Loading...
HomeMy WebLinkAboutRP 05-10A; State Stree Mixed Use; Redevelopment Permits (RP) (3)V CARLSBAD f^- : CiTY OF Housing & Neighborhood Services www.carlsbadca.gov May 18, 2011 KARNAK PLANNING & DESIGN ATTN: ROBERT RICHARDSON 2525 PIO PICO DR., STE. 102 SUBJECT: NOTiCE OF RESTRICTION - STATE STREET MIXED-USE RP 05-10(A)/CT 05-20(A)/CDP 05- 42(A) Dear Applicant: Please find the enclosed Notice of Restriction that needs to be signed, notarized, and returned for recordation. This is to fulfill a condition of approval of the RP 05-10(A)/CT 05-20(A)/CDP 05-42(A). Please ensure the following items are addressed priorto returning the Notice of Restriction: -7 Correct Notary Acknowledgement Required (Effective Januarv 1. 2008. all Certificates of Acknowledgement used by a California notarv on a document that will be recorded in the State of California must NOT HAVE "PERSONALLY KNOWN TO ME" in the acknowledgement. (Assembly Bill 886, Chapter 399)) Document must be properly notarized. -7 Name on signature page and name on Notarial Acknowledgement must match. •7 Property owner's signatures/initials must be the same as on Notary Acknowledgement. 7 Notary seal cannot be blurry/too light (County w/// not record the document if any portion of tlie Notary Seal is blurry or too light) 7 Include property owner's name in the designated space above the owner's signature. 7 Please pay particular attention to the signature requirements at the bottom of the signature page. It is our goal to assist you in getting the Notice of Restriction recorded as expeditiously as possible. If you have any questions or need additional assistance, please contact Michele Masterson, Senior Management Analyst at (760) 602-4615 or via email at michele.masterson@carlsbadca.eov. Sincerely, Austin Silva ^ Assistant Planner c: CED Senior Management Analyst File Copy 2965 Roosevelt Street, Ste. B, Carlsbad, CA 92008-2397 T 760-434-2810 F 760-720-2037 ® 4k VXARLSBAD Planning Division MaAxd 3) n|)' FILE COPV www.carlsbadca.gov PLANNING COMMISSION NOTICE OF DECISION March 17, 2011 Karnak Planning and Design Suite C 2802 State Street Carlsbad CA 92008 SUBJECT: RP 05-10(A)/CT 05-20(A)/CDP 05-42(A) - STATE STREET MIXED USE At the March 16, 2011 Planning Commission meeting, your application was considered. The Commission voted 7-0 to recommend approval of your request. The decision of the Planning Commission is advisory and will be forwarded to the City Council. If you have any questions regarding the final dispositions of your application, please contact your project planner Austin Silva at (760) 602-2813 or austin.silva@carlsbadca.gov. Sincerely, DON NEU, AICP Planning Director DN:AS:bd c: Data Entry File enc: Planning Commission Resolution No. 6767, 6768, and 6769 1635 Faraday Avenue, Carlsbad, CA 92008-7314 T 760-502-4500 F 750-502-8559 <£^3^ CITY OF V^CARLSBAD Planning Division FILE COPY www.carlsbadca.gov February 22, 2011 Karnak Planning & Design Attn: Robert Richardson 2525 Pio Pico Drive, Suite 102 Carlsbad, CA 92008 SUBJECT: RP 05-10(A)/CDP 05-42(A)/CT 05-20(A) - STATE STREET IVIIXED USE The preliminary staff report for the above referenced project wili be sent to you via email on Wednesday, March 2, 2011, after 8:00 a.m. This preliminary report will be discussed by staff at the Development Coordinating Committee (DCC) meeting which will be held on March 7, 2011. A twenty (20) minute appointment has been set aside for you at 9:00 AM. If you have any questions concerning your project you should attend the DCC meeting. It is necessary that you bring the following required information with you to this meeting or provide it to your planner prior to the meeting in order for your project to go forward to the Planning Commission: 1. Unmounted colored exhibit(s) of your site plan and elevations 2. A PDF of your colored site plan and elevations The colored exhibits must be submitted at this time to ensure review by the Planning Commission at their briefings. If the colored exhibits are not available for their review, your proiect could be rescheduled to a later time. The PDF of your colored site plan and elevations will be used in the presentation to the Planning Commission and the public at the Planning Commission Hearing. If you do not plan to attend this meeting, please make arrangements to have your colored exhibit(s) and the PDF here by the scheduled time above. Should you wish to use visual materials in your presentation to the Planning Commission, they should be submitted to the Planning Division no later than 12:00 p.m. on the day of a Regular Planning Commission Meeting. Digital materials will be placed on a computer in Council Chambers for public presentations. Please label all materials with the agenda item number you are representing. Items submitted for viewing, including presentations/digital materials, will be included in the time limit maximum for speakers. All materials exhibited to the Planning Commission during the meeting (slides, maps, photos, etc.) are part of the public record and must be kept by the Planning Division for at least 60 days after final action on the matter. Your materials will be returned upon written request. If you need additional information concerning this matter, please contact your Planner, Austin Silva at (760) 434-2813. Sincerely, Q > DON NEU, AICP City Planner DN:AS:sm File Copy Frank Jimeno, Project Engineer 1535 Faraday Avenue, Carlsbad, CA 92008-7314 T 750-502-4500 F 750-502-8559 October 27, 2010 TO; Austin Silva, Assistant Planner Chris DeCerbo, Principal Planner Bridget Desmarais, Administrative Secretary FROM: Michael Elliott, City of Carlsbad's Contract Landscape Architect RE: Landscape Architectural Review - Conceptual Review - 5**^ Review State Street Mixed Use, RP 05-lOA, CT 05-lOA, CDP 05-42A State Street PELA file: 4 - State Street Mixed Use - Con5 Designer: Karnak Planning & Design, Phone (760) 434-8400 Please advise the applicant to make the following corrections to the plans so that they will meet the requirements of the City of Carlsbad's Landscape Manual. Numbers below are referenced on the red line plans where appropriate for ease in locating the area ofthe comment concern. REPEAT COMMENTS 1-7 Completed. 8. Deleted. 9. Deleted. 10. Completed. 11. 50% of the shrubs shall be a minimum 5 gallon size. Please revise sizes as appropriate. 5^^ Review: The applicant has responded: "All shrubs to be 5 gallon size. " There are 59 1 gallon shrubs still shown which is in excess of 50%. Please revise as appropriate to provide a minimum 50% - 5 gallon shrubs. 12-14 Completed. 15. Please provide a written description of water conservation features including addressing xeriscape principles (see Appendix B) within the project. 5^^ Review: The applicant has responded: "Added to sheet LS. " There is no sheet LS and the notes could not be found. Please address the seven principles of "Xeriscape " as follows: 1) Good design, 2) Thorough soil preparation, S) Careful planned use of shrub and lawn areas, 4) Adapted, low water demand plants, 5) Effective and efficient watering methods, 6) Mulchedflower and shrub beds, and 7) Proper landscape maintenance and management. 16-18 Completed 19. Please show all site fiirniture and plantings on the plans. S"^ Review: Please add the rectangular planter with King Palm and round pot with Phoenix symbols to thc legend. Show locations of tho Phoenix in round pots on the plans. 5^^ Review: The applicant has responded: "The symbol for the Palms was added and coded on the legend as well as the roof deck plan. " Ido not find the symbol (circle) for the small round pot with Phoenix roebelenii on the plans and the rectangular planter with King Palms is not found on the plans on sheet LL 0. Please delete these from the legend on this sheet if not used. If to be used, please show them on the plans. 20. Completed. 21. Completed. State Street Mixed Use August 20, 2010 Conceptual Plan Review Page 2 22 RETURN REDLINES and provide 2 copies of all plans (concept and water conservation) on the next submittal. lA. Deleted. 2 A-3 A Completed. 1B-3B Completed. NEW COMMENTS IC. Please graphically show all S-3 shrubs on the plans. 