CHANGE ,4S DETERMHED BY ARMY AND NAVY ACADEMY. He DGE Mvk T. HouM John Dodgo •nOHMCM IMIl ©2005 - 2008 Housfl & Dodge Design. Inc PRELIMINARY NOT FOR CONSTRUCTION 8CAU& N.T.&. DAT& oi-o^-oe PHASIN* EXHIBIT A1.02 PHASE 3 SCOPE OF WORK DEMO McLENDON HALL (BUILDING NO 5) BUILD NEW DORMITORY (BUIDING NO D-1 ] NEW BUILDINGS [A^ NEWAOMISSI0N3 SADMINISTRATION BUILDING [A^ NEWDINING HALL. COMMANDANT'S OFFICE, OPERATIONS i IT DEPARTMENT IA^ NEW CADET STORE [A71 RECREATION HAa-REMODELED IA^ HEALTH CENfEP AT DAVe HALL -REMODELED [Fil NEWBRIDGE fO^ NEW[X>RM(TOR>' |g?l NEW DORMITORY IMI ANDERSON HALL-ADDITION/REMODEL ID4I CREAN HALL - ADDITION / REMODEL [&l1 NEW AUDITORIUM 4 MUSIC DEPARTMENT [EH NEW ACADEMIC BULDING fE^ NEWACAOEMIC/LIBRARY BUILDING i WEST TOWER [&4l ATKINSON HALL - REMODEL TO CLASSROOMS [&5l NEW SCIENCE BUILDING NEWART DEPARTMENT - REMODEL [&7l NEWAMPHITHEATER n?l1 NEW STAFF HOUSING STAFF PARKING BELOW P-8 (18 SPACES) (H^ NEW STAFF HOUSING STAFF PARKING BELOWP-9 (18 SPACES) [M^ NEWMAINTENATJCEFACILITIESBUILDING EH PARKING LOT AT BLDG M-1 (39 SPACES) [P?l PARKING LOT AT BLDG M-1 (8 SPACES) fp31 PARKING LOT AT BLDG S-2 (16 SPACES) fpTI PARKING LOT AT BLDG A-1 [30 SPACES) PARKING LOT AT BLDG E-1 (31 SPACES) [P?l PARKING LOT A' BLDG. H-1 (6 SPACES) IPSI PARKING LOT AT BLDG H-1 (18 SPACES) (PARKING AT GRADE 2 STORY STAFF HOUSWG AB0V5) (raj PARKING LOT AT BLDG H-2 (18 SPACES) (PARKING AT GRADE 1 STORY STAFF HOUSING ABOVE) [S^ NEW ATHLETIC =ACILITY [S31 NEW POOL LOC:-<ER ROOMS AND BLEACHERS f&31 NEW SPORTS CDURT-BASKETBALL ON SITE PARKING CAPACITY EXISTING BUILDINGS •D ca QD m [Zl m m m riol on on on on rm nn oa on on on nn m on on on He] nn cm on on m) oa on on cm on Of! riFi on rm on on EH (La Em [ID FACILrrCS MANAGEMENT ACADEMIC BUILDING 400 HOOVER ANDERSON HALL McLENDON HALL MclNTOSH HALL ACADEMIC BUILDING 300 LEWIS HALL CREAN HALL ATKINSON HALL TAC COUNSELING CENTER OPERATIONS OFFICE ACADEMIC BUILDING 100 DAVIS HALL 1ST FLOOR AUDITORIUM/ GYM 2ND aOOR : EXECUTIVE OFFICES ACADEMIC OFFICES BAND ROOM COTTAGE NO 1 COMMANDANT'S OFFICE SUMMER PROGRAMS COTTAGE NO. 3 COTTAGE NO.4 COTTAGE NO 5 MILLER HALL MUSEUM COTTAGE NO S « 7 COMMAND 4 TAC BUSINESS OFFICE 1ST FLOOR MESS HALL 2ND FLOOR : ADMISSIONS & PARENT AFFAIRS OFFICES EAST FEGAN 1 ST FLOOR MESS HALL 2ND FLOOR STAf F HOUSING TRANSPORTATION iHR (MOHAN HALL) ACADEMIC BUILDING 500 ACADEMIC BUILDING 800 LIBR/«?Y STAFF HOUSING STAFF HOUSING SCIENCE BUILDING FACULTY APXWTMENTS CH/VPEL RECREATION HALL S STORE PRESIDENT'S RESIDENCE ATHLETIC FACILITY STORAGE AREA EXISTING PARKING LOT EXISTING PARKING LOT EXISTING PARKING LOT EXISTING PARKING LOT EXISTING SPORT COURT LEGEND EXISTING PROPERTY LINE PROPOSED PROPERTY LINE EXISTING TO BE REMOVED CURRENT PHASE DEMOISION COMPLETED PARKINS LOT GENERAL NOTES 1) BASIC BU ILDING LOCATIONS VMLL SE APPROVED WITH THIS PLAN VARIATIONS TO EXACT BULDING CONFIGURATION MAY OCCUR DURING SUBSEQUENT APPROVALS 2) PROPOSED PHASING ORDER MAY CHANGE .AS DETERMINED BY ARMY AND NAVY ACADEMY. ReVI«ON» H2 DGE ktark T. Howe John Dodflo Me4« AML mam.0A Mm dlstovd JnOlya MadPf, Jn vt^a% ©2005-2008 House 4 Dodge Design, Inc PRELIMINARY NOT FOR CONSTRUCTION SCALE-N.T.S. DAT& OI-O^-OS PHA6IN* EWIBIT A1.03 NEW BUILDINGS PHASE 4 ED 1^ NEW CADET STORE RECREATION HALL - REMODELED HEALTH CENT REMODELED NEWBRIDGE NEW DORMITORY NEWOORMITORy ANDERSON HALL - ADDITION / REMODEL CREAN HALL - ADDITION / REMODEL NEW AUDITORIUM 4 MUSC DEPARTMENT NEW ACADEMIC BULDING NEW SCIENCE BUILOING NEWART DEPAfiTMENT - REMODEL NEWAMPHITHEATER NEW STAFF HOUSING STAFF PARKING BELOW P-8 (18 SPACES) NEW STAFF HOUSING STAFF PARKING BELOWP-9 (18 SPACES) NEW MAINTENANCE FACILITIES BUILOING PARKING LOT AT BLDG. M-1 (39 SPACES) PARKING LOT AT BLDG M-1 (8 SPACES) PAR KING LOT AT BLDG S-2 (16 SPACES) PARKING LOT AT BLDG A-1 (30 SPACES) PARKING LOT AT BLDG E-1 (31 SPACES) PARKING LOT AT BLDG. H-1 (8 SPACES) PARKING LOT Al BLDG H-1 (18 SPACES) (PARKING AT SRADE 2 STORY STAFF HOUSING /leOVE ) PARKING LOT AT BLDG H-2 (18 SPACES) (PARKING AT GRADE 1 STORY STAFF HOUSING ABOyE) NEW ATHLETIC FACILITY NEW SPORTS COURV - BASKETBALL EXISTING BUILDINGS rn FACILirES MANAGEMENT m ACADEMIC BUILDING 400 HOOVER HALL ANDERSON HALL rS~l McLENIDON HALL fe"! MclNTOSH HALL rn ACADEMIC BUILDING 300 DO LEWIS HALL m CREAN HALL on ATKINSON HALL im TAC COUNSELING CENTER rm OPERATIONS OFFICE rm ACADEMIC BUILDING 100 rm DAVIS HALL 1STFL00R AUDITORIUM/GYM. 2ND FLOOR : EXECUTIVE OFFICES rm ACADEMIC OFFICES rm BAND ROOM rm COTTAGE NO 1 rm COMMANDANT'S OFFICE rm SUMMER PROGRAMS on COTTAGE NO. 3 cm COTTAGE NO. 4 oa COTTAGE NO 5 on MILLER HALL on MUSEUM on COTTAGE NO 8 « 7 on COMMAND 4 TAC im BUSINESS OFFICE on 1ST FLOOR HE/»LTH CENTER 2ND FLOOR : WEST FEGAiN on DEVELOPMENT, ALUMNI AND ATHLETIC OFFICES on 1ST FLOOR MESSHALL 2ND FLOOR : ADMISSIONS S PARENT AFFAIRS OFFICES cm EAST FEGAN 1ST FLOOR MESSHALL 2ND FLOOR . STAFF HOUSING oa TRANSPORTATION 4 HR (MOHAN HALL) on ACADEMIC BUILOING 500 on ACADEMIC BUILDING 800 on LIBRARY on STAFF HOUSING nn STAFF HOUSING on SCIENCE BUILDING on FACULTY APARTMENTS on CHAPEL RECREATION HALL « STORE on PRESIDENTS RESIDENCE on ATHLETIC FACILITY on STORAGE AREA fp^ EXISTING PARKING LOT Fio) EXISTING PARKING LOT on EXISTING PARKING LOT Fiai EXISTING PARKING LOT rm EXISTING SPORT COURT LEGEND EXISTING PROPERTY LINE PROPOSED PROPERTY LINE EXISTING TO BE REMOVED CURRENT PHASE DEMOISION COMPLETED PARKING LOT GENERAL NOTES 1) BASIC BUILDING LOCATIONS WILL BE APPR OVED WITH THIS PLAN VARIATIONS TO EXACT BULDING CONFIGURATION MAY OCCUR DURING SUBSEQUENT APPROVALS 2) PROPOSED PHASING ORDER MAY CHANGE AS DETERMHED BY ARMY AND NAVY ACADEMY. HS ^^DGE e • 1 • • Mark T. HouM John Dodge MO 4* AML •nomCM Mm ©2005 - 2008 House 4 Dodge Design, Inc PRELIMINARY NOTFOR CONSTRUCTION SCALE-N.T.S. DATB PHASING EXHIBIT A1.04 NEW BUILDIN(3S PHASE 5 SCOPE OF WORK REMODEL ACADEMIC BULDING 800 NTO ART DEPAfiTMENT (BUILDING NO E-S; EH IS] iA4l lin ipn I54l [^ m NEW ADMISSIONS 4 ADMINISTRATION BUILDING NEWDINING HALL, COMMANDANT'S OFFICE, OPERAl IONS 4 IT DEPARTMENT NEW C/UDET STORE RECREATION HAa - REMODELED HEALTH CENT REMODELED NEWBRIDGE NEW(X)RMITORY NEWOORMITOR'^ ANDERSON HALL - ADDITION / REMODEL CREAN HALL - /EDITION / REMODEL NEW AUDITORIUM 4 MUSC DEPAfiTMENT NEW/VCACEMIC BULDING m EH El [p^ [El [pn [M] NEW SCIENCE BUILDING NEW/4RT DEPARTMENT - REMODEL NEWAMPHITHEATER NEW STAFF HOUSING STAFF PARKING BELOWP-8 (18 SPACES) NEW STAFF HOUSING STAFF PARKING BELOWP-9 (18 SPACES) NEW MAINTENANCE FACILITIES BUILDING PARKING LOT AT BLDG. M-1 (39 SPACES) PARKING LOT AT BLDG M-1 (8 SPACES) PffWINO LOT AT BLDG S-2 (16 SPACES) PARKING LOT AT BLDG A^l (30 SPACES) PARKING LOT AT BLDG E-1 (31 SPACES) PARKING LOT AT BLDG H-1 (8 SPACES) PARKING LOT AT BLDG H-1 (18 SPACES) (PARKNG AT GR/WE 2 STORY STAFF HOUSING ABOVE ) PARKING LOT AT BLDG H-2 (18 SPACES) (PARKING AT GRADE 1 STORY STAFF HOUSING /leOVE) NEW ATHLETIC FACILITY NEW SPORTS COURT - BASKETBALL EXISTING BUILDINGS m cn CD CD CE cn CO czi riol on oa UB rm on on oa on rm on ITTI on on n±i Hi] He] nn on on on nn on on on cm on on on ED on nn on En on [ID FACIL ITES MANAGEMENT ACADEMIC BUILDING 400 HOOVER HM.L ANDERSON HALL McLENDON HALL MclNTOSH HALL AC/VDEMIC BUILDING 300 LEWIS HALL CREAN HALL ATKINSON HALL TAC COUNSELING CENTER OPERATIONS OFFICE ACADEMIC BUILDING 100 DAVIS HAa 1STFL00R AUDITORIUM/SYM 2ND FLOOR : EXECUTIVE OFFICES ACADEMIC OFFICES BAND ROOM COTTAGE NO 1 COMMANDANT'S OFFICE SUMMER PROGRAMS COTTAGE NO. 3 COTTAGE NO 4 COTTAGE NO 5 MLLER HALL MUSEUM COTTAGE NO 6 4 7 COMMAND STAC BUSINESS OFFICE 1ST FLOOR MESSHALL 2ND FLOOR : ADMISSIONS S PARENT AFFAIRS OFFICES EAST FEGAN 1ST FLOOR MESSHALL 2ND FLOOR • STAFF HOUSING TRANSPORTATION 4 HR (MOHAN HALL) ACADEMIC BUILDING 500 ACADEMIC BUILDING 800 LIBR/^RY STAFF HOUSING STAFF HOUSING SCIENCE BUILDING FACULTY APARTMENTS CHAPEL RECREATION HALL S STORE PRESIDENT'S RESIDENCE ATHLETIC FACILITY STORAGE AREA EXISTING PARKING LOT EXISTING PARKING LOT EXISTMG PARKING LOT EXISTING PARKING LOT EXISTING SPORT COURT LEGEND EXISTING PROPERTY LINE PROPOSED PROPERTY LINE EXISTING TO BE REMOVED CURRENT PHASE DEMOISION COMPLETED PARKING LOT GENERAL NOTES 1) BASIC BUILDING LOCATIONS WILL BE APPROVED WITH THIS PLAN VARIATIONS TO EXACT BULDING CONFIGURATION MAY OCCUR DURING SUBSEQUENT APPROVALS 2) PROPOSED PHASING OR DER MAY CHANCE .AS DETERMINED BY ARMY AND NAVY ACADEMY. REVISIONS- He DGE Mark T. House John Dodge MO 4* AML •aiDknCA Mm on . 997. 