2C. Please revise hatch symbol to show ground cover versus integral pavers in all planting areas. Citv of Carlsbad Housing & Redevelopment Department September 23, 2010 ROBERT RICHARDSON KARNAK PLANNING AND DESIGN 2802 STATE ST, STE C CARLSBADCA 92008 Subject: State Street Mixed-Use Amendment RP 05-1 OA/ CDP 05-42A/ CT 05-20 Dear Robert: The purpose of this letter is to note additional corrections for the project plans and to address remaining issues of concem raised by City staff following a review of the revised plans submitted. The noted corrections and issues of concem are attached for your review. These issues must be addressed prior to staff making a formal recommendation on the project and moving the project fonvard to Please contact my office at (760) 434-2813, If you have any questions or wish to set up a meeting to discuss the application. Sincerely, M>4/ AUSTIN SILVA Assistant Planner c: Debbie Fountain, Housing and Redevelopment Director Frank Jimeno, Engineering John Simons, Property Owner File 2965 Roosevelt St., Ste. B • Carlsbad, CA 92008-2397 • (760) 434-2810/2811 • FAX (760) 720-2037 State Street Mixed Use 09/23/2010 Page 2 of3 ISSUES OF CONCERN RP 05-1 OA Staff has completed a review of the subject project for issues of concem. The following items need to be resolved or adequately addressed prior to staff making a final determination on the proposed project: (Please note, the issues are listed under the department which identified them as an area of concem.) Housing & Redevelopment: 1. Ptease revise the north elevation to show a zero foot setback along the front of the property. Removed wrong sheet 2. The open space calculations do not conespond with each other. Please correct this to ensure the data is same throughout the site data table and the landscape plans. Calculations match on each sheet exactly..double check sq.ft. as well Engineering: 1. More information is needed for the proposed Harvest Rainwater Tank. Information is needed regarding how the tank will drain after a storm event. Submit manufacturer's pamphlet showing how the system works. This system is considered a stormwater BMP and needs to be incorporated in the project's preliminary SWMP. No analysis by the projecfs civil engineer was received. Brochures are attached 2. Be aware that the Regional Water Quality Control Board has ordered the Incorporation of hydromodification requirements for all priority projects that have not yet begun grading or constructton activities before January 15,2011, when the order becomes effective. If the project has not started grading by that date, the SWMP will have to be modified to incorporate hydromodificatton measures as required by a revised SUSMP that will be published prior to that date. See notes on cover sheet and site plan Should you or the applicant have any questions please contact Frank Jimeno at (760) 602-2758. Landscape Plan review: The City's Landscape Plan Check consultant has the following comments: 1. Generally identify all existing woody plant material to be removed or retained. Trees over 12" In caliper diameter shaii be identified on the plan individually as to caliper size and type and labeled to be retained or removed. It is noted that there are two large Queen Palms existing along State Street. Please show on the plans where the two existing palms are to be located once transplanted. The two palms are noted to their final location on LI.O 2. Landscaping consisting of ground cover, shrubs, and trees shall be used to screen elements of unsightliness and screen/soften new Improvements. Landscaping shall be used to accentuate and enhance architecture. Articulation of the State Street (west) elevation has been modified deleting architectural recesses and landscaping. Additional landscaping is needed to soften and enhance this elevatton. No landscaping is proposed along the right (north) elevations. Landscaping to Include Dicussed with Austin all available optlons..tight site State Street Mixed Use W 09/23/2010 Page 3 of3 trees or palms is needed to soften and enhance these elevations for views from the south. Please address all areas. 3. 50% of the shrubs shail be a minimum 5 gallon size. Please revise sizes as appropriate. ;^|| ^^^^^^ ^ ^.^^ 4. Please provide a written description of water conservation features including addressing xeriscape principles (see Appendix B) within the project. Added to sheet L3 5. Please add the rectangular planter with King Palm and round pot with Phoenix symbols to the legend. Show tocations of the Phoenix in round pots on tiie plans. The symbol for the Palms was added and coded on the legend as well as the roof deck plan 6. Four palms are called for witti a call out along the north building elevation; however, only one is graphically shown. Addittonal palms or trees are needed along this elevation (see red line plans). Landscaping consisting of ground cover, shrubs, and trees shall be used to screen elements of unsightiiness and screen/soften new improvements. Landscaping shall be used to accentuate and enhance architecture. Please address The 4 palms were in error. We only have one that was relocated to the corner of bidg. 7. RETURN REDLINES and provide 2 copies of all plans (concept and water conservation) on the next submittal. Debbie Fountain ^/ ^"^^^^ ^^C^/g TqiS ^ City ofCarlsbad, Housing and Development Dept. <<vV>^^'""^^^'^^*^ C- ^^^^ I^T^"^ 2965 Rooseveh Sr., STE. B ^^^^r^xJ^ ^^/^ ., ^ Carlsbad, CA 92008-2397 ' -. - ^ . • In response to the letter from Mr. Austin Silva,Assistant Plarmer dated \fJf^^ September 23,2010'I will go point by point. After reviewing with Robert Richardson, the following has been disclosed: Alter reviewing with Robert Richardson, the following has been disclosed: vO i Housing and Development: Cij^r \ C\)S^ 1. Revise north elevation. ON PLANS 2. Review open space calculations WILL CHECK AND CORRECT Engineering: 1. HARVEST RAINWATER TANK MFG.PAMPHLET. Robert has the pamphlet and will deliver with the remaining info. 2. Regional Water Quality Control Board hydomodification: PLEASE CONDITION IN APPROVAL!! We understand that it will be finalized with working plans and documents and city. Landscaping Plan Review: 1. Identify woody plant materials to be retained or removed: ON PLANS and point out to Austin. 2. Articulations and screening to soften look. Robert to meet with Austin to explain the compromise between landscaping and parking. We will work to make an attractive site! 3. 50 percent of shrubs all be 5 gallon size. We will agree to ALL at 5 gallon. 4. Provide written description of water conservation features: Robert will submit! 5. Add rectangular planter and round pot with Phoenix symbol to legend. Robert vsdll do! 6. 4 palms are called out north elevation. Robert to review and show our concems with overcrowding. In conclusion, Robert will need to meet ASAP with Austin to complete all these questions have been resolved! Thanks imons, A Mar^ging Partner CC:Austin Silva Debbie Fountain City of Carlsbad, Housing and Development Dept. 2965 Roosevelt Sr., STE. B Carlsbad, CA 92008-2397 Dear Debbie, In response to the letter from Mr. Austin Silva,Assistant Planner dated September 23,2010' I will go point by point. After reviewing with Robert Richardson, the following has been disclosed: Housing and Development: 1. Revise north elevation. ON PLANS 2. Review open space calculations WILL CHECK AND CORRECT Engineering: 1. HARVEST RAINWATER TANK MFG.PAMPHLET. Robert has the pamphlet and will deliver with the remaining info. 2. Regional Water Quality Control Board hydomodification: PLEASE CONDITION IN APPROVAL!! We imderstand that it will be finalized with working plans and documents and city. Landscaping Plan Review: 1. Identify woody plant materials to be retained or removed: ON PLANS and point out to Austin. 2. Articulations and screening to soften look. Robert to meet with Austin to explain the compromise between landscaping and parking. We will work to make an attractive site! 3. 50 percent of shmbs all be 5 gallon size. We will agree to ALL at 5 gallon. 4. Provide written description of water conservation features: Robert will submit! 