0979 ph ©2005 - 2008 House 4 Dodge Design, Inc PRELIMINARY NOT FOR CONSTRUCTION SCALE-N.T.S. DAT» 01-0^-06 PHASING EWIBIT A1.05 PHASE 6 SCOPE QF WQRK DEMO EXISTING ATHLETIC BUILDING (BUILDING NO 43] DEMO EXISTING PARKING LOT NO P-11 BUILD NEWATHLETIC FACILITY (BUILDING NO 3-2) BUILD NEWPARKING LOT NO. P-3 NEW BUILDINGS [An NEW ADM ISSIONS 4 ADMIN ISTRAT ION BUILDING [An NEWDINING HALL, COMMANDANT'S OFFICE, OPERATIONS « IT DEPARTMENT [An NEW CADET STORE [An RECREATION HAIL-REMODELED [ASI HEALTH CENTER AT DAVtS HALL -REMODELED [gn NEWBRIDGE [Sn NEWDORMfTORY [g?1 NEWDORMirORY [Sn ANDERSON H/M-L-AODrriON/REMODEL ID-II CREAN H/KLL - AL3DITI0N /REMODEL [m NEW AUDITORIUM 4 MUSC DEPAfiTMENT im NEW ACADEMIC BULDING nn NEWACAOEMIC/LIBRARY BUILDING 4 WEST TOWER im ATKINSON HALL REMODEL TO CLASSROOMS im NEW SCIENCE BUILDING [FSl NEWART DEPARTMENT-REMOOCL (gn NEWAMPHITHEATER [ifTI NEW STAFF HOUSING STAFF PARKING BELOWP-8 (18 SPACES) [i+n NEW STAFF HOUSING STAFF PARKING 9EL0WP-9 (18 SPACES) [KMI NEW MAINTENANCE FACL ITIES BUILDING [pn PARKING LOT AT BLDG M-1 (39 SPACES) [pn PARKING LOT AT BLDG M-1 (8 SPACES) [pn PARKING LOT AT BLDG S-2 (16 SPACES) [pn PARKING LOT AT BLDG A,1 (30 SPACES) [pn P/»RKING LOT AT BLDG. E-1 (31 SPACES) [P?l PARKING LOT AT BLDG H-1 (8 SPACES) [pn PARKING LOT AT BLDG H-l (18 SPACES) (PARKMG AT GRADE 2 STORY STAFF HOUSING ABOVE ) PARKING LOT AT BLDG H-2 (18 SPACES) (PARKING AT GR/>OE 1 STORY STAFF HOUSING ABOVE) [in NEWATHLETIC FACILrTY [sn NEWPOOL LOCKER ROOMSAND BLEACHERS [sn NEW SPORTS COURT - BASKETBAa [gl^j DAY STUDENT CENTER AT DAVIS HAa - REMODEL ON SITE PARKING CAPACITY EXISTING BUILDINGS I 1 I FACIL ITES MANAGEMENT I 2 I ACADEMIC BUILDING 400 rri HOOVER HALL m ANDERSON HALL m McLENDON HALL [T] MclNTOSH H/ULL I 7 I ACADEMIC BUILDING 300 m LEWIS HALL m CREAN HALL I 10 I ATKINSON HALL im TAC COUNSELING CENTER 1121 OPERATIONS OFFICE I 131 ACADEMIC BUILDING 100 rm DAVIS HAa IST FLOOR . AUDITORIUM/ SYM. 2ND FLOOR • EXECUTIVE OFFICES rm ACADEMIC OFFICES rm BAND ROOM I 17 I COTTAGE NO 1 I IS I COMMANDANT'S OFFICE rm SUMMER PROGRAMS on COTTAGE NO 3 ITTI COTTAGE NO 4 oa COTTAGE NO 5 rm MLLER HALL on MUSEUM on COTTAGE NO 8 4 7 I 281 COMMAND 4 TAC nn BUSINESS OFFICE on 1ST FLOOR HEALTH CENTER 2ND FLOOR ; V«ST FEGAN on DEVELOPMENT. ALUMNI AHO ATHLETIC OFFICES on 1ST FLOOR MESSHALL 2ND FLOOR : AOIISSIONS 4 PARENT AFFAIRS OFFICES im EASTFEG/WI 1ST FLOOR MESSHALL 2ND FLOOR STAFF HOUSING oa TRANSPORTATION 4 HR (MOHAN HALL) on ACADEMIC BUILDING 500 on ACADEMIC BUILDING 800 on LIBRARY del STAFF HOUSING rm STAFF HOUSING on SCIENCE BUILDING I 39 I FACULTY APARTMENTS on CHAPEL I 411 RECREATION HALL 4 STORE on PRES DENT'S RESIDENCE 1431 ATHLETIC FACILITY on STORAGE/«EA En EXISTING PARKING LOT [pHol EXISTNG PARKING LOT Fn EXISTMG PARKING LOT Fiil EXISTMG PARKING LOT FsTI EXISTMG SPORT COURT LEGEND l^~1 EXISTING PROPERTY LINE PROPOSED PROPERTY LINE EXISTING TO BE REMOVED CURRENT PHASE DEMOISION COMPLETED PARKING LOT GENERAL NOTES 1) BASIC SU LDING LOCATIONS Wili BE APPROVED WITH THIS PIAN VARIATIONS TO EXACT BULDING CONFIGURATION MAY OCCUR DURING SUBSEQUENT APPROVALS 2) PROPOSED PHASING ORDER MAY CHANGE ,AS DETERMINED BY ARMY ANO NAVY ACADEMY. REVMIONSi HS DGE Mark T. House John Dodge ©2005 - 2008 House 4 Dodge Design, Inc ON PRELIMINARY NOT FOR CONSTRUCTION SCALE-N.T.S. DATB oi-o^-oe PHASING EXHIBIT A1.06 PHASE 7 SCOPE QF WQRK DEMO HOOVER HALL (BUILDUGNO. 3) BUILD NEWOORMITORY (BULDING NO D-2) lAn E] IA51 lAn |An fsn (on ipn lon Ion NEW ADMISSIONS 4A0MINISTRATI0N BUILDING NEW CADET STORE RECREATION HAa - REMODELED HEALTH CENT REMODELED NEWBRIDGE NEW DORMITORY NEWDORMITORV ANDERSON HALL - /ADDITION / REMODEL CREAN HALL - ADDITION / REMODEL NEW AUDITOR IUM 4 MUSC DEPAfiTMENT NEWACAOEMIC BULDING IED iHn [pn [pn [pn ipn [M] [pn NEW SCIENCE BUILDING NEWART DEPARTMENT - REMODEL NEWAMPHITHEATER NEW ST AFF HOUSING STAFF PARKING BELOWP-8 (18.3P/\C£S) NEW STAFF HOUSING STAFF PARKING 8EL0WP-9 (18 SPACES) NEW M/UNTENAHCE FACL ITIES BUILDING PARKING LOT AT BLDG. M-1 (39 SPACES) PARKING LOT AT BLDG M-1 (8 SPACES) PARKING LOT AT BLDG S-2 (18 SPACES) PARKING LOT AT BLDG Arl (30 SPACES) PARKING LOTATBLDG E-1 (31 SPACES) PARKING LOT AT BLDG. H-l (8 SPACES) PARKING LOTATBLDG H-I (18SPACES) (PARKMG AT GR/y5E 2 STORY STAFF HOUSMG ABOVE ) PARKING LOT AT BLDG H-2 (18 SPACES) (PARKING AT GRADE 1 STORY STAFF HOUSING ABOVE) NEW BUILDINI3S EXISTING BUILDINGS [Zl m CD cn m m on on Da oa on DU nn oa on rm on nn nn HB m on on nn on on on cm HB on rm on cm on on on on prn on on UB EH EB Fiat ED FACILMES MANAGEMENT ACADEMIC BUILDINO 400 HOOVER HALL ANDERSON HAU. McLEN(X)N HALL MclNTOSH HALL ACADEMIC BUILDING 300 LEWIS HALL CREAN HALL ATKINSON HALL TAC COUNSELING CENTER OPERATIONS OFFICE ACADEMIC BUILDING 100 DAVIS HAa 1ST FLOOR AUDITORIUM/GYM 2HD FLOOR : EXECUTIVE OFFICES ACADEMIC OFFICES BAND ROOM COTTAGE NO 1 COMMANDANT'S OFFICE SUMMER PROGRAMS COTTAGE NO . 3 COTTAGE NO 4 COTTAGE NO 5 MLLER HALL MUSEUM COTTAGE NO S 4 7 COMMAND 4 TAC BUSINESS OFFICE 1ST FLOOR MESSHALL 2N0 FLOOR - ADMISSIONS & PARENT AFFAIRS OFFICES BAST FEG/\N 1ST FLOOR MESSHALL 2ND FLOOR STAFF HOUSING TRANSPORTATION 4 HR (MOHAN HALL) ACADEMIC BUILDING 500 ACADEMIC BUILDING 800 LIBRARY STAFF HOUSING STAFF HOUSING SCIENCE BUILDING FACULTY APARTMENTS CHAPEL RECREATION HALL S STORE PRESOENT'S RESDENCE ATHLETIC FACILITY STORAGE AREA EXISTMG PARKING LOT EXISTNG PARKING LOT EXISTNG PARKING LOT EXISTNG PARKING LOT EXISTNG SPORT COURT LEGEND EXISTING PROPERTY LINE PROPOSED PROPERTY LINE EXISTING TO BE REMOVED CURRENT PHASE DEM 0IS 10N COMPLETED PARKING LOT GENERAL NOTES 1) BASIC BULDING LOCATIONS wia BE APPROVED WITH THIS PLAN VARIATIONS TO EXACT BULDING CONFIGURATON MAY OCCUR DURING SUBSEQUENT APPROVALS 2) PROPOSED PHASING OR DER MAY CHANGE AS DETERMWED BY ARMY AND NAVY ACADEMY. REVmONS- HS DGE Mark T. House John Dodge MO 4a A«« ••otoMGM Mm on . #i7. 0979 ph IWt. .«wu n. u tnMMg. «ia WMn ©2005 - 2008 House 4 Dodga Design. Inc iii PRELIMINARY NOTFOR CONSTRUCTION SCALE-N.T.S. DATS PH/^SIh4ft EXHIBIT A1.07 PHASE 8A SCOPE OF WORK REMODEL HALF OF ANDERSON HALL (BUILDING NO 4) D-3 DEMO ACACCMIC BULDING 400 (BUILDING NO 2) ED Mi [gll \M ipn [w] m [in NEW CADET STORE RECREATION HAa - REMODELED HEALTH CENT REMODELED NEWBRIDGE NEWDORMrrORf NEWDORMITORV ANDERSON HALL • ADOniOH I REMODEL CREAN HAU. - ADDITION / REMODEL NEW AUDITORIUM 4 MUSC DEPAfiTMENT NEW ACADEMIC BULDING [gn m m (ED [pn [El] [pn [pn [PS [pn [M] NEW SCENCE BUILDING NEWART DEP/y?TMENT - REMODEL NEWAMPHITHEATER NEW STAFF HOUSING STAFF PARKING BELOWP-8 (13 SPACES) NEW STAFF HOUSING STAFF PARKING BELOWP-9 (18 SPACES) NEW MAINTENANCE FACLITIES BUILDING PARKING LOT AT BLDG M-1 (39 SPACES) P/lRKING LOT AT BLDG M-1 (8 SPACES) PARKING LOT AT BLDG S-2 (16 SPACES) PARKING LOT AT BLDG A,1 (30 SPACES) PARKING LOT AT BLDG E-1 (31 SPACES) PARKING LOT AT BLDG. H-1 (8 SPACES) PARKING LOT AT BLDG H-1 (18 SPACES) (PARKING AT SRADE 2 STORY STAFF HOUSING /leOVS ) PARKING LOT AT BLDG H-2 (18 SPACES) (PARKMG AT GR/VDE 1 STORY STAFF HOUSMG /VBOVE) NEWATHLETIC FACILITY NEW BUILDINGS NEW SPORTS COURT - BASKETBALL ON SITE PARKING CAPACITY EXISTING BUILDINGS rm FACILirES MANAGEMENT rri ACADEMIC BUILDING 400 m HOOVER HAJ.L nn ANDERSON HALL rri UaenDOHHM... cn MclNTOSH HALL I 7 I ACADEMIC BUILDING 300 Q3 LEWIS HALL m CREAN HALL I 10 I ATKINSON HALL irri TAC COUNSELING CENTER oa OPERATIONS OFFICE on ACADEMIC BUILDING 100 rrm DAVIS HAa 1ST FLOOR AUDITORIUM/ GYM 2ND FLOOR EXECUTIVE OFFICES rm ACADEMIC OFFICES rm SAND ROOM rm COTTAGE NO 1 I 18 I COMMANDANT'S OFFICE rm SUMMER PROGRAMS CMI COTTAGE NO 3 im COTT ACE NO 4 oa COTTAGE NO 5 nn MLLER HALL on MUSEUM I 251 COHAGE NO 6 « 7 on COMMAND STAC [Tn BUSINESS OFFCE rial 1ST FLOOR HEALTH CENTER 2ND FLOOR ; WEST FESAN on DEVELOPMENT, ALUMNI AMD ATHLETIC OFFICES on 1ST FLOOR MESSHALL 2N0 FLOOR : ADMISSIONS & PARENT AFFAIRS OFFICES 03 EAST FEGAN 1ST FLOOR MESSHALL 2ND FLOOR STAFF HOUSING on TRANSPORTATION 4 HR (MOHAN HALL) r33l ACADEMIC BUILDING 500 ACADEMIC BUILDING 800 I 351 LIBRARY Hei STAFF HOUSING cm STAFF HOUSING I 381 SCIENCE BUILDING I 39 I FACULTY APARTMENTS ITol CHAPEL rrn RECREATION HALL S STORE rm PRES DENTS RESOENCE 1431 ATHLETIC FACILITV on STORAGE AREA [pm EXISTNG PARKING LOT Fio) EXISTNG PARKING LOT [Fiil EXISTNG PARKING LOT Fia) EXIST NG PARKING LOT I S-l I EXISTNG SPORT COURT LEGENO EXISTING PROPERTV LINE PROPOSED FROPERTY LINE EXISTING TO BE REMOVED CURRENT PHASE IXMOBION COMPLETED PARKING LOT GENERAL NOTES 1) BASIC SU LDING LOCATIONS Wia BE APPROVED WITH THIS PLAN VARIATIONS TO EXACT BUIDING CONFIGURATION MAY OCCUR DURING SUBSEQUENT APPROVALS 2) PROPOSED PHASING ORDER MAY CHANGE AS DETERMWED BY ARMY AND NAVY ACAOSH1 HS DGE Mark T. House John Dodge •nDMOHQA Mm ©2005 - 2008 House 4 Dodge Design. Inc PRELIMINARY NOTFOR CONSTRUCTION SCALE-N.T.S. DATB Ol-O^-Od PH/^SIN* EXHIBIT A1.08A PHASE 8B SCOPE QF WORK REMODEL HALF OF /ANDERSON HALL (BUILDING NO. 4) 0-3 DEMO ACADEMIC BULDING 300 (BUILDING NO 7) BUILD NEWPARKING LOT NO P-5 NEW BUILDINGS [Xn NEWAOMISSION.S 4A0MINISTRATI0N BUILDING (An NEWDINING HALL, COMMANDANT'S OFFICE, OPERATIONS 4 IT DEPARTMENT [An NEW CADET STORE l^n RECREATION HAa-REMODELED [An HEALTH CENTER AT DAVIS HALL - REMODELED [Sn NEWBRIDGE [on NEW DORMITORY |g?1 NEWDORMITORV Ion ANDERSON HALL - /"ODTrON / REMODEL Ion CREAM HALL-ADDITION/REMODEL [En NEW AUDITORIUM 4 MUSC DEPARTMENT im NEWACAOEMIC BULDING im NEW ACADEMIC/LIBRARY BUILDING 4 weST TOWER [En ATKINSON HALL REMODEL TO CLASSROOMS [in NEW SCIENCE BUILDING [Fn NEWART DEPARTMENT-REMODEL [En NEWAMPHITHEATER nm NEW ST/VF HOUSING STAFF PARKING BELOWP-8 (18 SP/\CES) IFin NEW ST/V^F HOUSING STAFF PARKING 6EL0WP-9 (18 SPACES) [Mn NEW MAINTENANCE FACILITIES BUILDING [pn PARKING LOT AT BLDG M-1 (39 SPACES] [pn PARKING LOT AT BLDG M-1 (3 SPACES) [pn PARKING LOT AT BLDG S-2 (16 SPACES) [pn PARKING LOT AT BLDG A-1 (30 SPACES) Fn PARKING LOT AT BLDG E-1 (31 SPACES) [pn PARKING LOTATBLDG H-1 (6 SPACES) |pn PARKING LOT AT BLDG H-1 (18 SPACES) (PARKMG AT GRADE 2 STORY STAFF HOUSING ASOVE) [ra] PARKING LOT AT BLDG H-2 (18 SPACES) (P/>RKMG AT GRADE 1 STORY STAFF HOUSMG /IBOVE) [sn NEWATHLETIC f ACILITY Isn NEWPOOL LOCKER ROOMSAND BLEACHERS [^ NEW SPORTS COURT - BASKETBALL [g5l DAY STUDENT CENTER AT DAVIS HAa - REMODEL ON SITE PARKING CAPACITY EXISTING BUILDINGS CD HD •D m CD cn CID CD cn rm on on on rm rm rm on on rm on ED cm on on on cm ED [U r29i cm EH] on cm on cm Hei cm Hal rwi on rm on on HB ED Ea E3 [ID FACIL ITES MANAGEMENT ACADEMIC BUILDING 400 HOOVER HALL ANDERSON HALL McLEN(X)N HALL MclNTOSH HALI ACADEMIC BUILDING 300 LEWIS HALL CREAN HALL ATKINSON HALL TAC COUNSELING CENTER OPERATIONS OFFICE ACADEMIC BUILDING 100 DAVIS HALL 1ST FLOOR AUDITORIUM/ GYM. 2ND FLOOR: EXECUTIVE OFFICES ACADEMIC OFFICES BAND ROOM COTTAGE NO 1 COMMANDANT'S OFFICE