5. Add rectangular planter and round pot with Phoenix symbol to legend. Robert will do! 6. 4 palms are called out north elevatioiL Robert to review and show our concems with overcrowding. In conclusion, Robert will need to meet ASAP with Austin to complete all these questions have been resolved! Thanks ions, A MaiMging Partner CC:Austin Silva Citv of Carlsbad Housing & Redevelopment Department September 23, 2010 ROBERT RICHARDSON KARNAK PLANNING AND DESIGN 2802 STATE ST, STE C CARLSBAD CA 92008 Subject: State Street Mixed-Use Amendment RP 05-1 OA/ CDP 05-42A/ CT 05-20 Dear Robert: The purpose of this letter is to note additional corrections for the project plans and to address remaining issues of concern raised by City staff following a review of the revised plans submitted. The noted corrections and issues of concern are attached for your review. These issues must be addressed prior to staff making a formal recommendation on the project and moving the project fon^/ard to Please contact my office at (760) 434-2813, if you have any questions or wish to set up a meeting to discuss the application. Sincerely, AUSTIN SILVA Assistant Planner c: Debbie Fountain, Housing and Redevelopment Director Frank Jimeno, Engineering John Simons, Property Owner File 2965 Roosevelt St., Ste. B • Carlsbad, CA 92008-2397 • (760) 434-2810/2811 • FAX (760) 720-2037 @ State Street Mixed Use 09/23/2010 Page 2 of 3 ISSUES OF CONCERN RP 05-1 OA Staff has completed a review of the subject project for issues of concern. The following items need to be resolved or adequately addressed prior to staff making a final determination on the proposed project: (Please note, the issues are listed under the department which identified them as an area of concern.) Housing & Redevelopment: 1. Please revise the north elevation to show a zero foot setback along the front of the property. 2. The open space calculations do not correspond with each other. Please correct this to ensure the data is same throughout the site data table and the landscape plans. Engineering: 1. More information is needed for the proposed Harvest Rainwater Tank. Information is needed regarding how the tank will drain after a storm event. Submit manufacturer's pamphlet showing how the system works. This system is considered a stormwater BMP and needs to be incorporated in the project's preliminary SWMP. No analysis by the project's civil engineer was received. 2. Be aware that the Regional Water Quality Control Board has ordered the incorporation of hydromodification requirements for all priority projects that have not yet begun grading or construction activities before January 15, 2011, when the order becomes effective. If the project has not started grading by that date, the SWMP will have to be modified to incorporate hydromodification measures as required by a revised SUSMP that will be published prior to that date. Should you or the applicant have any questions please contact Frank Jimeno at (760) 602-2758. Landscape Plan review: The City's Landscape Plan Check consultant has the following comments: 1. Generally identify all existing woody plant material to be removed or retained. Trees over 12" in caliper diameter shall be identified on the plan individually as to caliper size and type and labeled to be retained or removed. It is noted that there are two large Queen Palms existing along State Street. Please show on the plans where the two existing palms are to be located once transplanted. 2. Landscaping consisting of ground cover, shrubs, and trees shall be used to screen elements of unsightliness and screen/soften new improvements. Landscaping shall be used to accentuate and enhance architecture. Articulation of the State Street (west) elevation has been modified deleting architectural recesses and landscaping. Additional landscaping is needed to soften and enhance this elevation. No landscaping is proposed along the right (north) elevations. Landscaping to include State Street Mixed Use 09/23/2010 Page 3 of3 trees or palms is needed to soften and enhance these elevations for views from the south. Please address all areas. 3. 50% of the shrubs shall be a minimum 5 gallon size. Please revise sizes as appropriate. 4. Please provide a written description of water conservation features including addressing xeriscape principles (see Appendix B) within the project. 5. Please add the rectangular planter with King Palm and round pot with Phoenix symbols to the legend. Show locations of the Phoenix in round pots on the plans. 6. Four palms are called for with a call out along the north building elevation; however, only one is graphically shown. Additional palms or trees are needed along this elevation (see red line plans). Landscaping consisting of ground cover, shrubs, and trees shall be used to screen elements of unsightiiness and screen/soften new improvements. Landscaping shall be used to accentuate and enhance architecture. Please address 7. RETURN REDLINES and provide 2 copies of all plans (concept and water conservation) on the next submittal. September 22, 2010 Redevelopment and Housing City of Carlsbad 2965 Roosevelt Street, Suite B Carisbad,CA RE: Letter Attachment Green Form 3044 State Street LLC IVIixed Use Project ATTN: Debbie Fountain, Director Austin Silva, Planner Attached is the Green Building Form that illustrates our partnership's desire to meet or exceed the Silver status. As we mentioned in our previous discussions and meetings, we will work to achieve the Silver level, however, we believe that our efforts to meet the standards will NOT be tied by the Leeds Green Building standards. We desire to use Low E windows, dual flush toilets, bamboo floors, metal studs and other green building products. We see the need to go Green and desire to do so as much as we can. Thank you for your continued cooperation and we sincerely are happy to proceed with our upgrade to the new standards for this site. Sincerely, John aJmons, inatfaging partner 3044 S6ite StP^t LLC n n r> ri -o lllll 3. _ 9: ' o i> ^? J |. g 3-uo Ul o 3 00 £. o Q. S 5' UQ fl l/l (-N ? I & o —. rr 2. fD fil 3 CL tfl O < < < ononon-o-oTj S-" S"* S'* _2 2 jQ S s n> K D) m m o 3 3 3 5* 3 n - - OQ sr ^ ^ 2 (5 w 0) O l/l 5? ? Q 3 3 = C 3 3 _ 3 n n fD f i 2. a S US'?? Q. O < ^ o" ^ 01 3 3 § o 71 _ r-f 3 n, l£» Q. N- 3 fO fD 3— CL 1 1 m -1 fil o. o o n I-f* «-p J5 01 01 fil m nnooooorif-inoririo lllllllllllllll S"* S"* S" S-' S-' rt-' S-* S'' S-* S-' S-" j5 00 ^ ^ -» fD < fD n> n If 1^ —I cu -T -1 _ — o' m 3 3 .3 .3 3 3 0) fD »— fD <»3 2? o3 n fD >< O O (A 3' ^• ? 3 S C 2: m o tf) IT 3 fD 2 I fo 3 3 ^ 01 ^. O CT n "TO o. 3* ^ M OJ ro NJ o o O O •vl -» a. r* 3) fi) s. a s. s. 70 yO ^ ^ lis 1^ W TO 5' S' o o" 3333 Ol_ 0» 0)_ o>_ -D -a TJ TJ o o »< >< •< >< l/l 1/1 V) l/l I O 3 £L o o Q. n o o o f-l n 3 3 3 3 3 3 3 3 3 3 OOOO — ^ < < < < >. 01 0> 01 01 0) I-f I-* rt rt r-f n o o o o o' l/i </< t/l m JS' iia tia iia "S rf 21 n fS n n tf» fg noon noon Si. ? l/l l/l i/> l/l IS Q o n Q 0) ^ si 3i 5i 3 nnn fD fD (D fD fD ° o o cr -a o 3^9-3 2 =;• a? Jit o ^ Si! l/l ^ •a g 3' CJ Ul O (/) o c tfl fil 3* fil ® M U> -» O TJ O CT TJ 3' ro < < 3 3 o < fil o' 3 01 3 a o fD tfl do" 3 nnnnnnnnnnnnnnn-o-D ||i||iii||||iii|| 0) 01 fD fD 3 3 -1 T — 3 3 01 0> o < '-•'^"Si.--j-n=. I I < o i < tn US' n n 0 o 3 3 . ^ 1 I < o rD fD 3. *2. 2; OQ n 3 01 3 - ET IT ET <^ 00900 ^^^33 1 I I Irt m m m m c; 3 3 3 c c rt rt rt rt C S CT S S-o O < < a' S» rt rt' =. UQ UQ UQ UQ 3" P n c S 9. 0) o (rt o fD -» °- > ^ z 3 a. o o n n n n ^ iiii n 73 73 rr fD' 01 fp fD l/l l/l S. a rt rt -o SL gL SL <D fD 3 3 1/1 Irt I I H r- SL TO n o 3 fD (D 3. 3. 0) 01 8 1 TO 0> 3 g 3 rt 5; > > & «° 3. ^ ^ o> 3 3 or 0) 0) f TO TO I fD fD ^33 ^ fD fO S 5 5 9> I I i i fD — 3 2 rt Q. 0< O 3 5 ^ =^ H O > 0) -> 8 rt fD ^1 o ;i rt Q, 3 = TJ tfj cr n TJ 3* r-l-tf> fb o 3 SL f3 TO 3 O P 2. n O (rt n 3 rt 01 l/l cz fD (D m o ^ i n § o C 3 <T> fil fD *< Q) fD " TJ o- 5 Sl o fD rt 3 $ <D S 3. fD S- SL 2. fil 3 a tfl o c n O O 3 rf 3' c n a. rn ^ r*i n w rt <i> n o 3 t/t f+ -1 C n O* 3 01 3 Q. 01 3 O < 0) rt- O* 3 Vt TJ O CT n TJ O o o ^ ^ e^ » C « a. 3 S =: t ^ i-i> 4» O. » rt - X 21 O 2 <? » ^ w CO C rt 0 »s S "0 ^ I •cr • 2 ' fD fD n n n n TJ I I I I 3 rV rf r.' J3 n 00 o c 3 ^ o fD C rt 5. o 5" TO TO <T> 3 ? ° a, Si. IS " S o 0> 3 Oj I ^ a 3 3- TO fD O 3 a« fD o 3 rt, a- R ^ 2 § 8 2 o. o o M NJ CO 1/1 tt 3 a. ? tfl o c -1 n ro tfl T> O CT fo" TJ O < < -< nnnnnn-D-o-D iiiiiiill r. rf' r^* r.' n-* r. j3 j5 fD Q» fD tn 3 C mmn 3 3 5 3- 3- . Q) Q) l/l TJ fD i 3 S fO rj n n fD ^ S 3 & N- 3 fD fD 1 ^ 01 3. - TO fD 3 2 m S- ET rt 3 01 3 Ql d. CT Irt fD 3 o' m -.'"^3 3 3! 5 3 - n 01 TO UO fD — «3 2? vc fD fD TO ^ 3 fD ^ O Irt o "S 3 fD 3 3 3 § OJ 01 TO ^ fD 00 3 £. fD fr NJ OJ NJ NJ O O 3 rD i tt 3 Q. 3 o tfl •a 3" (D -1 <D TJ O cr TJ O Ul Ul a a a ^ s S' S' z 0) 01 C rt c n fD r- n rt < Q) rt O" W 3 o 3 rt 9- 3 f*> .2 01 NJ tt m nnnnnnnnnnnnnn-D IIIIIIIIIIIIIIJ M M CU CU rt» TO fD fD rt rt ? 3- SL Si fD fD tt rt rt rt Ioni/il^l^>>>>OS OOp' 5' rtrtrtrt3 TJ O tfl tfj Br TJ o 0) 0) C S. S. fD fD 2 5?!^ o o fD fD < < <D fD O O — "O "O 3 3 18 fD fO ^ <— >— V-/ W lOf Ml 3 2 ? g g rt 2-. 2 2. g. fD fD 3 3 01 01 H H 3 3 3 3 3 3 3 3 (rt (rt (rt Lrt •a -a o o at 0) 9 < ? 2. 3, o Q. fD n rt o fT> 3 H H 3? ;i S O 3 6 6 01 01 2 < n o =: 3 3 ri rt rt r". rt O o on"—'TI"'3 n*- o ^ 3 o 3 n I fD 01 O" 0 o' 3 3 1 I "O r- 01 o 3- ^ 3" m TO 3 O rt Q) rt "D 3' Q> (io s- ^ 3 = => rt 00 -o " c o- rr n H l/l rt 0, 2 = 3 -S o m rt CJ (D fD < 3 fD (/» o 3 % =STO Q o < o % 3 _k_k-^-A_i_i-kNJOJ i I rt ft. -» on tt 3* tt fD to TJ O fo" TJ O NJ ft) n TT rri a o o n o 3 Ul C n 5* 3 01 3 Q. ^ OJ n> 3 O < 01 rt- O* 3 H i O d rt s> tt TJ 2 Q o O ° Pi n n n n iiii I o* 3 tt, TJ o TO 70 73 73 fp fD fD fp TO TO TO TO O O O O 3 3 3 3 Ctf_ 01 01 01 TJ TJ -D TJ 3. 3. 3. 3. OOOO 3. 3. 3. 3. rt rt rt rt '<><:'<>< l/l l/l on OO \ 1. 1 \ ^ rti rti rti rti n' n' n" n OOOO fp fD fD fD 0.0.0.0. 2u TJ O CT fo" TJ O n n n n n n iiiiii 5° n 3 3 w o o o o < < < < < Ol Q) 01 0> n o' o' o' o' o' -- 3 3 3 3 5' 3' 3' 3" 3' i fD C3 O. fD (rt ? TO 3 3 -*\ • • fB ^ |lg ° S; H (rt (rt TO oo' TO (« 3 3 3 3 to OO l/l l/l n n n n rti rt rti rti n' n' n' n' fD fD fD fD fD 3 3 % tt rt O* 3 tt 3 a o fD tfl OQ* 3 TJ O CT fD TJ O < < n n o n n n nnnnnnnn a I 2. I a I 2. I I I I i a I 8. 3 5 rt-* rt-' rt rt rt rt rt rt rt rt rt rt 2 ^ M ro ro NJ o 01 O O T r- C" C" C" 3- 3" O O fD fD 3 3 3- 3- 1 i ^ ii ' 3 3 3 3 ^ --^ !=• KT Q 3. 2. 2. 2, O O _ mmm 3 3 3 3" 9 < < fD' fS' I I < o It m o3' O O 0 o 3 3 1 I < o fD fD 3. «2. TO n 3 —• =1- 5; 3: f^ s ?; s 2 fD 2' S S 3 3 _ _ _ rt rt ^. TO TO TO TO fD -1 °- > ^Z 3 3 fD — Si. ^ ^ ^ ^ l/l l/l O. 3. ^ ?i WWW fD (D 3. 3. W W ^ ^ > g ^ /O ? ? ^ 3. W W ^ W 3 3 3 rt fD o f ^ " rt fD 9>5 w 3 3 lfl (rt I I H r- i 3- SL TO o it p§ !=L Q. > Irt lrt I I -n TJ 8 ^• 3 ^ • IU IU rt fB fO ^ S S lrt rt rt <• TJ "D s I" §• I I Q. S" fD C 5C o" ^• fD " 3 Si. 3 TO 3 o n (rt n 3 "O !^ w c 3 n w ^ R Q o g oo s: 3 rt ° ^ TT T3 fD fD — 3, m o ^ 3 3 Q. O O l/l l/l ft) Q. 5' J. 3 S K S 3 ? 5 tt TJ O CT fD TJ O n n n n ^ iiii tt n 70 70 70 fD W fD fp 3^32. fD w fD a. rn Q. w o 3. fD tt 3 Q. S" tfl o c ? ^ ^ ^ o o 3 rt 3' c fD a O *o O- rt 4k tt S (A - f s fD fD Karnak Planning & Design Robert Richardson, Planner * Jim RosenLieb, Architect 2802 State Street, Suite C, Carlsbad, Ca 92008 (760) 434-8400 Fax (760) 434-8493 e-mail: kamakarchfgiaol. com August 6, 2010 Redevelopment and Housing City of Carlsbad 2965 Roosevelt Street, Suite B Carlsbad, CA 92008 RE: Issues of Concem (Dated 6/29/2010) 3044 State Street LLC Mixed Use Project Housing and Redevelopment 1. See Justification Letter dated August 6, 2010. 2. Noted on AS 1.0 and provided service letter from Waste Management. 3. When we removed the stairs to the upper deck, we added three step backs. In elevation, avmings, windows, and glass retum of front deck. It also has color changes in elevation planes. 4. We added a kitchen window and awning in this location. 5. See revised Justification Letter dated August 6, 2010. 6. See AS 1.0 for location of the individual water storage tanks and harvest water storage tank in the motor court pervious-pavement area. 7. See A4.0, North Elevation. 8. See C1.0, Revised Calculations. 9. See Cl.O, "Parking". Landscape Plan Review: 1. Property lines have been increased in size. 2. All woody plants noted to be removed on Ll. 1 (2 of 3). 3. Calculations have been adjusted. We have added landscape and views along parking at the Oak Avenue Alley. 4. We have added palms along the north elevation. We were asked to bring the front State Street store front glass forward to the street for better view into the retail space. 5. Planting added along north side of Unit 7. We also added vines and architectural attached metal frame for the vines. 6. More than 50% of shmbs shall be five gallons. 7. Plant Palette has been modified and also changed to drought tolerant plant material. 8. We have changed the plant palette to all xeriscape/drought tolerant plant material. 9. All fumiture has been called out and optional manufacturer recommendations. Final selection will be by the developer. 10. All symbols are called out. 11. The two queen palms are going to be relocated to two locations and re-used. See Sheet Ll. 1 (2 of 3) for all existing large plants. 12. All palms are now shown. The symbol layer was accidently tumed off on last printing. 13. All plants are shown. 14. All palms noted of Deck Plan (4). 15. All vines located. No vines are on Sheet 2. 16. All quantities are now verified. Karnak Planning & Design Robert Richardson, Planner * Jim RosenLieb, Architect 2802 State Street, Suite C, Carlsbad, Ca 92008 (760) 434-8400 Fax (760) 434-8493 e-mail: kamakarch(a),aol.com August 6,2010 Redevelopment and Housing City ofCarlsbad 2965 Rooseveh Street, Suite B Carlsbad, CA 92008 RE: Justification letter 3044 State Street LLC Mixed Use Project ATTN: Debbie Fountain, Director Austin Silva, Planner This is a letter of justification for refiling the 3044 State Street Mixed Use Project with changes. Since the city has developed new and improved standards to the redevelopment area of Dovmtown Carlsbad, we have decided to modify our 3044 State Street LLC Mixed Use Project with the following items: 1) Incorporate green building products and options for the future buyers. We will work to achieve the constmction methods of a silver or higher certification and will consider providing the following items: a) Bike racks in retail area b) Use green/eco-friendly constmction products such as metal studs, approved green materials, solar electrical panels for common area lighting and a drip irrigation system, solar water heater panel setup, tank-less water heaters. The buyers will have the option to buy now and in the future. c) Provide hot water storage by use with solar panels and water storage tanks d) Project will be pre-plumbed and wired for future solar heating and electrical - this will be offered as an option to home buyers now and in the future. e) Use pervious concrete in the common area of the motor court that will help put rain run-off in the existing water table. The gutter and downspouts will drain to a common harvest rainwater tank that will be used by an irrigation water pump system to irrigate the proposed landscape plants. We will provide a rain water harvest below grade tank by either using a large drain pipe or storage tank. We are considering the use of an eco-rain drainage cell and water detention system that will be located under the front pervious concrete paving in the motor court. This will be detailed in the final erosion control report that will be provided with the final improvement plans. f) This project is close to the commuter train and local bus lines g) We have re-designed the landscape plan to include drought resistant plants. h) We are going to use a whole house ventilation system mounted in the attic roof to pull out built up heat and pull air from the outside, controlled by a thermostat. 2) Due to the change in the economy, we have chosen to reduce the size of the individual units to meet with today's real estate market. 3) Provide on site affordable housing unit instead of paying a fee for one. 4) The new standards can allow for three additional condominium units. 