SUMMER PROGRAMS COTTAGE NO 3 COTT/\GE NO 4 COTTAGE NO 5 MLLER HALL MUSEUM COTTAGE NO S 4 7 COMMAND 4 TAC BUSINESS OFFICE 1ST FLOOR MESS HALL 2ND FLOOR : ADMISSIONS S PARENT AFFAIRS OFFICES EAST FEGAN 1ST FLOOR MESSHALL 2ND FLOOR : STAFF HOUSING TRANSPORTATION 4 HR (MOHAN HALL) AC/VDEMIC BUILDING 500 ACADEMIC BUILDING 800 LIBR/VRY STAFF HOUSING STAFF HOUSING SCIENCE BUILDING F/VCULTY AP/VRTMENTS CHAPEL RECREATION HALL 4 STORE PRESIDENT'S RESIDENCE ATHLETIC FACILITY STORAGE AREA EXISTING PARKING LOT EXISTING PARKING LOT EXISTING PARKING LOT EXIST ING PARKING LOT EXISTING SPORT COURT LEGEND EXISTING PROPERTY LINE PROPOSED PROPERTY LINE EXISTING TO BE REMOVED CURRENT PHASE DEMOISION COMPLETED PARKING LOT GENERAL NOTES 1) BASIC BUILDING LOCATIONS Wia BE APPR OVEDWITHTHIS PLAU VARIATIONS TO EXACT BULDING CONFIGURATION MAY OCCUR CtlRING SUBSEQUENT APPROVALS 31 PROPOSED PHASING OR OER MAY CHANGE ,AS DETERMUED BY ARMY AND NAVY ACADEMY. HS DGE Mark T. House John Dodge iDbaawGM Mm 1.007.Mra ph ©2005 - 2008 House 4 Dodge Design, Inc 6 PRai MINARY NOT FOR CONSTRUCTION SCALE-N.T.S. DATB oi-o^-oe PHASIh4(& EXHIBIT A1.08B PHASE 9 SCOPE QF WORK DEMO BUSINESS OFFICE (BUILDING NO 27] BUILD NEWPOOL LOCKER ROOMS, BLEACHERS 4 ENTRY (S-31 BUILD NEWOUTDOOR BASKETBALL COURT (S-4) EH EH ED [An ED [sn m [EH IEU [pn [ED [pn [pn lES [pn NEW ADM ISSIONS S ADMIN ISTRAT ION BUILDING NEW CADET STORE RECREATION HAa - REMODELED HEALTH CENT! REMODELED NEWBRIDGE NEWOORMITORY NEWDORMirORV ANDERSON HALL - ADDITION / REMODEL CREAM HALL - ADDITION / REMODEL NEW AUDITORIUM 4 MUSC DEPAfiTMENT NEWACAOEMIC BULDING NEW SCIENCE BUILDING NEWART DEPARTMENT - REMODEL NEWAMPHITHEATER NEW STAFF HOUSING STAFF PARKING BELOWP-8 (18 SPACES) NEW MAINTENANCE FACLITIES BUILDING PARKING LOT AT BLOG M-1 (39 SPACES) PARKING LOT AT BLDG M-1 (3 SPACES) PARKING LOT AT BLDG S-2 (16 SPACES) PARKING LOT AT BLDG A-1 [30 SPACES) PARKING LOT AT BLDG E-1 (31 SPACES) PARKING LOT AT BLOG H-1 (6 SPACES) PARKING LOTATBLDG H-1 (18 SPACES) [PARKINS AT GRADE 2 STORY STAFF HOUSING /VBOVE ) PARKING LOTATBLDG H-2 (18 SPACES) (PARKING AT GRADE 1 STORY STAFF HOUSING ABOVE) NEWATHLETIC FACILTY NEW BUILDINGS NEW SPORTS COURT - BASKETBAa ON SITE PARKING CAPACITY EXISTING BUILDINGS 00 FACILirES MANAGEMENT m ACADEMIC BUILDING 400 1 3 I HOOVER HALL m ANDERSON HALL m McLENDON HALL m MclNTOSH HALL I 7 I ACADEMIC BUILDING 300 rri LEWIS HALL m CREAN HALL rm ATKINSON HALL llll TAC COUNSELING CENTER rm OPERATIONS OFFICE rm ACADEMIC BUILDING IOO ITTI DAVIS HAa 1STFL0OR AUDITORIUM/GYM 2ND FLOOR • EXECUTIVE OFFICES rrn ACADEMIC OFFICES BAND ROOM rm COTTAGE NO 1 I 181 COMMANDANT'S OFFICE rm SUMMER PROGRAMS r20l COTTAGE NO 3 FTil COTTAGE NO 4 oa COTTAGE NO 5 I 231 MLLER HALL on MUSEUM cm COTTAGE NO 6 4 7 I 28 I COMMAND 4 TAC nn BUSINESS OFFICE nn 1ST FLOOR HEALTH CENTER 2ND FLOOR : WEST FEGAN rW\ DEVELOPMENT./VLUMNI/VND ATHLETIC OFFICES on 1ST FLOOR MESSHALL 2ND FLOOR : ADMISSIONS 4 PARENT AFF/VIRS OFFICES irn EAST FEGAN 1ST FLOOR MESSHALL 2ND FLOOR STAFF HOUSING on TRANSPORTATION 4 HR (MOHAN HALL) cm ACADEMIC BUILDING 500 im ACADEMIC BUILDING 800 r^n LIBRARY rsi STAFF HOUSING r?n STAFF HOUSING I 381 SCIENCE BUILDING I 391 FACULTY APARTMENTS on CHAPEL im RECREATION HALL 4 STORE rm PRESOENT'S RESCENCE ITTI ATHLETIC FACILITY [TB STORAGE/VREA im EXISTNG PARKING LOT Fi5| EXIST NG PARKING LOT [pTil EXISTMG PARKING LOT EXISTNG PARKING LOT I S-l I EXISTNG SPORT COURT LEGEND EXISTING PROPERTY LINE PROPOSED PROPERTY LINE EXISTING TO BE REMOVED CURRENT PHASE DEMOISION n COMPLETED PARKING LOT GENERAL NOTES 11 BASIC BULDING LOCATIONS VWIL B£ APPROVED WITH THIS PLAN VARIATONS TO EXACT BULDING CONFIGURATION MAY OCCUR DURING SUBSEQUENT APPROVALS 2) PROPOSED PHASINGOR DEP MAY CHANGE AS DETERMNED BY ARMY AND NAVY ACADEMY. HS DGE Mark T. House John Dodge •nOkMC* otm ©2005 - 2008 House 4 Dodge Design. Inc PRELIMINARY NOT FOR CONSTRUCTION SCALE-N.T.S. DATE- PHA6II« EXHIBIT A1.09 PHASE 10 SCOPE OF WORK ED [SD M\ m [on [cn Ion m m [H NEW CADET STORE RECREATION H.HX - REMODELED HEALTH CENT REMODELED NEWBRIDGE NEWDORMirOIIY NEWDORMirOliV ANDERSON HAI L - ADDITION / REMODEL CREAN HALL - ADDITION / REMOLJEL NEW AUDITORIUM 4 MUSC DEPARTMENT NEW ACADEMIC BU LDING Ml m EI] [M3 [pn [ED [pn |pn ES [pn (pn NEW SCIENCE BUILDING NEWART DEPARTMENT - REMODEL NEWAMPHITHEATER NEW STAFF HOUSING STAFF PARKING BELOWP-8 (18 SPACES) NEW STAFF HOUSING STAFF PARKING BELOWP-9 (18 SPACES) NEW MAINTENANCE FACILITIES BUILDING PARKING LOTATBLDG. M-1 (39 SPACES) PARKING LOT AT BLDG M-1 (8 SPACES) PARKING LOT AT BLDG 8-2 (16 SPACES) PARKING LOT AT BLDG A-1 (30 SPACES) PARKING LOT AT BLDG E-1 (31 SPACES) PARKING LOTATBLDG H-1 (6 SPACES) PARKING LOTATBLDG H-1 (18SPACES) (PARKING AT GRADE 2 STORY STAFF HOUSING ABOVE ) PARKING LOT At BLDG H-2 (18 SPACES) (PARKING AT SR/VDE 1 STORY STAFF HOUSING /VBOVE) NEWATHLETIC FACILITY NEW BUILDINGS NEW SPORTS COURT - BASKETBALL ON SITE PARKING CAPACITY EXISTING BUILDINGS m FACILITES MANAGEMENT m ACADEMIC BUILDING 400 I 3 I HOOVER HALL rm ANDERSON HALL |~n McLENDON HALL rel MclNTOSH HALL |~n AC/VDEMIC BUILDING 300 [J2 LEWIS HALL I 9 I CREAN HALL I 10 I ATKINSON HALL [TTl TAC COUNSELING CENTER rm OPERATIONS OFFICE I 13 I ACADEMIC BUILDING IOO im DAVIS HALL 1ST FLOOR AUDITORIUM/GYM 2ND FLOOR " EXECUTIVE OFFICES rm ACADEMIC OFFICES rW\ BAND ROOM [771 COTTAGE NO 1 I 16 I COMMANDANT'S OFFICE on SUMMER PROGRAMS I 201 COTTAGE NO. 3 [Til COTTAGE NO 4 \JB COTTAGE NO 5 cm MLLER HALL on MUSEUM nn COTTAGE NO 6 4 7 I 261 COMMAND 4 TAC rm BUSINESS OFFICE on 1ST FLOOR HEALTH CENTER 2ND FLOOR ; WEST FEGAN r29l DEVELOPMENT, ALUMNI/VND ATHLETIC OFFICES f30l 1ST FLOOR MESSH/VLL 2ND FLOOR : ADMISSIONS 4 PARENT AFFAIRS OFFICES rm EAST FEGAN 1ST FLOOR MESSHALL 2ND FLOOR STAFF HOUSING rm TRANSPORTATION 4 HR (MOHAN HALL) cm ACADEMIC BUILDING 500 on ACADEMIC BUILDING 800 cm LIBRARY rW\ STAFF HOUSING I 37 I STAFF HOUSING Ilal SCIENCE BUILDING cm FACULTY APARTMENTS on CHAPEL rrn RECREATION HALL 4 STORE on PRESIDENT'S RESIDENCE r43l ATHLETIC FACILITY r471 STORAGE AREA [FSI EXISTING PARKING LOT |P ID| EXISTNG P/VRKING LOT |P.ll| EXIST ING PARKING LOT |p72l EXISTNG PARKING LOT I S.11 EXISTING SPORT COURT LEGEND EXISTING PROPSRTY LINE PROPOSED PROPERTY LINE EXISTING TO BE REMOVED CURRENT PHASE DEMOISION COMPLETED BUILDING CONSTRUCTION COMPLETED PARKING LOT GENERAL NOTES 1) BASIC BU ILDING LOCATIONS WILL BE APPROVED WITH THIS PIA.N VARIATIONS TO EXACT BUIDING CONFIGURATION MAY OCCUR CXIRING SUBSEQUENT APPROVALS 2) PROPOSED PH/VSING ORDER MAY CHANGE AS DETERMNED BY ARMY AND NAVY ACADEMY. HS DGE Mark T. House John Dodge M0 4* A«« •nOlMCA OMM ML ..enulhli'M InwMgi wid v«ev PMmMon olHMw A Dong. 0.491. ©2005 - 2008 House 4 Dodge Design. Inc PRELIMINARY NOTFOR CONSTRUCTION 8CALE-N.T.S. DATB Ol-CJ^-Od PHA6IN* EXHIBIT A1.10 PHASE 11 SCOPE OF WQRK DEMO COTTAGE NO 5 (BULDING NO 22) DEMO MILLER HALL (BUILDING NO 33) BUILD NEWDINING HALL. COMMANDANT'S OFFICE, OPERATIONS & IT DEPARMENT (BUILDING NO A-2) ED [An ED [on [Pn Ion NEW CADET STORE RECREATION HAa - REMODELED HEALTH CENT REMODELED NEWBRIDGE NEWOORMITORY NEWDORMITOR" ANDERSON HALL - ADDITON / REMODEL CRE/VN HALL - ADDITION / REMODEL NEW/VJDITORIUM 4 MUSC DEPARTMENT NEWACAOEMIC BU LDING [En IMl [Ea [M3 [EI] [M] [pn [M] [ED [pn NEW SCIENCE BUILDING NEWART DEPARTMENT - REMODEL NEWAMPHITHEA,TER NEW STAFF HOUSING STAFF PARKING BELOWP-8 (18 SPACES) NEW STAFF HOUSING STAFF PARKING BELOW P-g (18 SP/V;ES) NEW MAINTENANCE FACIL ITIES BUILDING PARKING LOT AT BLDG. M-l (39 SPACES) PARKING LOT AT BLDG M-1 [8 SPACES) PARKING LOT AT BLDG S-2 (16 SPACES) PARKING LOTAT BLDG Arl [30 SPACES) PARKING LOTATBLDG. E-1 (31 SPACES) PARKING LOT AT BLDG. H-1 (8 SPACES) PARKING LOT AT BLDG H-1 (18 SPACES) [PARKING AT GRADE 2 STORY STAFF HOUSMG ABOVE ) PARKING LOT AV BLDG H-2 (18 SPACES) [PARKING AT GRADE 1 STORY STAFF HOUSMG ABOVE) NEW BUILDINGS EXISTING BUILDINGS cn •D cn CD nn cn m CD cn rm UB UB UB rm rm rm on on rm \M nn m cm cm on cm DD on on on on cm cm cm cm cm on cm cm on rm on on rm EH Fio) Ea Em [ID FACILITES MANAGEMENT ACADEMIC BUILDING 400 HOOVER HALL ANDERSON HALL MdENDON HALL MclNTOSH HALL ACADEMIC BUILDING 300 LEWIS HALL CREAN HALL ATKINSON HALL TAC COUNSELING CENTER OPERATIONS OFFICE ACADEMIC BUILDING 100 DAVIS HAa 1ST FLOOR . AUDITORIUM/ GYM. 2ND FLOOR : EXECUTIVE OFFICES ACADEMIC OFFICES BAND ROOM COTTAGE NO 1 COMMANDANT'S OFFICE SUMMER PROGRAMS COTTAGE NO 3 COTT ACE NO. 4 COTTAGE NO 5 MLLER HALL MUSEUM COTTAGE NO SS7 COMMAND 4 TAC BUSINESS OFFICE 1ST FLOOR MESS HALL 2ND FLOOR : ADMISSIONS 4 PARENT AFFAIRS OFFICES EAST FEG/VN 1ST FLOOR MESSH/VLL 2ND FLOOR STAFF HOUSING TRANSPORTATION iHR (MOH/VN HALL) /VCADEMIC BUILDING 500 ACADEMIC BUILDING 800 LIBRARY STAFF HOUSING STAFF HOUSING SCIENCE BUILDING FACULTY APARTMENTS CHAPEL RECREATION HALL 4 STORE PRESDENTS RESIDENCE ATHLETIC FACILITY STORAGE AREA EXISTNG PARKING LOT EXISTNG PARKING LOT EXISTNG PARKING LOT EXISTNG P/VRKING LOT EXISTNG SPORT COURT LEGEND EXISTING PROPERTY LINE PROPOSED PROPERTY LINE EXISTING TO BE REMOVED CURRENT PHASE DEM OIS ION COMPLETED PARKING LOT GENERAL NOTES 1) BASIC BU LDING LOCATIONS Wia BE APPROVED WITH THIS PLAN VARIATIONS TO EXACT BUIDING CONFIGURATION MAY OCCUR DURING SUBSEQUENT APPROVALS 2) PROPOSED PHASING OR DER MAY CHANGE .AS DETERMNED BY ARMY AND NAVY ACADEMY. REVHNONS- HS DGE Mark T. House John Dodge MOW AM, nOtooobCM Itm ©2005 - 2008 House 4 Dodge Destgn. Inc 6 PRaiMINARY NOT FOR CONSTRUCTION SCALE-N.T.S. DATB- PHASIhJ* EXHIBIT A1.11 PHASE 12 SCOPE OF WORK DEMO TAC COUNSELING CENTER (BULDING NO 11) REMODEL DAV IS HALL (BU LDING NO 14) S-5 OPERATIONS DlAY STUDENT FACILITIES OTHER ED IAD [SH [Pn [w] m m NEW CADET ST3RE RECREATION H/Va - REMODELED HEALTH CENTI REMODELED NEWBRIDGE NEWDORMTTORY NEWDORMTTOBV /VNDERSON HALL - /VODITION / REMODEL CREAN HALL - ADDITION / REMODEL NEW AUDITORIUM 4 MUSC DEPAfiTMENT NEWACAOEMIC BULDING [En m [M3 [pn [^ ipn IB] m [Ea [EH m NEW SCIENCE BUILDING NEWART DEPARTMENT - REMODEL NEWAMPHTTHEATER NEW STAFF HOUSING STAFF PARKING BELOWP-8 (18 SPACES) NEW ST/VFF HOUSING STAFF PARKING BELOWP-9 (18 SPACES) NEW MAINTENANCE FACLITIES BUILDING PARKING LOTATBLDG M-1 [39 SPACES) PARKING LOTATBLDG M-1 [3 SPACES) PARKING LOT AT BLDG S-2 (16 SPACES) PARKING LOTATBLDG Arl [30 SPACES) PARKING LOTAT BLDG E-1 [31 SPACES) PARKING LOT AT BLDG. H-1 (8 SPACES) PARKING LOTAT BLDG H-1 (18 SPACES) (PARKING AT SRADE 2 STORY STAFF HOUSMG ABOVE ) PARKING LOTATBLDG H-2 (18 SPACES) [PARKINS AT SRADE 1 STORY STAFF HOUSING ABOVE) NEWATHLETIC i= ACILITY NEW BUILDINGS NEW SPORTS COURT - BASKETBAa EXISTING BUILDINGS rm FACILITES MANAGEMENT m ACADEMIC BUILDING 400 m HOOVER HALL n~l ANDERSON HALL m McLENDON HALL cn MclNTOSH HALL rn ACADEMIC BUILDING 300 cn LEWIS HALL cn CREAN HALL rm ATKINSON HALL rm TAC COUNSELING CENTER rm OPERATIONS OFFICE rm ACADEMIC BUILDING 100 rm DAVIS HAa 1ST FLOOR AUDITORIUM/ GYM 2ND aOOR • EXECUTIVE OFFICES rm ACADEMIC OFFICES nn BAND ROOM on COTTAGE NO I rm COMMANDANT'S OFFICE rm SUMMER PROGRAMS on COTTAGE NO 3 im COTTAGE NO 4 nn COTTAGE NO S cm MLLER HALL on MUSEUM on COTTAGE NO 6 4 7 on COMMAND 4 TAC HfTI BUSINESS OFFICE cm 1ST FLOOR HEALTH CENTER 2ND FLOOR : WEST FEGAN r29l DEVELOPMENT, ALUMNI/VND ATHLETIC OFFICES on 1ST FLOOR MESSHALL 2ND FLOOR ' ADMISSIONS 4 PARENT AFFAIRS OFFICES cm EAST FEGAN 1ST FLOOR MESSH/VLL 2N0 FLOOR STAFF HOUSING on TRANSPORTATION 4 HR (MOHAN HALL) cm ACADEMIC BUILDING 500 nn ACADEMIC BUILDING 800 cm LIBR/VRY del STAFF HOUSING oa ST/VFF HOUSING cm SCIENCE BUILDING on FACULTY APARTMENTS rm CHAPEL 1411 RECREATION HALL 4 STORE on PRESIDENT'S RESIDENCE 1431 ATHLETIC FACILITY rm STORAGE/VREA En EXISTING PARKING LOT |P-lO| EXISTING PARKING LOT Fn EXISTING PARKING LOT Fi;) EXISTING PARKING LOT cm EXISTING SPORT COURT LEGEND EXISTING PROPERTY LINE PROPOSED PROPERTY LINE EXISTING TO BE REMOVED CURRENT PHASE DEMOISION COMPLETED PARKING LOT GENERAL NOTES 1) BASIC BU ILDING LOCATIONS WILL BE APPROVED WITH THIS PLAN VARIATIONS TO EXACT BULDING CONFIGURATION MAY OCCUR (XIRING SUBSEQUENT APPROVALS 2) PROPOSED PHASING ORDER MAY CHANGE ,AS DETERMNED BY ARMY AND NAVY ACADEMY. HS DGE Mark T. House John Dodge •MDkMCA itm •• MM «M iH agM ropMorlM kl ©200S-2008 Houss & Dodge Dssiyn, Inc PRaiMINARY NOTFOR CONSTRUCTION SCALE-N.T.S. DATE-oi-ofl-oe PHASING EXHIBIT A1.12 PHASE 13 SCOPE OF WORK DEMO MclNTOSH HALL (BUILDING NO 8) DEMO LEWIS HALL (BUILOING NO 8) BUILD NEWAMPHITHEATER (£-7) BUILD NEWAUDITORIUM 4 MUSIC DEPARTMENT (E-1) [Ei] [Sl [An [An \M [on icn [pn [Ei] NEW CADET STORE RECREATION HAa - REMODELED HEALTH CENT REMODELED NEWBRIDGE NEW DORMtrOR !• NEWDORMITORV ANDERSON HALL - ADDITION / REMODEL CREAN HALL • ADDITION / REMODEL NEWAUDITORIUM 4 MUSC DEPARTMENT NEWACAOEMIC BULDING [En m [EI] [MJ] [pn [Ol [pn [pn [ED [pn [M] NEW SCIENCE BUILDING NEWART DEPARTMENT - REMODEL NEWAMPHITHEATER NEW STAFF HOUSING STAFF PARKING BELOW P-3 (18 SPACES) NEW STAFF HOUSING STAFF PARKING BELOWP-9 (18 SPACES) NEWM/VINTENANCE FACILITIES BUILDING PARKING LOT AT BLDG M-1 [39 SPACES) PARKING LOT AT BLDG M-1 [8 SPACES) PARKING LOT AT BLDG S-2 [16 SPACES) PARKING LOTATBLDG Arl [30 SPACES) PARKING LOTATBLDG E-1 (31 SPACES) PARKING LOT AT BLDG. H-1 (8 SPACES) PARKING LOT AT BLDG H-1 (18 SPACES) (PARKING AT GRADE 2 STORY STAFF HOUSING ABOVE ) P/VRKING LOT AT BLDG H-2 (18 SPACES) (PARKMG AT GRADE 1 STORY STAFF HOUSING ABOVE) NEWATHLETIC FACILITY NEW BUILDINGS NEW SPORTS COURT - BASKETBALL EXISTING BUILDINGS [T] cn cn cn CD [n IJD cn cn riol on on on rm UB rm rm on rm on cm oa cm on nn cm rm on nn on rm nn im rm cm cm rm cm on rm rm rm rm on EH Fioi [En [pn [ID FACILffES MANAGEMENT AC/VDEMIC BUILDING 400 HOOVER HALL ANDERSON HALL McLENDON HALL MclNTOSH HALL ACADEMIC BUILDING 300 LEWIS HALL CREAN HALL ATKINSON HALL TAC COUNSELING CENTER OPERATIONS OFFICE ACADEMIC BUILDING 100 DAVIS HAa 1ST FLOOR AUDITORIUM/GYM. 2ND FLOOR ' EXECUTIVE OFFICES AC/VDEMIC OFFICES BAND ROOM COTTAGE NO I COMMANDANT'S OFFICE SUMMER PROGRAMS COTTAGE NO. 3 CO n AGE NO 4 COTTAGE NO 5 MLLER HALL MUSEUM CO FT AGE NO 8 4 7 COMMAND 4 TAC BUSINESS OFFICE 1ST FLOOR MESSHALL 2ND FLOOR- ADMISSIONS 4 PARENT AFFAIRS OFFICES EAST FEGAN 1ST FLOOR MESSHALL 2ND FLOOR STAFF HOUSING TRANSPORTATION 4 HR (MOH/VN HALL) ACADEMIC BUILDING 500 ACADEMIC BUILDING 800 LIBR/VRY STTAFF HOUSING STAFF HOUSING SCIENCE BUILDING FACULTY APARTMENTS CHAPEL RECREATION HALL S STORE PRESIDENT'S RESIDENCE ATHLETIC FACILITY STORAGE AREA EXISTING PARKING LOT EXISTING PARKING LOT EXISTING PARKING LOT EXISTING PARKING LOT EXISTING SPORT COURT LEGEND EXISTING PROPERTY LINE PROPOSED PROPERTY LINE EXISTING TO BE REMOVED CURRENT PHASE DEMOISION COMPLETED PARKING LOT GENERAL NOTES 1) BASIC BU ILDING LOCATIONS WILL BE APPROVED WITH THIS PLAN VARIATIONS TO EXACT BULDING CONFIGURAT ION MAY OCCU R DUR ING SUBSEQUENT APPROVALS 2) PROPOSED PHASING OR DER MAY CHANGE .AS DETERMNED BY ARMY AND NAVY ACADEMY. REVMIONSi HS DGE Mark T. House John Dodge •nOha^CA tem on.ior.Mn ph iy~M><er.« 0«t, .«0<J n. U bvMMgt Md Mflv) ©2005 - 2008 House 4 Dodge Design. Inc i PRELIMINARY NOT FOR CONSTRUCTION SCALE-N.T.S, DATB PHASING EWIBIT A1.13 PHASE 14 SCOPE QF WORK BUILD NEWMAINTEN/VNCE FACILITIES BUILDING (BUILDING NO M-1) BUILD NEWPARKING LOT P-2 REMODEL BANO ROOM AT DAVIS HALL INTO HEALTH CENTER (BUILDING NO A-5) NEW BUILDINGS [An NEWADMISSION,S SADMINISTRATION BUILDING [An NEW DIN ING HALL, COMMAND/VNT-S OFF ICE, OPERATIONS 4 IT DEPARTMENT IXn NEW CADET STORE [An RECREATION HAa - REMODELED [ASI HEALTH CENTER AT DAVIS HALL • REMODELED [Sn NEWBRIDGE [Sn NEWDORMITORV IPn NEWDORMITORV [on ANDERSON HALL-AODrTION/REMODEL I&4I CRE/VN HALL - ADDITION / REMODEL [in NEWAUDITORIUM 4 MUSC DEPARTMENT im NEWACAOEMIC 3ULDING [En NEW ACADEMIC/LIBRARY BUILDING 4 WEST TOWER [En ATKNSON HALL REMODEL TO CLASSROOMS [in NEW SCENCE BUILDING [En NEWART DEPARTMENT-REMODEL [En NEWAMPHITHEATER IH-Il NEW STAFF HOUSING STAFF PARKING SELOWP-8 (18 SPACES) [Sn NEW ST/VFF HOUSING STAFF P/VRKING BELOWP-9 (18 SPACES) IfcTTl NEW M/UNTENANCE FACIL ITIES BUILDING [pn PARKING LOT AT BLDG M-1 (39 SPACES] [pn PARKING LOT AT BLDG M-1 (8 SPACES) [pn PARKING LOT AT BLDG s-2 (16 SPACES) [pn PARKING LOT AT BLDG A-1 (30 SPACES) [pn PARKING LOT AT BLDG E~1 (31 SPACES) [pn PARKING LOT AT BLDG. H-1 (8 SPACES) [pn PARKING LOT Al BLDG H-1 (18 SPACES) [PARKMG AT GRADE 2 STORY STAFF HOUSING ABOVE ) [Pn PARKING LOT AT BLDG H-2 (18 SPACES) (PARKING AT GR/VDE 1 STORY ST/VFF HOUSING ABOVE) [sn NEWATHLETIC FACILfTY [sn NEWPOOLLOCKER ROOMSAND BLE/VCHERS [^ NEW SPORTS COURT-BASKETBALL [in DAY STUDENT CENTER AT DAVIS HAa- REMODEL ON SITE PARKING CAPACITY DORMITORY CAPACITY EXISTING BUILDINGS I 1 I FACILITES MANAGEMENT cn AC/VDEMIC BUILDING 400 I 3 I HOOVER HALL m ANDERSON HALL m McLENDON HALL I 6 I MclNTOSH HALL I 7 I ACADEMIC BUILDING 300 cn LEWIS HALL l~9~l CREAN HALL rm ATKINSON HALL rm TAC COUNSELING CENTER rm OPERATIONS OFFICE rm ACADEMIC BUILDINO 100 I 14 I DAVIS HALL 1ST FLOOR. AUDITORIUM/GYM. 2ND FLOOR' EXECUTIVE OFFICES rm ACADEMIC OFFICES [3n BAND ROOM rm COTT/VGENO 1 I 181 COMMANDANT'S OFFICE rm SUMMER PROGRAMS cm COTTAGE NO 3 rm COTT/VGENO 4 oa COTTAGE NO 5 UB MILLER HALL cm MUSEUM cm COTTAGE NO 8 4 7 cm COMMAND 4 TAC rm BUSINESS OFFICE cm 1ST FLOOR HEALTH CENTER 2ND FLOOR ; WEST FEGAN on DEVELOPMENT, ALUMNI AMD ATHLETIC OFFICES cm 1ST FLOOR MESSHALL 2ND FLOOR : ADMISSIONS S PARENT AFFAIRS OFFICES I 311 EAST FEGAN 1ST FLOOR MESSHALL 2ND FLOOR STAFF HOUSING cm TRANSPORTATION 4 HR (MOHAN HALL) I 33 I AC/VDEMIC BUILDING 500 on AC/VDEMIC BUILDING 800 I 351 LIBRARY nn STAFF HOUSING I 37 I STAFF HOUSING I 38 I SCIENCE BUILDING I 391 FACULTY APARTMENTS rm CHAPEL rm RECREATION HALL 4 STORE 1421 PRESIDENT'S RESIDENCE 143 1 ATHLETIC FACILITY UB STORAGE/VREA EXISTING PARKING LOT Fio] EXISTING PARKING LOT [pm EXISTING PARKING LOT Fm EXISTING PARKING LOT rin EXISTING SPORT COURT LEGEND EXISTING PROPERTY LINE PROPOSED PROPERTY LINE EXISTING TO BE REMOVED CURRENT PHASE DEMOISION COMPLETED PARKING LOT GENERAL NOTES 1) BASIC BUILDING LOCATIONS wia BE APPROVED WITH THIS PLAN VARIATIONS TO EXACT BULDING CONFIGURATION MAY OCCUR DURING SUBSEQUENT APPROVALS 21 PROPOSED PHASING OR DER MAY CHANGE .AS DETERM WED BY /VRMY AND NAVY ACADEMY. REVHNONSi HS DGE Mark T. House John Dodge ©2005-2008 Houss & Dodgs Design, Inc ^ SI OS PRELIMINARY NOT FOR CONSTRUCTION SCALE-N.T.S. DATB PHASING EXHIBIT A1.14 PHASE 15 SCOPE QF WORK DEMO EXISTING MAINTENANCE FACLITIES BUILOING (BULDING NO 1) r;EMO WEST FEGAN (BUILDINGSNO 28 4 28) DEMO EAST FEGAN (BUILDINGS NO 31. 32. 