5) Collection and roof water into a storage tank that can be used for irrigation. 6) Update the design to the new ADA codes and revised building standards. 7) Provide design features that have been requested by Costal Commission and Debbie Fountain, Redevelopment and Housing Director City of Carlsbad. We have added four parking for four smart or mini cars, and providing hook ups for charging the electric cars. Provide housing close to mass transit, trains and buses. 8) Provide over 1155 sq.ft. of retail space. The above items are just a few of the many items we are going to add to this mixed use project. If you have any questions or comments please let us know. We are very excited to move this project to the planning commission as soon as possible. Respectfully submitted. Robert G. Richardson Kamak Planning and Design WASTE MANAGEMENT COAST WASTE MANAGEMENT 5960 El Camino Real PO Box 947 Carlsbad, CA 92008 (800) 596-7444 (760) 931-0219 Fax On Thursday 7/8/10,1, Joshua Martinez, Route Manager from Coast Waste Management have reviewed the site plans for State Street Mixed Use 3044 State Street with Robert Richardson. After reviewing the site plans, 1 agree that we are able to service the trash bins at the areas designated on the site plan. Martinez Route Manager Coast Waste Manager 5960 El Camino Real, Carlsbad From everyday collection to environmental protection. Think Greenf Think Waste Management. Pnnted on 100% post-consumeT recyded paper. Citv of Carlsbad Housing & Redevelopment Department June 28, 2010 ROBERT RICHARDSON KARNAK PLANNING AND DESIGN 2802 STATE ST, STEC CARLSBAD CA 92008 Subject: State Street Mixed-Use Amendment RP 05-1 OA/ CDP 05-42A/ CT 05-20 Dear Robert: The purpose of this letter is to address issues of concern raised by City staff following a review of the revised plans submitted. The issues of concem are attached for your review. These issues must be addressed prior to staff making a formal recommendation on the project. Please contact my office at (760) 434-2813, if you have any questions or wish to set up a meeting to discuss the application. Sincerely, AUSTIN SILVA Assistant Planner Debbie Fountain, Housing and Redevelopment Director File 2965 Roosevelt St., Ste. B • Carlsbad, CA 92008-2397 • (760) 434-2810/2811 • FAX (760) 720-2037 State Street Mixed Use 06/29/2010 Page 2 of 4 ISSUES OF CONCERN RP 05-lOA Staff has completed a review of the subject project for issues of concem. The following items need to be resolved or adequately addressed prior to staff making a final determination on the proposed project: (Please note, the issues are listed under the department which identified them as an area of concem.) Housing & Redevelopment: 1. Staff encourages you to provide additional on-site guest parking if possible, or provide detailed justification for standards modification related to the reduction in guest parking spaces and size ofthe guest parking spaces provided. 2. Please describe/show how garbage is serviced for the project. 3. Please add architectural detail to the retail portion of the building on the south elevation. The original approved plans had a recessed area with an altemate stucco color. Furthermore, the Design Review Board added condition No. 32 to DRB Resolution No. 309 to provide additional relief or detailing to the elevation that was proposed at the meeting. Please provide the details as to how this additional relief will be provided per the previous condition. 4. Please add architectural detail to the second floor of the western portion of the building on the north elevation. 5. Please provide more detail in the letter of justification for your request of a standards modification. For example, you state the project will be incorporating green building products and options for future buyers. What kind of products and options will be available to buyers? In order to receive standards modifications for green building practices, the project must be achieving a Silver or higher LEED certification. 6. Please show the water storage tank on the plans as you have indicated in the justification letter for standards modification. 7. Please revise the north elevation so that it shows a zero foot setback along the front of the property. 8. The open space calculations do not correspond with each other. Please fix this so the data is same throughout the site data table and the landscape plans. 9. Please list the amount of proposed parking spaces as 26 and remove "23 Standard" from the site data table. Landscape Plan review: The City's Landscape Plan Check consultant has the following comments: 1. Please clearly show and label the north and east property lines and any easements on the plans. State Street Mixed Use 06/29/2010 Page 3 of 4 2. Generally identify all existing woody plant material to be removed or retained. Trees over 12" in caliper diameter shall be identified on the plan individually as to caliper size and type and labeled to be retained or removed. It is noted that there are two large Queen Palms existing along State Street. Please address what is to occur with these palms. 3. The applicant indicates a total ground level landscape area of 2,854 square feet. There appears to be less than 600 square feet of ground level landscape area. This small amount of landscape area is not in scale with the proposed architectural mass and paving and needs to be expanded to provide better project enhancement and softening. Please review, adding landscape area as appropriate to provide a better balance and connect all square footage calculations. See comment number 4 below. 4. Landscaping consisting of ground cover, shrubs, and trees shall be used to screen elements of unsightliness and screen/soften new improvements. Landscaping shall be used to accentuate and enhance architecture. Articulation of the State Street (west) elevation has been modified deleting architectural recesses and landscaping. Additional landscaping is needed to soften and enhance this elevation. No landscaping is proposed along the right (north) elevations. Landscaping to include trees or palms is needed to soften and enhance these elevations for views from the south. Please address all areas. 5. Please add landscape area with shrubs and vines to the north of unit 7 as shown on the red line plans. 6. 50% of the shrubs shall be a minimum 5 gallon size. Please revise sizes as appropriate. 7. Most proposed shrubs are very low species and will provide little to no architectural elevation enhancement. Please add taller shmbs to better enhance elevations. 8. Piease provide a written description of water conservation features including addressing xeriscape principles (see Appendix B) within the project. 9. Please show all site furniture and plantings on the plans. Please add the rectangular planet with King Palm and round pot with Phoenix symbols to the legend. Show locations of the Phoenix in round pots on the plans. 10. Please identify all symbols used on the plans. Please show the portable gas BBQ in the legend on sheet 2. 11. Two (2) palms have been deleted along the north elevation (symbol call-out still lists 3 palms) and one appears to be shown below an overhead deck. Landscaping consisting of ground cover, shmbs and trees shall be used to screen elements of unsightliness and screen/soften new improvements. Landscaping shall be used to accentuate and enhance architecture. Palms or other tail trees are needed along this elevation to soften and enhance the architectural mass. Piease modify site plan to accommodate additional palms/trees. 3^^ Review: Seven palms are called for with call'Outs along the north building elevation; however only one is graphically shown. Additional palms or trees are needed along this elevation State Street Mixed Use 06/29/2010 Page 4 of 4 Csee red line plans). Landscaping consisting of ground cover, shrubs, and trees shall be used to screen elements of unsightliness and screen/soften new improvements. Landscaping shall be used to accentuate and enhance architecture. Please address. 12. Please graphically show the State Street palms. 13. Please indicate where the 236 Star Jasmine are to be planted. 14. Please indicate where the four Phoenix roebelenii on sheet 1 and twelve on sheet 2 are located. 15. Please indicate where the vines are located on sheet 2. 16. Please correct the quantities of vines on sheet 1. Check all tree, shmb and vine quantities. 17. RETURN REDLINES and provide 2 copies of all plans (concept and water conservation) on the next submittal. June 9, 2010 TO: Austin Silva, Assistant Planner Chris DeCerbo, Senior Planner FROM: Michael Elliott, City of Carlsbad's Contract Landscape Architect RE: Landscape Architectural Review - Conceptual Review - 3'^'* Review State Street Mixed Use, RP 05-lOA, CT 05-lOA, CDP 05-42A State Street PELA file: 4 - State Street Mixed Use - Con3 Designer: Kamak Planning & Design, Phone (760) 434-8400 Please advise the applicant to make the following corrections to the plans so that they will meet the requirements of the City of Carlsbad's Landscape Manual. Numbers below are referenced on the red line plans where appropriate for ease in locating the area of the comment concem. REPEAT COMMENTS I. Please clearly show and label all property lines, right-of-ways and easements on the plans. 2"^^ Review: Please show and label the north and east property lines and any easements on the plans. 2-6 Completed. 7. Generally identify all existing woody plant material to be removed or retained. Trees over 12" in caliper diameter shall be identified on the plan individually as to caliper size and type and labeled to be retained or removed. It is noted that there are two large Queen Palms existing along State Street. Please address what is to occur with these palms. S''^ Review: Please show where the palms are being relocated to. 8. The applicant indicates a total ground level landscape area of 2,854 square feet (along with other varying numbers). There appears to be less than 600 square feet of ground level landscape area. This small amount of landscape area is not in scale with the proposed architectural mass and paving and needs to be expanded to provide better project enhancement and softening. Please review, adding landscape area as appropriate to provide a better balance and correct all square footage calculations. See comment number 9 below. 9. Landscaping consisting of ground cover, shmbs, and trees shall be used to screen elements of unsightliness and screen/soften new improvements. Landscaping shall be used to accentuate and enhance architecture. Articulation of the State Street (west) elevation has been modified deleting architectural recesses and landscaping. Additional landscaping is needed to soften and enhance this elevation. No landscaping is proposed along the right (south) elevations. Landscaping to include trees or palms is needed to soften and enhance these elevations for views from the south. Please address all areas. 10. Please add landscape area with shmbs and vines to the north of unit 7 as shown on the red line plans. II. 50% of the shmbs shall be a minimum 5 gallon size. Please revise sizes as appropriate. 12. AH Most proposed shmbs are very low species and will provide little to no architectural elevation enhancement. Please add taller shmbs to better enhance elevations. State Street Mixed Use June 9,2010 Conceptual Plan Review Page 2 13. Completed. 14. Completed. 15. Please provide a written description of water conservation features including addressing xeriscape principles (see Appendix B) within the project. 16-18 Completed 19. Please show all site furniture and plantings on the plans. 2"^ Review: Please add the rectangular planter with King Palm and round pot with Phoenix symbols to the legend. Show locations of the Phoenix in round pots on the plans. 20. Completed. 21. Please identify all symbols used on the plans. Ploaso add a BBQ per proviously approved plans. 2"^ Review: Please show the portable gas BBQ in the legend on sheet 2. 22 RETURN REDLINES and provide 2 copies of all plans (concept and water conservation) on the next submittal. 1 A. Two (2) palms have been deleted along the north elevation (symbol call-out still lists 3 palms) and one appears to be shown below an overhead deck. Landscaping consisting of ground cover, shmbs, and trees shall be used to screen elements of unsightiiness and screen/soften new improvements. Landscaping shall be used to accentuate and enhance architecture. Palms or other tall trees are needed along this elevation to soften and enhance the architectural mass. Please modify site plan to accommodate additional palms/trees. S^^ Review: Seven palms are called for with call-outs along the north building elevation; however only one is graphically shown. Additional palms or trees are needed along this elevation (see red line plans). Landscaping consisting of ground cover, shrubs, and trees shall be used to screen elements of unsightliness and screen/soften new improvements. Landscaping shall be used to accentuate and enhance architecture. Please address. 2A. Completed. 3 A. Please indicate where the 236 Star Jasmine are to be planted. NEW COMMENTS IB. Please indicate where the four Phoenix roebelenii on sheet 1 and twelve on sheet 2 are located. 2B. Please indicate where the vines are located on sheet 2. 3B. Please correct the quantities of vines on sheet 1. Check all tree, shmb and vine quantities. City of Carlsbad Housing & Redevelopment Department March 17, 2010 ROBERT RICHARDSON KARNAK PLANNING AND DESIGN 2802 STATE ST, STE C CARLSBAD CA 92008 Subject: State Street Mixed-Use Amendment RP 05-lOA/ CDP 05-42A/ CT 05-20 Dear Robert: Thank you for applying for a Land Use Permit in the City of Carisbad. The Housing and Redevelopment Department, together with other appropriate City departments, has reviewed your Redevelopment Permit, application No. RP 05-lOA, as to its completeness for processing. The appiication is incomplete, as submitted. The attached list includes information that must be submitted to complete your application. This list of items must be submitted directly to the Housing & Redevelopment Office. All list items must be submitted simultaneously and a copy of this list must be included with your submittal. No processing of your application can occur until the application is determined to be complete. When all required materials are submitted to the Redevelopment Office, the City has an additional thirty (30) days to make a determination of completeness. If the application is determined to be complete, processing for a decision on the application will be initiated. Please contact my office at (760) 434-2813, if you have any questions or wish to set up a meeting to discuss the application. Sincerely, Austin Silva Assistant Planner c: Debbie Fountain, Housing and Redevelopment Director Frank Jimeno, Engineering File 2965 Roosevelt St.. Ste. B • Carlsbad, CA 92008-2397 • (760) 434-2810/2811 • FAX (760) 720-2037 State Street Mixed Use 03/17/2010 Page 2 of 4 LIST OF ITEMS NEEDED TO COMPLETE THE APPLICATION RP 05-lOA Staff has completed a review of the subject project for application completeness. The application and plans submitted for this project are incomplete at this time. The following additional items are required to find the application complete: (Please note the issues are listed under the department which identified them as an area of concem.) Housing & Redevelopment: 1. Please correct the information in the site data table. Refer to redline plans for corrections. Open space calculations do not con-espond with each other. 2. Staff encourages you to provide additional on-site guest parking if possible. 3. Please revise the following items on the site plan: • Indicate distance between buildings and/or structures. • Indicate top and bottom elevations for ail fences, walls, and planters on site plan and show walls on elevation sheets. 4. Please identify location of the trash enclosure and design it to City standards. 5. Please describe/show how garbage is serviced for the project. 6. Please identify location of the A/C units for residential and retail units. 7. Please label the floor plans on units 7, 8 and 9. 