4 33) DEMO EXISTING MESSHALL (BULDING NO 30) BUILD NEW PARKING LOT P-4 BUILD NEW ADMISSIONS 4/VDMINISTRATION BUILDING (BULDING NO A,1) EU [Ml \M lAn \M [on icn Ion isn m m m NEW CADET STORE RECREATION HAa - REMODELED HEALTH CENT REMOCELED NEW BB DOE NEWIXlRMirORY NEWDORMITORV ANOeRSOH HALL - /VDDITION / REMODEL CREAN HALL - ADDITION / REMODEL NEWAUDITORIUM 4 MUSC DEPARTMENT NEWACAOEMIC BUIDING lEn m ED [pn [pn [pn ipn [HI [pn [M] NEW SCHNCE a/ILDING NEWART DEP/VRTMENT - REMODEL NEWAMPHITHEATER NEW STAf F HOUSING STAFF P/VRKING BELOWP-9 (18 SP/VCES) NEW MAINTENANCE FACLITIES BUILDING PARKING LOTATBLDG M-1 [39 SPACES) PARKING LOT AT BLDG M-1 (8 SPACES) PARKING LOT AT BLDG S-2 (16 SPACES) PARKING LOT AT BLDG /V-1 (30 SPACES) PARKING LOT AT BLDG. E-1 (31 SPACES) PARKING LOT AT BLDG H-1 (6 SPACES) PARKING LOT AT BLDG H-1 (18 SPACES) (PARKNG AT SRADE 2 STORY STAFF HOUSNG ABOVE ) PARKING LOT AT BLOG H-2 (18 SPACES) [PARKNG AT GR/VDE 1 STORY STAFF HOUSNG ABOVE) NEWATHLETIC FACILITY NEW BUILDINGS NEW SPORTS COURT - BASKETBAa EXISTING BUILDINGS cn cn cn CD CD cn cn cn rm on on on rm rm rm un rm rm on cm on cm nn cm im rm cm cm cm 03 cm on cm cm cm rm cm on on on on rm fpm Fi5| Ea El FACILITES MANAGEMENT ACADEMIC BUILDING 400 HOOVER H/VLL ANDERSON HALL McLENDON HALL MclNTOSH HALL ACADEMIC BUILDING 300 LEWIS HALL CREAN HALL ATKINSON HALL TAC COUNSELING CENTER OPERATIONS OFFICE ACADEMIC BUILDING 100 DAVIS H/va ISTFLOOR AUDITORIUM/GYM 2ND FLOOR ' EXECUTIVE OFFICES AC/VDEMIC OFFICES BAND ROOM COTTAGE NO 1 COMMANDANT'S OFFICE SUMMER PROGRAMS COTTAGE NO. 3 COTTAGE NO 4 COTTAGE NO 5 MLLER HALL MUSEUM COTTAGE NO 6 4 7 COMMAND 4 TAC BUSINESS OFFICE ISTFLOOR MESSHALL 2ND FLOOR ADMISSIONS 4 PARENT/VFFAIRS OFFICES EAST FEG/VN ISTFLOOR MESSHALL 2ND FLOOR STAFF HOUSING TRANSPORTATION 4 HR (MOHAN HALL) ACADEMIC BUILDING 500 ACADEMIC BUILDING 800 LIBR/VRY STAFF HOUSING STAFF HOUSING SCIENCE BUILDING FACULTY APARTMENTS CHAPEL RECREATION HALL 4 STORE PRESIDENT'S RESIDENCE ATHLETIC FACILITY STORAGE AREA EXISTNG PARKING LOT EXISTNG PARKING LOT EXISTMG PARKING LOT EXISTMG PARKING LOT EXISTMG SPORT COURT LEGEND EXISTING PROPER I'Y LINE PROPOSED PROPERTY LINE EXISTING TO BE REMOVED CURRENT PHASE DEMOISION COMPLETED PARKING LOT GENERAL NOTES 1) BASIC BU LDING LOCATIONS WILL BE /VPPROVED WITH THIS PLAN VARIATIONS TO EXACT BULDING CONFIGURAT CN MAY OCCUR DURING SUBSEQUENT APPROVALS 2) PROPOSED PHASING OR DER MAY CHANGE .AS DETERMNED BY ARMY /VND NAVY ACADEMY. REVKMONS- HS DGE Mark T. House John Dodge •niattifcCA ttm ©2005-2008 House 4 Dodge Design. Inc Q i 1 PRELIMINARY NOTFOR CONSTRUCTION SCALE-N.T.S. DATB oi-o^-oe PH/^sl^46 EXHIBIT A1.15 NEW BUILDINGS PHASE 16 [EH EH [Ml [An NEW CADET STORE RECREATION HAa - REMODELED HEALTH CENT REMODELED NEWBRIDGE NEWDORMITORV NEWDORMITORV ANDERSON H/VLL - /VODITION / REMODEL CREAN HALL - ADDITION / REMODEL NEWAUDITORIUM 4 MUSC DEPARTMENT NEWACAOEMIC BULDING NEW SCENCE BUILDING NEWART DEPAfiTMENT - REMODEL NEWAMPHITHEATER NEW STAFF HOUSING STAFF PARKING BELOWP-8 (18 SPACES) NEW STAFF HOUSING STAFF PARKING 8EL0WP-9 (18 SP/VCES) NEW MAINTENANCE FACL ITIES BUILDING PARKING LOT AT BLDG M-1 (39 SPACES) PARKING LOT AT BLDG M-1 (3 SPACES) PARKING LOT AT BLDG S-2 (16 SPACES) PARKING LOT AT BLDG A-1 [30 SPACES) PARKING LOT AT BLDG E-1 (31 SP/VCES) PARKING LOT AT BLDG H-1 (6 SPACES) EXISTING BUILDINGS I I I FACILITES M/VN/VGEMENT I 2 I /VCADEMIC BUILDING 400 m HOOVER HALL cn /VNDERSON HAa m McLENDON HALL I 6 I MclNTOSH H/VLL I 7 I ACADEMIC BUILDING 300 rm LEWIS HALL I 9 I CREAN HALL I 10 I ATKINSON HALL rm TAC COUNSELING CevTER rm OPERATIONS OFFICE I 13 I ACADEMIC BUILDING 100 rm DAVIS HAa ISTFLOOR AUDITORIUM/GYM 2N0 FLOOR EXECUTIVE OFFCES rm ACADEMIC OFFICES I 16 I BAND ROOM 117 1 COTT/VGENO 1 rm COMMANDANT'S OFFICE rm SUMMER PROGRAMS cm COTTAGE NO 3 I 21 I COTTAGE NO 4 I 221 COTT/VGENO 5 on MLLER H/VLL on MUSEUM on COTT AUE NO 6 S 7 cm COMMAND STAC QT] BUSINESS OFFICE cm ISTFLOOR HEALTH CENTER 2ND FLOOR . WEST FEG/VN on DEVELOPMENT./VLUMNI AND ATHLETIC OFFICES cm ISTFLOOR MESSHALL 2ND FLOOR ' ADMISSIONS 4 PARENT AFF/VIRS OFFICES rm EAST FEGAN ISTFLOOR MESSHALL 2ND FLOOR STAFF HOUSING 1321 TRANSPORTATION 4 HR (MOHAN HALL) I 331 ACADEMIC BUILDING 500 on ACADEMIC BUILDING 800 I 351 UBRARY I 361 STAFF HOUSING on STAFF HOUSING I 381 SCIENCE BUILDING nn FAOJLTY AP/VRTMENTS 1401 CHAPEL I 411 RECREATION HALL S STORE rm PRESDENTS RESDENCE 1431 ATHLETIC FACILITY UB STOR/VGE/VREA fpm EXISTMG PARKING LOT |P-IO| EXISTNG P/VRKING LOT |P-li| EXISTNG PARKING LOT Fial EXISTNG PARKING LOT I S-11 EXISTING SPORT COURT LEGEND EXISTING PROPERTY LINE PROPOSED PROPERTY LINE EXISTING TO BE REMOVED CURRENT PHASE DEMOISON COMPLETEO PARKING LOT GENERAL NOTES 1) BASIC BULDING LOCATIONS wia BE APPR OVED WITH THIS PLAN V/VRIATIONS TO EXACT BUIDING CONFIGURATION MAY OCCUR DURING SUBSEQUENT APPROVALS 2) PROPOSED PHASING OR DS! MAY CH/VNGE AS DETERMNED BY ARMY AND NAVY ACADEMY. HS DGE Mark T. House John Dodge tmmt^GA man on.oor.flon »h ©2005 - 2008 House 4 Dodge Design, Inc PRELIMINARY NOTFOR CONSTRUCTION SCALE-N.T.S. DATB PH/ASIN6 EXHIBIT A1.16 PHASE 17 SCOPE OF WORK BUILD NEW ACADEMIC BUILDING 7 LIBRARY 4 WEST TOWER (BUILDING NO E-3) BUILD BRIDGE (BUILIJING NO B-1) TO ATHLETIC FACILITY [BUILDING NO S-2) NEW BUILDINGS [An NEWAOMISSIONSSADMINISTRATION BUILDING (An NEWDINING HALL, COMMANDANTS OFFICE, OPERATIONS 4 IT OEPARTMBfT [An NEW CADET STORE [An RECREATION HALL - REMODELED [An HEALTH CENTER AT DAVIS HALL -REMODELED [&n NEWBRIDGE [^ NEWDORMITORV [Pn NEWDORMITORV Ion ANDERSON HALL - ADDITION / REM0I5EL Ion CREAN H/VLL-ADDITION/REMODEL [in NEWAUDITORIUM 4 MUSC OEPARTMENT NEWACAOEMIC BULDING IE-31 NEWACAOEMIC/LIBRARY BUILDING 4 WEST TOWER lEn ATK IN SON HALL - R EMODEL TO CLASSROOMS [in NEW SCIENCE BUILDING [En NEWART DEPARTMENT-REMODEL [En NEWAMPHITHEATER [Hn NEW STAFF HOUSING STAFF PARKING BELOWP-8 (18 SPACES) [Fin NEW ST/VFF HOUSING STAFF PARKING BELOWP-9 (18 SPACES) iMn NEW M/VINTENANCE FACL ITIES BUILDING [pn PARKING LOT AT BLDG. M-1 (39 SPACES) [pn PARKING LOT AT BLDG M-1 [3 SPACES) [pn PAR KING LOT AT BLDG 8-2(18 SPACES) [pn P/VRKING LOT AT BLDG Arl (30 SP/VCES) (EH PARKING LOTAT BLDG E~l (31 SPACES) [pn PARKING LOT AT BLDG. H-l (8 SPACES) [pn PARKING LOT AT BLDG H-1 (18 SPACES) (PARKNG AT GR,iOE 2 STORY STAFF HOUSMG ABOVE ) [Pn PARKING LOT AT BLDG H-2 (18 SPACES) (PARKINS AT GRADE 1 STORY STAFF HOUSING ABOVE') [m NEWATHLETIC FACILITY ISn NEW POOL LOCKER ROOMS/VND BLEACHERS [sn NEW SPORTS COURT - BASKETBAa [in DAY STUDENT CEN TER AT DAVIS HALL- REMODEL ON SITE PARKING CAPACITY DORMITORY CAPACITY EXISTING BUILDINGS DD cn cn cn m m cn cn cn on on on UB rm on on rm on rm on ED on cm on cm on rm cm cm cm 03 im cm cm cm nal on cm on on rm on on UB Fioj Ea [ID FACILITES MANAGEMENT ACADEMIC BUILDING 400 HOOVER HALL ANDERSON HALL McLENDON HALL MclNTOSH HALL ACADEMIC BUILDING 300 LEWIS HALL CREAN HALL ATKINSON HALL TAC COUNSELING CENTER OPERATIONS OFFICE ACADEMIC BUILDING 100 DAVIS HALL ISTFLOOR AUDITORIUM/GYM. JNO FLOOR : EXECUTIVE OFFICES ACADEMIC OFFICES BAND ROOM COTTAGE NO 1 COMMANDANT'S OFFICE SUMMER PROGRAMS COTTAGE NO 3 COTTAGE NO 4 COTTAGE NO 5 MLLER HALL MUSEUM COTTAGE NO 6 4 7 COMMAND S T/VC BUSINESS OFFICE ISTFLOOR MESSHALL 2ND FLOOR ' /VDM ISSIONS 4 PARENT AFFAIRS OFFICES EAST FEGAN ISTFLOOR MESSHALL 2ND FLOOR STAFF HOUSING TRANSPORTATION 4 HR (MOH/VN HALL) ACADEMIC BUILOING 500 /VCADEMIC BUILDING 800 LIBRARY STAFF HOUSING STAFF HOUSING SCIENCE BUILDING FAQJLTY /VP/VRTMENTS CHAPEL RECREATION HALL 4 STORE PRESOENT'S RESIDENCE ATHLETIC FACILITY STORAGE /VREA EXISTiNG P/VRKING LOT EXISTNG PARKING LOT EXISTNG PARKING LOT EXISTNG PARKING LOT EXISTNG SPORT COURT LEGEND EXISTING PROPERTY LINE PROPOSED PROPERTY LINE EXISTING TO BE REMOVED CURRENT PHASE DEM OIS ION COMPLETED PARKING LOT GENERAL NOTES 1) BASIC BULDING LOCATIONS wia BE APPROVED WITH THIS PLAN VARIATONS TO EXACT BULDING CONFIGURATION MAY OCCUR DURING SUBSEQUENT APPROVALS 2) PROPOSED PH/VSING ORDER MAY CHANGE .AS DETERMNED BY ARMY AND NAVY ACADEMY. HS DGE Mark T. House John Dodge aMOknCA ttm on.oor.Mra ph »•*»*.> ©2005 - 2008 House 4 Dodge Design, Inc PRaiMINARY NOT FOR CONSTRUCTION 8CALE-N.T.S. DATB PHA9IN6 EXHIBIT A1.17 PHASE 18 SCOPE OF WORK DEMO ART DEPARTMENT (BUILDING NO E-8) DEMO EXISTING LIR6ARY (BUILDING NO 35) DEMO EXISTING STAFF HOUSING (BUILDING NO BUILD NEWSTAFF HOUSNG (BUILDINS NO H-1) BUILD NEWPARKINS LOT P-7 BUILD NEWPARKING LOT P-8 ED [An \Mi \M \M ipn [M] Ion m [En NEW CADET STORE RECREATION HAa - REMODELED HEALTH CENT REMODELED NEWBRIDGE NEWDORMTTORY NEWDORMTTOBV ANDERSON H/VLL - AOOITION / REMODEL CRE/VN HALL - /VODITION / REMODEL NEWAUDITORIUM 4 MUSC DEPARTMENT NEWACAOEMIC BULDING [En m [ED [M3 [pn \M [pn [pn [ED [pn ipn NEW SCIENCE BJILDING NEWART DEPARTMENT - REMODEL NEWAMPHITHEATER NEW ST/VFF HOUSING STAFF PARKING BELOWP-8 (18 SP/VCES) NEWSTAFF HOUSING STAFF PARKING 8ELOWP-9 (18 SPACES) NEW M/VINTENANCE FACLITIES BUILDING PARKING LOT AT BLDG M-1 [39 SPACES) PARKING LOT AT BLDG M-1 [8 SPACES) PARKING LOT AT BLDG S-2 (16 SPACES) PARKING LOT AT BLDG Arl (30 SPACES) PARKING LOTATBLDG E-1 (31 SPACES) PARKING LOT AT BLDG H-1 (6 SPACES) PARKING LOT AT BLDG H-l (18 SPACES) (PARKMG AT GRAOE 2 STORY ST/VFF HOUSMG /VeOVE) PARKING LOTATBLDG H-2(18SPACES) (PARKING AT GRAOE ISTORY STAFF HOUSING ABOVE) NEWATHLETIC FACILITY NEW BUILDINGS NEW SPORTS COURT - BASKETBAa EXISTING BUILDINGS cn cn m cn CD cn CD cn cn Dn on oa UB on un rm un on rm cm on rm on on cm rm cm on on on on cm cm on rM nn cm cm rm nn rm on on EH [En EiU [ID F/VCILITES MANAGEMENT AC/VDEMIC BUILDINO 400 HOOVER HALL ANDERSON HALL McLENDON HALL MclNTOSH HALL ACADEMIC SUILOtNG 300 LEWIS HALL CRE/VN H/VLL ATKINSON HALL TAC COUMSELINC CENTER OPERATIONS OFFICC ACADEMIC BUILDiNG 100 DAVIS HJVa ISTFLOOR AUDITORIUM/GYM. 2ND FLOOR ' EXECUTIT* OFFICES ACADEMIC OFFICES BANO HOOM COTTAGE NO 1 COMMANCWNT'S OFFICE SUMMER PROGRAMS COTTAGE NO J COTTAGE NO 4 COTTAGE NO 5 MLLER HAa MUSEUM COnAGENO Si J COMMANDS T/VC BUSINESS OFFICE ISTFLOOR MESSHALL 2ND FLOOR : ADMISSIONS 4 PARENT AFFAIRS OFFICES EAST FEG/VN 1 ST FLOOR MESS HALL 2ND FLOOR . ST/VFF HOUSING TRANSPORTATION & HR (MOHAN HALL) ACADEMIC BUILDING 500 /VCADEMIC BUILDING 800 LIBRARY STAFF HOUSING ST/VFF HOUSING SCIENCE BUILDING FACULTY APARTMEffTS CHAPEL RECREATION HALL S STORE PRESDENTS RESDENCE ATHLETIC F/VCILITY STORAGE AREA EXISTING PARKING LOT EXISTNG PARKING LOT EXISTNG