8. Piease add architectural detail to the retail portion of the building on the south elevation. The original approved plans had a recessed area with an altemate stucco color. Furthermore, the Design Review Board added condition No. 32 to DRB Resolution No. 309 to provide additional relief or detailing to the elevation that was proposed at the meeting. Please provide the details as to how this additional relief will be provided per the previous condition. 9. Please add architectural detail to the second floor of the western portion of the building on the north elevation. 10. Please provide more detail in the letter of justification for your request of a standards modification. For example, you state the project will be incorporating green building products and options for future buyers. What kind of products and options will be available to buyers? In order to receive standards modifications for green building practices, the project must be achieving a Silver or higher LEED certification. 11. Please show the solar panels and water storage tank on the plans as you have indicated in the justification letter for standards modification. Fire: The Fire Department's comments are forthcoming and will be sent under a separate letter. State Street Mixed Use 03/17/2010 Page 3 of 4 Engineering: The Engineering Department has the following comments: 1. Change the sewer utility to the City of Carisbad in sheet Cl .0 2™* request. 2. The setbacks are still inconsistent between the civil engineer's Tentative Map exhibit and the architectural drawings. Coordinate, clarify and make them consistent. 3. Note comments in the enclosed redlined check prints. Please return the check prints with the formal application submittal to facilitate continued staff review. For questions or concerns regarding Engineering comments, please contact Frank Jimeno at (760) 602-2758. Landscape Plan review: The City's Landscape Plan Check consultant has the following comments: 1. Please clearly show and label the north and east property lines and any easements on the plans. 2. Please identify symbol S-4 in the legend. 3. Please show locations of ali Phoenix roebelenii on the plans. 4. Please indicate the size of the vine. 5. Generally identify all existing woody plant material to be removed or retained. Trees over 12" in caliper diameter shall be identified on the plan individually as to caliper size and type and labeled to be retained or removed. It is noted that there are two large Queen Palms existing along State Street. Please address what is to occur with these palms. 6. The applicant indicates a total ground level landscape area of 2,854 square feet. There appears to be less than 600 square feet of ground level landscape area. This small amount of landscape area is not in scale with the proposed architectural mass and paving and needs to be expanded to provide better project enhancement and softening. Please review, adding landscape area as appropriate to provide a better balance and correct all square footage calculations. See comment number 7 below. 7. Landscaping consisting of ground cover, shrubs, and trees shall be used to screen elements of unsightliness and screen/soften new improvements. Landscaping shall be used to accentuate and enhance architecture. Articulation of the State Street (west) elevation has been modified deleting architectural recesses and landscaping. Additional landscaping is needed to soften and enhance this elevation. No landscaping is proposed along the right (north) elevations. Landscaping to include trees or palms is needed to soften and enhance these elevations for views from the south. Please address all areas. 8. Please add landscape area with shrubs and vines to the north of unit 7 as shown on the red line plans. State Street Mixed Use 03/17/2010 Page 4 of 4 9. 50% of the shrubs shall be a minimum 5 gallon size. Please revise sizes as appropriate. 10. All proposed shrubs are very, low species and will provide little to no architectural elevation enhancement. Please add taller shrubs to better enhance elevations. 11. Please correct the scale on the plan view. It is recommended that a scale of 1"=10' be used to allow all work to be legible. 12. Please provide a written description of water conservation features including addressing xeriscape principles (see Appendix B) within the project. 13. Are these to be King or Queen Palms per the symbols legend or Phoenix roebelenii? Please clarify. Legend appears to indicate Phoenix since there are no King or Queen Palm quantities. Previous plans indicated King or Queen Palms. Please identify these symbols. 14. Please show all site furniture and plantings on the plans. Please add the rectangular planet with King Palm and round pot with Phoenix symbols to the legend. Show locations of the Phoenix in round pots on the plans. 15. Please identify all symbols used on the plans. Please show the portable gas BBQ in the legend on sheet 2. 16. Two (2) palms have been deleted along the north elevation (symbol call-out still lists 3 palms) and one appears to be shown below an overhead deck. Landscaping consisting of ground cover, shrubs and trees shall be used to screen elements of unsightliness and screen/soften new improvements. Landscaping shall be used to accentuate and enhance architecture. Palms or other tall trees are needed along this elevation to soften and enhance the architectural mass. Please modify site plan to accommodate additional palms/trees. 17. Please graphically show the State Street palms. 18. Please indicate where the 236 Star Jasmine are to be planted. 19. RETURN REDLINES and provide 2 copies of all plans (concept and water conservation) on the next submittal. dw}> CITY OF ^CARLSBAD www.carlsbadca.gov Memorandum March 15,2010 To: ASSISTANT PLANNER - AUSTIN SILVA From: Associate Engineer - Frank Jimeno Re: CT 05-20A, RP 05-lOA, CDP 05-42A: 3044 STATE STREET, LLC Engineering Department staff has completed a review of the above-referenced project for application completeness. The application and plans submitted for this proposed project are currently incomplete and unsuitable for further review due to the following incomplete items: 1. Change the sewer utility to the City of Carlsbad in sheet C1.0. 2"^^ request. 2. The setbacks are still inconsistent between the civil engineer's Tentative Map exhibit and the architectural drawings. Coordinate, clarify, and make them consistent. 3. Note comments in the enclosed redlined check prints. Please return the check prints with the formal application submittal to facilitate continued staff review. Should you or the applicant have any questions please contact me at (760) 602-2758. Community & Economic Development 1635 Faraday Ave. I Carisbad, CA 92008 I 760-602-2710 I 760-602-8560 fax Febmary 24, 2010 TO: Austin Silva, Assistant Planner Michele Masterson, Senior Management Analyst FROM: Michael Elliott, City of Carlsbad's Contract Landscape Architect RE: Landscape Architectural Review - Conceptual Review - 2"^^ Review State Street Mixed Use, RP 05-lOA, CT 05-lOA, CDP 05-42A State Street PELA file: 4 - State Street Mixed Use - Con2 Designer: Karnak Planning & Design, Phone (760) 434-8400 Please advise the applicant to make the following corrections to the plans so that they will meet the requirements of the City of Carlsbad's Landscape Manual. Numbers below are referenced on the red line plans where appropriate for ease in locating the area of the comment concern. REPEAT COMMENTS 1. Please clearly show and label all property lines, right-of-ways and easements on the plans. 2"^^ Review: Please show and label the north and east property lines and any easements on the plans. 2. Completed. 3. Please identify symbol S-4 in the legend. 4. Completed. 5. Please show locations of all Phoenix roebelenii on the plans. 6. Please indicate the size of the vine. 7. Generally identify all existing woody plant material to be removed or retained. Trees over 12" in caliper diameter shall be identified on the plan individually as to caliper size and type and labeled to be retained or removed. It is noted that there are two large Queen Palms existing along State Street. Please address what is to occur with these palms. 