PARKING LOT EXISTNG PARKING LOT EXISTNG SPORT COURT LEGEND EXISTING PROPERTY LINE PROPOSED PROPERTY LINE EXISTING TO BE REMOVED CURRENT PHASE CEMOISION COMPLETED BUILDING CONSTRUCTION n COMPLETED PARKING LOT GENERAL NOTES 1) BASIC SU LDING LOCATIONS Wia BE /VPPROVED WITH THIS PLAN VARIATIONS TO EXACT BUIOING CONFIGURATON MAY OCCUR DURING SUBSEQUENT APPROVALS 2) PROPOSED PHASING OR (XR MAY CHANGE AS DETERMWED 3Y ARMY AND NAVY ACADEMY. HS DGE Mark T. House John Dodge •MOMtl^QA ttm ©2005 - 2008 House & Dodge Design, Inc PRELIMINARY NOT FOR CONSTRUCTION SCALE-KTA. OATB PH/ASIN* EXHIBIT A1.18 PHASE 19 SCOPE OF WORK REMODEL RECREATION HALL [BUILDING NO 41)/v-4 [An ED \M [An [Sl ED [sn Ion (13 ID NEW CADET STORE RECREATWN HAa - REMODELED HEALTH CENT REMODELED NEWBRIDGE NEWtXJRMTTORV NEWDORMITORV /VNDERSON H/VLL - /ADDITION / REMODEL CREAN HALL - ADDITION / REMODEL NEWAUDITORIUM 4 MUSC DEPARTMENT NEWACAOEMIC BULDING m (ED [^ m [Ol [pn [pn IS] [pn ipn NEW SCIENCE BUILDING NEWART DEPARTMENT • REMODEL NEW AMPHTTHEATER NEW STAFF HOUSING STAFF PARKING SELOWP-8 (18 -SP/VCES) NEW ST/VFF HOUSING STAFF PARKING BELOWP-9 (18 SP/VCES) NEW MAINTENA'^CE FACLITIES BUILDING PARKING LOTATBLDG M-1 [39 SPACES) PARKING LOT AT BLDG M-l (8 SPACES) PARKING LOT AT BLDG S-2 (16 SPACES) PARKING LOT AT BLDG Arl (30 SPACES) PARKING LOTATBLDG E-1 (31 SPACES) PARKING LOT AT BLDG. H-1 (6 SPACES) PARKING LOTATBLDG H-1 (18SP/VCES) (PARKING AT GRADE 2 STORY STAFF HOUSING ABOVE) PARKING LOT AT BLDG H-2 (18 SPACES) (PARKMG AT GRADE 1 STORY STAFF HOUSMG ABOVE) NEWATHLETIC FACILITY NEW BUILDINGS NEW SPORTS COURT - BASKETBAa ON SITE PARKING CAPACITY EXISTING BUILDINGS I 1 I FACILITES MANAGEMENT m ACADEMIC BUILDING 400 HOOVER H/VLL cn ANDERSON HALL m McLENDON HALL fTl MclNTOSH HALL f^ ACADEMIC BUILDING 300 rm LEWIS HALL rm CREAN HALL I 10 I ATKINSON HALL rm TAC COUNSELING CENTER rm OPERATIONS OFFICE I 13 I AC/VDEMIC BUILDING 100 rm DAVIS HALL 1ST FLOOR 2ND FLOOR : rm AC/VDEMIC OFFICES rm BAND ROOM rm COTTAGE NO 1 rm COMMANO/VNT'S OFFICE rm SUMMER PROGRAMS I 201 COTTAGE NO. 3 [Til COTTAGE NO. 4 on COTTAGE NO 5 nn MLLER HALL on MUSEUM cm COTTAGE NO 64 7 on COMMAND 4 TAC r?yl BUSINESS OFFICE [lal 1ST FLOOR HEALTH CENTER 2ND FLOOR : WEST FEGAN rm DEVELOPMENT./VLUMNI AND ATHLETIC OFFICES on ISTFLOOR MESSHALL 2ND FLOOR • ADMISSIONS S PARENT AFFAIRS OFFICES im EAST FEGAN ISTFLOOR MESSHALL 2ND FLOOR : STAFF HOUSING rm TRANSPORTATION 4 HR (MOHAN HALL) cm ACADEMIC BUILDING 500 on /VCADEMIC BUILDING 800 cm LIBRARY rm STAFF HOUSING rm STAFF HOUSING I 381 SCIENCE BUILDING I 39 I FACULTY APARTMENTS rm CHAPEL 1411 RECREATION HALL 4 STORE on PRESIDENT'S RESIDENCE 1431 ATHLETIC FACILITY rm STORAGE AREA [pm EXISTNG PARKING LOT [PTDI EXISTING PARKING LOT (Ea EXISTING PARKING LOT Fn EXISTING PARKING LOT rin EXISTING SPORT COURT LEGEND EXISTING PROPERTY LINE PROPOSED PROPERTY LINE EXISTING TO BE REMOVED CURRENT PHASE DEMOISION COMPLETED BUILDING CONSTRUCTION COMPLETED PARKING LOT GENERAL NOTES 1) BASIC BU ILDING LOCATIONS WILL BE APPROVED WITH THIS PLAN V/VRIATIONS TO EXACT BULDING CONFIGURATION MAY OCCUR (DURING SUBSEQUENT APPROVALS 2) PROPOSED PHASING OR DER MAV CHANGE ,AS DETERMMED BY ARMY /VND NAVY ACADEMY. REVMIONSi HS DGE Mark T. House John Dodge MoDMncA ttm on . OOy. 0979 ph ©2006 - 2008 House 4 Dodge Design. Inc PRELIMINARY NOTFOR CONSTRUCTION SCALE-N.T.S. DATB PH/«<SIN(& EXHIBIT A1.19 PHASE 20 SCOPE OF WORK DEMO EXISTING STAFF HOUSING (BUILDING NO 37) DEMO EXISTING SCIENCE BUILDNG (BULDING NO 38) DEMO EXISTINQ FACULTY APARTMENTS (BUILDING NO 39) BUILD NEWSTAFF HOUSNG (BUILDING NO H-2) BUILD NEWPARKING LOT NO P-9 EH ED [Ml [An Ml [SD \M [Pn IO m m Ml NEW CADET STORE RECREATION HALL - REMODELED HEALTH CENT REMODELED NEWBRIDGE NEWDORMITORV NEWDORMTTORV ANDERSON HALL - ADDITION / REMODEL CREAN HALL ADDITION / REMODEL NEWAUDITORIUM 4 MUSC DEPAfiTMENT NEWACAOEMIC BULDING [En m m [M3 Tn (ED (El (ED (ED Ml NEW SCIENCE BUILDING NEWART DEPARTMENT - REMODEL NEWAMPHTTHEATER NEW STAFF HOUSING STAFF PARKING BELOWP-8 (18 SPACES) NEW ST/VFF HOJSING STAFF PARKING BELOWP-9 (18 SPACES) NEW M/VINTENANCE FACLITIES BUILDING PARKING LOTATBLDG M-l [39 SPACES) PARKING LOT AT BLDG M-l [8 SPACES) PARKINC LOT AT BLDG S-2 [16 SPACES) PARKING LOT AT BLDG A-l [30 SPACES) PARKING LOT AT BLDG E-1 (31 SPACES) PARKING LOT AT BLDG. H-l (6 SPACES) PARKING LOTAT BLDG H-l (18 SPACES) (PARKING AT SRADE 2 STORY STAFF HOUSMG ABOVE) PARKING LOT AT BLDG H-2 (13 SP/VCES) (PARKING AT GR/VDE 1 STORY STAFF HOUSING ABOVE) NEWATHLETIC -ACILITY NEW BUILDINGS NEW SPORTS COURT - BASKETBALL ON SITE PARKING CAPACITY EXISTING BUILDINGS FACILITES MANAGEMENT cn ACADEMIC BUILDING 400 cn HOOVER HALL cn /VNDERSON HALL m McLENDON HALL |~6~| MclNTOSH HALL rn ACADEMIC BUILDING 300 cn LEWIS HALL cn CREAN HALL I 101 ATKINSON HALL rrn TAC COUNSELING CENTER rm OPERATIONS OFFICE im ACADEMIC BUILDING 100 rm DAVIS H/Va 1 ST FLOOR AUDITORIUM/ GYM. 2ND FLOOR I EXECUTIVE OFFICES rm AC/VDEMIC OFFICES on BAND ROOM rm COTT/VGENO I rm COMMANDANT'S OFFICE cm SUMMER PROGRAMS im COTTAGE NO. 3 [Til COTT/VGENO 4 oa COTTAGE NO 5 nn MLLER HALL on MUSEUM cm COTTAGE NO 6 « 7 on COMMAND 4 TAC rm BUSINESS OFFICE cm ISTFLOOR HEALTH CENTER 2N0 FLOOR : WEST FEGAN [291 DEVELOPMENT, ALUMNI/VND ATHLETIC OFFICES cm ISTFLOOR MESSHALL 2ND FLOOR i ADM ISSIONS 4 P/VRENT AFFAIRS OFFICES rm EAST FEGAN ISTFLOOR MESSHALL 2ND FLOOR ST/VFF HOUSING rm TRANSPORTATON 4 HR (MOHAN HALL) on /VCADEMIC BUILDING 500 on ACADEMIC BUILDING 800 cm LIBRARY im STAFF HOUSING on STAFF HOUSING cm SCIENCE BUILDING nn FACULTY/VP/VRTMENTS on CHAPEL imi RECREATION HALL 4 STORE rm PRESIDENT'S RESIDENCE rm ATHLETIC FACILITY rm STORAGE AREA fpm EXISTMG PARKING LOT [MOI EXISTNG PARKING LOT Fn EXISTNG PARKING LOT Fm EXISTNG PARKING LOT dD EXISTMG SPORT COURT LEGEND EXISTING PROPERTY LINE PROPOSED PROPERTY LINE EXISTING TO BE REMOVED CURRENT PHASE DEMOISION COMPLETED PARKINS LOT GENERAL NOTES 1) BASIC BU LDING LOCATIONS WALL BE APPROVED WITH THIS PLAN VARIATIONS TO EXACT BULDING CONFIGURATION MAY OCCUR DURING SUBSEQUENT APPROVALS 2) PROPOSED PHASING OR DER MAV CHANGE AS DETERMNED SY ARMY AND NAVY ACADEMY. HS DGE Mark T. House John Dodge Dht^cM ttm .oor.oon ph .tor.0077 la ©2005 - 2008 Hotjse 4 Dodge Design. Inc PRELIMINARY NOTFOR CONSTRUCTION SCALE-KTA. DATS PH/ASIN6 EXHIBIT A1.20 COMPLETE EH \M Ml Ml Ml ED [SH ipn [w] [En [51 NEW CADET STORE RECREATION HAa - REMODELED HEALTH CENT REMODELED NEWBRIDGE NEWDORMITORV NEWDORMTTORY ANDERSON HALL - ADDITION / REMODEL CREAN HALL - ADDITION / REMODEL NEWAUDITORIUM 4 MUSC DEPAfiTMENT NEWACAOEMIC BUIDING [En m [M3 Ml (M] Ml Ml Ml Ml NEW SCIENCE BUILDING NEWAfiT DEPARTMENT - REMODEL NEWAMPHTTHEATER NEW STAFF HOUSING STAFF PARKING BELOWP-3 (13 SPACES) NEW STAFF HOUSING STAFF PARKING BELOWP-9 (18 SPACES) NEW MAINTENANCE FACLITIES BUILDING PARKING LOT AT BLDG. M-1 (39 SPACES) PARKING LOTATBLDG M-1 [8 SPACES) PARKING LOT AT BLDG. S-2 (16 SP/VCES) PARKING LOT AT BLDG Arl (30 SPACES) PARKING LOT AT BLDG. E-1 (31 SPACES) PARKING LOTATBLDG H-1 (8 SPACES) PARKING LOTATBLDG H-1 (18SPACES) (PARKNG AT GR/VDE 2 STORY STAFF HOUSING ASOVE ) PARKING LOT AT BLDG H-2 (18 SPACES) (PARKING AT SRADE 1 STORY STAFF HOUSING ABOVE) NEWATHLETIC FACILITY NEW BUILDINGS NEW SPORTS COURT - BASKETBAa ON SITE PARKING CAPACITY EXISTING BUILDINGS cn F/VCILITES MANAGEMENT m ACADEMIC BUILDING 400 cn HOOVER HALL ANDERSON HALL m McLENDON HALL rm MclNTOSH HALL m ACADEMIC BUILDING 300 rm LEWIS HALL m CREAN HALL rm ATKINSON H/VLL rm TAC COUNSELING CENTER UB OPERATIONS OFFICE rm ACADEMIC BUILDING 100 rm DAVIS H/VLL ISTFLOOR. AUDITORIUM/GYM 2ND FLOOR : EXECUTIVE OFFICES rm ACADEMIC OFFICES rW\ BAND ROOM rJB COTTAGE NO 1 rm COMMANDANT'S OFFICE rm SUMMER PROGRAMS cm COTTAGE NO. 3 rm COTTAGE NO 4 cm COTTAGE NO 5 rm MLLER HALL on MUSEUM rm COTTAGE NO 6 4 7 on COMMAND 4 TAC [57] BUSINESS OFFICE on ISTFLOOR HEALTH CENTER 2ND FLOOR . WEST FEGAN rm DEVELOPMENT, /VLUMNI AND ATHLETIC OFFICES on ISTFLOOR MESSHALL 2N0 FLOOR ADMISSIONS 4 P/VRENT AFFAIRS OFFICES rm EAST FEGAN ISTFLOOR MESSHALL 2ND FLOOR STAFF HOUSING on TRANSPORTATION 4 HR (MOHAN HALL] on ACADEMIC BUILDING 500 rm ACADEMIC BUILDING 800 cm LIBR/VRY cm STAFF HOUSING on STAFF HOUSING rm SCIENCE BUILDING I 391 FACULTY AP/VRTMENTS rm CHAPEL rm RECREATION HALL 4 STORE rm PRESIDENT'S RESIDENCE 1431 ATHLETIC FACILITY rm STORAGE AREA EH EXISTING PARKING LOT Fi°1 EXISTING PARKING LOT Ml EXISTING PARKING LOT Fm EXISTING PARKING LOT rm EXISTING SPORT COURT LEGEND EXISTING PROPERTY LINE PROPOSED PROPERTY LINE EXISTING TO BE REMOVED CURRENT PHASE DEMOISION COMPLETED PARKING LOT GENERAL NOTES 1) BASIC BULDING LOCATIONS WILL BE APPROVED WITH THIS PLAN VARIATIONS TO EXACT BULDING CONFIGURATION MAY OCCUR DURING SUBSEQUENT APPROVALS 2) PROPOSED PHASING ORDER MAV CHANGE AS DETERMMED BY ARMY AND NAVY ACADEMY. REVISIONS- HS DGE Mark T. House John Dodge MO 401 AML nlMtabCSA Mm on.ttr.0077 ta Doogn oofl inM na n otacitoa, UMO . or part, Y*uU tif Kt bwAltdso tnd vttmi ©2005-2008 House & Dodga Design, Inc PRELIMINARY NOT FOR CONSTRUCTION SCALE-N.T.S. DATB 0I-CH-06 PHA6IN* EWIBIT A1.21 NEW BUILDINGS Ml Ml Ml Ml Ml ED fsn ipn [on Ion (O (ED [En NEW CADET STORE RECREATION HAa - REMODELED HEALTH CENT REMODELED NEWBRIDGE NEW (XlRMirORV NEWDORMITORV ANDERSON HALL - AOOITION / REMODEL CREAN HALL - ADDITION / REMODEL NEWAUDITORIUM 4 MUSC DEPAfiTMENT NEWACAOEMIC BULDING NEW SCENCE BUILDING NEWART DEPARTMENT - REMODEL NEWAMPHITHEATER NEW STAFF HOUSING STAFF PARKING BELOWP-8 (18 SPACES) NEW STAFF HOUSING STAFF PARKING 8ELOWP-9 (18 SPACES) NEW MAINTEN/VNCE FACL ITIES BUILDING PARKING LOT AT BLDG M-l [39 SPACES) PARKING LOT AT BLDG M-l [8 SPACES) PARKING LOT AT BLDG S-2 (16 SP/VCES) PARKING LOT AT BLDG Arl (30 SPACES) PARKING LOTATBLDG E-1 [31 SPACES) PARKING LOT AT BLDG H-1 (8 SPACES) PARKING LOT AT BLDG H-1 (18 SPACES) (PARKNG AT SRADE 2 STORY STAFF HOUSNG /VBOVE ) PARKING LOT AT BLDG H-2 (18 SPACES) (PARKNG AT GRADE ISTORY STAFF HOUSNG ABOVE) EXISTING BUILDINGS cn cn cn cn CD cn cn m cn rm on on on rm rm nn un rm UE cm on oa rm on rm cm Dll on on cm rm rm rm rm cm rm rm rm rm on rm on rm UB EH Ea Fm Mi FACILITES MANAGEMENT ACADEMIC BUILDING 400 HOOVER HALL ANDERSON HALL McLENDON HALL MclNTOSH HALL ACADEMIC BUILDING 300 LEWIS l-IALL CREAN HAa ATKINSON HALL TAC COUNSELING CENTER OPERATIONS OFFICE ACADEMIC BUIIDING 100 DAVIS HAa ISTFLOOR AUDITORIUM/GYM 2ND FLOOR • EXECUTIVE OFFICES ACADEMIC OFFICES BANO ROOM COTTAGE NO 1 COMMANDANT'S OFFICE SUMMER PROGRAMS COTT/VGEMO 3 COTTAGE NO 4 COTTAGE NO 5 MLLER HALL MUSEUM COTTAGE NO S 4 7 COMMAND 4 TAC BUSINESS OFFCE ISTFLOOR MESSHALL JNO FLOOR • ADMISSIONS 4 PARENT /VFFAIRS OFFICES EAST FEG/VN ISTFLOOR MESSHALL 2N0 FLOOR STAFF HOUSING TRANSPORTATION 4 HR (MOHAN HALL) AC^OEMIC BUILOING 500 ACADEMIC BUILDING 800 LIBRARY STAFF HOUSING ST/VFF HOUSING SCIENCE BUILDING FACULTY APARTMENTS CHAPEL RECREATION HALL 4 STORE PRESDENTS RESDENCE ATHLETIC FACILITY STORAGE/VREA EXISTNG PARKING LOT EXISTNG PARKING LOT EXISTNG PARKING LOT EXISTNG PARKING LOT EXISTNG SPORT COURT LEGEND EXISTING PROPERTY LINE PROPOSED PROPERTY LINE EXISTING TO BE REMOVED CURRENT PHASE DEMOISION CURRENT PHASE BUILDNG CONSTRUCTION COMPLETEO PARKING LOT GENERAL NOTES I) BASIC 9U LDING LOCATIONS Wia BE APPROVED WITH THIS PLAN V/VRIATIONS TO EXACT BUIDING CONFIGURATION MAY OCCUR DURING SUBSEQUENT APPROVALS 21 PROPOSED PHASING OR OER MAY CHANGE .AS DETERMMED BY ARMY ANO NAVYACA(3EMY. HS DGE Mark T. House John Dodge •oiOhMCM ttm ©2005-2008 House 4 Dodge Design. Inc PRELIMINARY NOTFOR CONSTRUCTION SCALE-N.TA DATB PHAai^ EXHIBIT PHASING OVERVIEW Appendices CHAPTER 6 : APPENDICES I. Legal Description The legal description for the Army and Navy Academy Master Site Plan is as follows: The land referred to herein is situated in the State of California, County of San Diego, City of Carlsbad and is described as follows: PARCEL A: That portion of Lot 47 of Granville Park and that portion of Laguna Drive adjacent thereto (vacated and closed to public use by Resolution No. 918 ofthe City of Council ofthe City of Carlsbad, California, recorded July 19, 1963 as File No. 126793 of official records of San Diego County, California) in the City of Carlsbad, County of San Diego, State of California, according to Map thereof No. 1782, filed in the Qffice ofthe County Recorder of San Diego County, more particularly described as follows: Commencing at a point in the easterly line of Mountain View Drive as shown on said Map No. 1782, said point being on a curve, concave easterly, having a radius of 268.03 feet a radial line through said point bears south 57°36'45" west (record south 58° 14'45" west per said Map No. 1782); thence southeasterly along the arc of said curve, through a central angle of 2°08'16", a distance of 10.00 feet to the true point of beginning; the last said curve is along the northeasterly line of Mountain View Drive (being also the southwesterly line of said Lot 47); thence leaving said northeasterly line of Mountain View Drive, north 3°43'49" west, 139.99 feet; thence north 15°17'29" west 59.75 feet to a point in the northwesterly line of said Laguna Drive (vacated), said northwesterly line also being the southeasterly line of Lot "A" of Granville Park Unit No. 2 according to Map thereof No. 2037, filed in the Office of the County Recorder of said San Diego County, said point being on a curve, concave southeasterly, having a radius of 207.16 feet, a radial line through said point bears north 45°21'44" west; thence northeasterly along the arc of last said curve and along the northwesterly line of said Laguna Drive (vacated), through a central angle of 12°35'14", a distance of 45.51 feet to a point on the southwesterly right of way line of the Atchison Topeka and Santa Fe Railroad (200 feet wide) as shown on said Map No. 1782, said point being on a curve, concave northeasterly, having a radius of 1532.69 feet, a radial line through said point bears south 39M4'30" west (record south 40°23'15" west per said Map No. 1782); thence southeasterly along the arc of last said curve being the southwesterly right of way line of said Atchison Topeka and Santa Fe Railroad and the northeasterly line of said Laguna Drive (vacated) and said Lot 47, through a central angle of 6°24'00" (record 6°23'56" per said Map No. 1782) to an angle point in the northeasterly line of said Lot 47 as shown on said Map No. 1782); thence continuing along the northeasterly line of said Lot 47, south 4r48'00" east (record south 4ri0' east per said Map No. 1782), a distance of 220.72 feet to a point in the westerly line of right of way to Stat of California recorded October 15, 1925 in Book 1128, page 289 of Deeds, Records of San Diego County, California; thence along the westerly line of said right of way, south 03°16'00" west, 44.08 feet to a point in the southeasterly line of said Lot 47; thence along the southeasterly line of said Lot 47, south 54°22'00" west (record south 55°00' west per said Map No. 1782) a distance of 93.33 feet to the most southerly corner thereof, said corner being on the Arin^y Nt^vy Accidem.y MCister site PLi^iA. 28 Novembers, 200S' Appendices northeasterly line of said Mountain View Drive and said corner being on a curve, concave southwesterly, having a radius of 350.00 feet, a radial line through said point bears north 3n5'00" east (record north 31°53' east per said Map No. 1782); thence northwesterly along the southwesterly line of said Lot 47 and the northeasterly line of said Mountain View Drive on the arc of last said curve, through a central angle of 13°48'22", a distance of 84.34 feet (record 84.32 feet per said Map No. 1782) to the beginning of a reverse curve, concave northeasterly, having a radius of 268.03 feet; thence northwesterly along the southwesterly line of said Lot 47 and the northeasterly line of said Mountain View Drive on the arc of last said curve, through a central angle of 38°01'51", a distance of 177.91 feet to the true point of beginning. Together with Lot 131 of Granville Park No. 2, in the City of Carlsbad, County of San Diego, State of California, according to Map thereof No. 2037, filed in the Qffice of the County Recorder of San Diego County, June 18,1927. PARCEL Al: An easement and right of way for ingress and egress for the purpose of repair and maintenance of existing tennis court facilities over the easterly 2.00 feet of all that portion of Lot 47, and that portion of Laguna Drive adjacent to said Lot 47 (vacated and closed to public use by resolution No. 918 of the City Council of the City of Carlsbad, California, recorded July 19, 1963 as File No. 126793 of Official Records of San Diego County, California) of Granville, in the City of Carlsbad, County of San Diego, State of California, according to Map thereof No. 1782, filed in the office ofthe County Recorder of San Diego County, February 21, 1924, more particularly described as follows: Beginning at a point in the easterly line of Mountain View Drive as shown on said Map No. 1782, said point being on a curve, concave easterly, having a radius of 268.03 feet, a radial line through said point bears south 57°36'45" west (record - north 58°14'45" east per said Map No. 1782); thence northerly along the arc of said curve through a central angle of 12°59'27", a distance of 60.77 feet; thence tangent to last mentioned curve, north 19°23'48" west (record - north 18°45'58" west), 88.96 feet to a point in the southeasterly line of Lot "A" of Granville Park No. 2, according to Map thereof No. 2037 filed in the Office of the County Recorder of San Diego County, California (said point also being on the northwesterly line of said portion of Laguna Drive as vacated), said point being on the arc of a curve, concave southeasterly, having a radius of 207.16 feet, a radial line through said point bears north 62°41'43" west; thence northeasterly along the arc of said curve and along the southeasterly line of said Lot "A" (being also along the northwesterly line of said portion of Laguna Drive as vacated), through a central angle of 17°19'59", a distance of 62.67 feet; thence leaving said line, south 15°17'29" east, 59.75 feet; thence south 03°43'49" east, 139.99 feet to a point on the easterly line of Mountain View Drive as shown on said Map No. 1782 (said easterly line being also the westerly line of Lot 47 of said Map No. 1782) said point being on the arc of a curve, concave easterly having a radius of 268.03 feet, a radial line through said point bears south 55°28'29" west; thence northerly along the arc of said curve, through a central angle of 02°08'16" a distance of 10.00 feet to the true point of beginning. Said 2.00 foot easement being measured at right angles to that course described as south 03°43'49" east, 139.99 feet. The westerly line of said 2.00 feet shall be prolonged Arioiy «tA.d N a vy Acc^dei/Rbj Master site PLwiA. 29 Novembers, 200S Appendices so as to begin from that course described as south 15°17'29" east and shall be shortened so as to terminate in the easterly line of said Mountain View Drive. PARCEL B: Lot 46 of Granville Park, in the City of Carlsbad, County of San Diego, State of California, according to Map thereof No. 1782, filed in the Office of the County Recorder of San Diego County, February 21, 1924. PARCEL C: Lots 98 through 101 inclusive of Granville Park No. 2, in the City of Carlsbad, County of San Diego, State of California, according to Map thereof No. 2037, filed in the Qffice of the County Recorder of San Diego County, June 18, 1927. Together with that portion of Block 3 of Town of Carlsbad, in the City of Carlsbad, County of San Diego, State of California, according to Map thereof No. 775, filed in the office of the County recorder of San Diego County, February 15,1894, described as follows: Beginning at the most westerly corner of said Block 3; thence southeasterly along the southwesterly line of said block 80 feet; thence easterly to a point in the northerly line of said block distant thereon 190 feet easterly from the point of beginning; thence westerly along said northerly line being also the southerly line of Granville Park No. 2, according to Map thereof No. 2037, filed in the Qffice of the County Recorder of said County, June 18,1927,190 feet to the point of beginning. PARCEL D: Lots 75, 76 and Lots 94 through 96 inclusive of Granville Park No. 2, in the City of Carlsbad, County of San Diego, State of California, according to Map thereof No. 2037, filed in the Office ofthe County Recorder of San Diego County, June 18, 1927. PARCEL E: Lots 153 through 170 and Lots 177 through 198 of Granville Park No. 2, in the City of Carlsbad, County of San Diego, State of California, according to Map thereof No. 2037, filed in the Qffice ofthe County Recorder of San Diego County, June 18,1927. Together with that portion of Cypress Avenue and Del Mar Avenue lying northeasterly of the northeasterly right of way line of Coast Highway, also together with that portion of the unnamed alley adjoining said Lots 153 through 170 inclusive, on the northeast and lying southerly a line drawn radially from the northwest corner of Lot 178, also together with all that portion of Sycamore Street, as all were vacated and closed to public use by order of the Board of Supervisors, filed in the Qffice of the County Recorder of San Diego County, April 13,1933 in Book 207, Page 217 of Qfficial Records. PARCEL F: Arm.y aNavy Academ-y Master site Plata. 30 November S, 200S Appendices That portion of Blocks 1 and 2 of Oceanside addition to Carlsbad, in the City of Carlsbad, County of San Diego, State of California, according to Map thereof No. 893, filed in the Office of the County Recorder of San Diego County, April 8, 1903, together with the alley lying within Block 2 and that portion of Ocean Park Avenue lying between said Blocks 1 and 2 as vacated and closed to public use in order of the Board of Supervisors, filed in the Qffice of the County Recorder of San Diego County, October 2, 1925 in Book 751, Page 332 of deeds. Together with that portion of Lot 1, in Block "A" of Hayes Land Company addition to Carlsbad Map No. 2, in the City of Carlsbad County of San Diego, State of California, according to Map thereof No. 1221, filed in the office of the County Recorder of San Diego County, November 4, 1909, together with a portion of that 5 foot strip of land lying northerly of and adjacent to said Lot 1, in Block "A" of Map No. 1221, being described as a whole as follows: Beginning at a point in the southwesterly line of said Lot 1, distant thereon, north 36°00'00" west, 103.57 feet from the most southerly corner of said Lot 1; thence continuing along said southwesterly line and its northwesterly prolongation, north 36°00'00" west, 24.59 feet to the northerly line of said Map No. 1221; thence along said northerly line, north 89°41'00" east, 42.15 feet; thence leaving said northerly line, south 54°00'00" west, 34.24 feet to the point of beginning. Also together with the southwesterly half of Ocean Street lying southeasterly of the southeasterly right of way of Pacific Avenue and northwesterly of the southeasterly right of way of La Cresta Avenue as vacated and closed to public use by order of the Board of Supervisors, filed in the Qffice of the County Recorder of San Diego County, April 13, 1933 in Book 207, Page 217 of Qfficial Records. Also together with that portion of Lot 6 of Granville Park, in the County of San Diego, State of California, according to Map No. 1782, filed in the Office ofthe County Recorder of San Diego County, February 21, 1924 and that portion of Oceana Park Avenue vacated and closed to public use described as follows: Beginning at the southeast corner of Lot 6; thence south 55°00' west to the mean high tide line; thence northerly along the mean high tide line to intersection of a line bearing south 57°29' west from the southeast corner of said Lot 6; thence easterly along said line to the westerly line of Lot 6; thence continuing easterly along said line north 57°29' east to the point of beginning. Excepting therefrom that portion lying northerly of the following described line: Beginning at the most easterly corner of Granville Park, in the County of San Diego, State of California, according to Map thereof No. 1782, filed in the Office of County Recorder of San Diego County, February 21, 1924; thence along the southerly boundary thereof south 55° west to the most easterly corner of Lot 6; thence leaving said southerly boundary south 57°29' west to the mean high tide line of the Pacific Ocean being the point of terminus. Also excepting therefrom that portion lying northeasterly of the southwesterly boundary of Granville Park No. 2, in the City of Carlsbad, County of San Diego, State of California, Arm,y-aNavy Acadei^y Master site PLaiA. 31 Novembers, 200S Appendices according to the Map thereof No. 2037, filed in the Qffice of the County Recorder of San Diego County, June 18, 1927. Also excepting therefrom that portion of Lot 1, in Block 2, of Oceanside addition to Carlsbad, in the City of Carlsbaci, County of San Diego, State of California, according to Map thereof No. 893, filed in the Office of the County Recorder of San Diego County, Described as follows: Beginning at the intersection of the northerly line of Block "A", of the Hayes Land Company addition to Carlsbad, Map No. 2 according to Map thereof No. 1221, filed in the Office of the County Recorder of said County, November 4, 1909, with the southwesterly line of Ocean Street, 40 feet wide, as shown on said Map No. 1221; thence northwesterly along said southwesterly line of Ocean Street being also the arc of a 60 foot radius curve, concave northeasterly 24.15 feet through a central angle of 23°03'30" to a point in a radial line of said curve bears south 77°03'30" to a point; thence leaving the arc of said curve and said southwesterly line of Ocean Street, south 54°00'00" west 37.51 feet to a point in said northerly line of Map No. 1221; thence along said northerly line north 89°41'00" east 40.28 feet to the point of beginning. Also excepting therefrom the southeasterly 10.00 feet of said Ocean Street vacation hereinabove described. PARCEL G: Lots 58 through 73 inclusive. Lots 102 through 130 inclusive, and Lots 132 through 150 inclusive of Granville Park No. 2, in the City of Carlsbad, County of San Diego, State of California, according to Map thereof No. 2037, filed in the Office of the County Recorder of San Diego County, June 18, 1927. Together with all those portions of the unnamed alley lying northeasterly of said Lots 102, 107, 108, 116 and 117 as vacated and closed to public use by order ofthe Board of Supervisors, filed in the Qffice of the County Recorder of San Diego County, January 21, 1928 in Book 1433, Page 195, December 21, 1928 in Book 1568, page 179 and December 15, 1930 in Book 1844 page 209, all of deeds. Also together with that portion of Ocean Street lying northwesterly of the northwesterly boundary of Town of Carlsbad, in the City of Carlsbad, County of San Diego, State of California, according to Map Thereof No. 775, filed in the Office of the County Recorder of San Diego County, February 15, 1894 and southerly of a line parallel with and 10.00 feet northwesterly at right angles to the southwesterly prolongation of the northwesterly boundary of Lots 66 and 73 of said Granville Park No. 2 as vacated and closed to public use by order of the Board of Supervisors, filed in the Qffice of the County Recorder of San Diego County, December 15, 1930 in Book 1844, Page 209 of deeds and also the northeasterly half of said Ocean Street lying southeasterly of the southeasterly right of way of pacific avenue vacated and closed to public use by order of the Board of Supervisors, filed in the Office of the County Recorder of San Diego County, April 13, 1933 in Book 207, Page 217 of Official Records. Also together with those portions of Mar Vista Street lying southeasterly of the southeasterly right of way of Pacific Avenue and lying northerly of the northwesterly Arm.y aiA.c^ Navy Academ,y Master site PLaiA. 32 Novembers, 200S' Appendices prolongation of Lot 104 of said Granville Park No. 2 as vacated and closed to public use by order of the Board of Supervisors described in said Book 1844 Page 209 of deeds and said Book 207, page 217 of Official Records. Also together with all that portion of La Cresta Avenue lying westerly of the westerly right of way of Coast Highway as vacated and closed to public use by order of the Board of Supervisors described in said Book 207, page 217 of Qfficial Records. Also together with all the portion of Del Mar Avenue lying westerly of the westerly right of way of Coast Highway as vacated and closed to public use by order of the Board of Supervisors described in said Book 1844, page 209 of deeds. Arm,y at^d Navy Academ-y Master site PLaiA. 33 Novembers, 200?