8. The applicant indicates a total ground level landscape area of 2,854 square feet (along with other varying numbers). There appears to be less than 600 square feet of ground level landscape area. This small amount of landscape area is not in scale with the proposed architectural mass and paving and needs to be expanded to provide better project enhancement and softening. Please review, adding landscape area as appropriate to provide a better balance and correct all square footage calculations. See comment number 9 below. 9. Landscaping consisting of ground cover, shmbs, and trees shall be used to screen elements of unsightliness and screen/soften new improvements. Landscaping shall be used to accentuate and enhance architecture. Articulation of the State Street (west) elevation has been modified deleting architectural recesses and landscaping. Additional landscaping is needed to soften and enhance this elevation. No landscaping is proposed along the right (south) elevations. Landscaping to include trees or palms is needed to soften and enhance these elevations for views from the south. Please address all areas. 10. Please add landscape area with shmbs and vines to the north of unit 7 as shown on the red line plans. State Street Mixed Use Febmary 24, 2010 Conceptual Plan Review Page 2 11. 50% of the shmbs shall be a minimum 5 gallon size. Please revise sizes as appropriate. 12. All proposed shmbs are very low species and will provide little to no architectural elevation enhancement. Please add taller shmbs to better enhance elevations. 13. Completed. 14. Please correct the scale on the plan view. It is recommended that a scale of 1"=10' be used to allow all work to be legible. 15. Please provide a written description of water conservation features including addressing xeriscape principles (see Appendix B) within the project. 16. Are these to be King or Queen Palms per the symbols legend or Phoenix roebelenii? Please clarify. Legend appears to indicate Phoenix since there are no King or Queen Palm quantities. Previous plans indicated King or Queen Palms. 2"^^ Review: Please identify these symbols. 17. Completed. 18. Completed. 19. Please show all site furniture and plantings on the plans. 2"'^ Review: Please add the rectangular planter with King Palm and round pot with Phoenix symbols to the legend. Show locations of the Phoenix in round pots on the plans. 20. Completed. 21. Please identify all symbols used on the plans. Ploase add a BBQ per previously approved plans. 2^^ Review: Please show the portable gas BBQ in the legend on sheet 2. 22 RETURN REDLINES and provide 2 copies of all plans (concept and water conservation) on the next submittal. NEW COMMENTS 1 A. Two (2) palms have been deleted along the north elevation (symbol call-out still lists 3 palms) and one appears to be shown below an overhead deck. Landscaping consisting of ground cover, shmbs, and trees shall be used to screen elements of unsightliness and screen/soften new improvements. Landscaping shall be used to accentuate and enhance architecture. Palms or other tall trees are needed along this elevation to soften and enhance the architectural mass. Please modify site plan to accommodate additional palms/trees. 2A. Please graphically show the State Street palms. 3A. Please indicate where the 236 Star Jasmine are to be planted. Citv of Carlsbad Housing & Redevelopment Department September 3, 2009 ROBERT RICHARDSON KARNAK PLANNING AND DESIGN 2802 STATE ST, STE C CARLSBAD CA 92008 Subject: , State Street Mixed-Use Amendment RP 05-1 OA/ CDP 05-42A/ CT 05-20 Dear Robert: Thank you for applying for a Land Use Permit in the City of Carisbad. The Housing and Redevelopment Department, together with other appropriate City departments, has reviewed your Redevelopment Pennit, application No. RP 05-lOA, as to its completeness for processing. The application is incomplete, as submitted. The attached list includes infomiation that must be submitted to complete your application. This list of Items must be submitted directly to the Housing & Redevelopment Office. All list items must be submitted simultaneously and a copy of this list must be included with your submittal. No processing of your application can occur until the application is determined to be complete. When all required materials are submitted to the Redevelopment Office, the City has an additional thirty (30) days to make a detennination of completeness. If the application is determined to be complete, processing for a decision on the application will be initiated. In addition, please note that you have six months from the date the appiication was initially filed, July 31, 2009, to either resubmit the application or submit the required information. Failure to resubmit the application or to submit the materials necessary to determine your application complete shall be deemed to constitute withdrawal of the application. If an application is withdrawn or deemed withdrawn, a new application must be submitted. Please contact my office at (760) 434-2813, if you have any questions or wish to set up a meeting to discuss the application. Sincerely, Austin'^ilva Assistant Planner c: Debbie Fountain, Housing and Redevelopment Director Frank Jimeno, Engineering Will Foss, Building Dominic Fieri, Fire 2965 Roosevelt St., Ste. E * Carlsbad, CA 92008-2397 * (760) 434-28"10/2811 * FAX (760) /20-20S" State Street Mixed Use 09/03/2009 Page 2 of 6 LIST OF ITEMS NEEDED TO COMPLETE THE APPLICATION RP 05-lOA Staff has completed a review of the subject project for application completeness. The application and plans submitted for this project are incomplete at this time. The following additional items are required to find the application complete: (Please note the issues are listed under the department which identified them as an area of concem.) Housing & Redevelopment: 1. Please correct the infonnation in the site data table. Refer to redline plans for corrections. Open space calculations do not conrespond with each other. 2. The calculations in the site data table on page Cl.O differ from the data on page ASI .0. Please correct this data. 3. According to the data provided, only 17% open space is proposed for the project. A minimum of 20% of the property must be maintained as open space. Open space may be dedicated to landscaped planters, open space pockets and/or connections, roof gardens, balconies, patios and/or outdoor eating areas. 4. Twenty-seven (27) parking spaces are required for this project as proposed. There are only 25 parking spaces proposed. 5. With 1,288 square feet of retail space proposed, you are eligible to participate In the Parking In-Lieu Fee Program for 4 spaces, not 6 as you have noted in the site data table. 6. Staff encourages you to provide additional on-site guest parking if possible. 7. An extra two and a half feet of clearance is required for the visitor parking spaces along the Oak Avenue Alley because it is abutting a solid wall. 8. Staff suggests increasing the size of the windows in the retail space to provide future tenants ample space to have attractive storefront displays and greater visibility into the store. 9. Garages are required to be a minimum of 20 feet wide by 20 feet long. The garages in unit numbers 4, 5, 6, 7 and 8 are not 20 feet wide and do not meet this requirement. 10. Please revise the following items on the cover sheet: • At upper right hand corner include the following permit numbers "RP 05-lOA", "CDP 05-42A" and "CT 05-20A". • Please correct Zoning to read "V-R Village Review, District 1" • Please correct setback range on the cover page to reflect the new District 1 setback standards. There is a zero foot setback requirement for the ground floor and a 10 foot average for floors at the second level and above (front setback). State Street Mixed Use 09/03/2009 Page 3 of 6 11. Please revise the following items on the site plan: • Indicate residential visitor paridng area on the site plan and call out the dimensions. • Indicate distance between buildings and/or structures. • Indicate top and bottom elevations for all fences, walls, and planters on site plan and show walls on elevation sheets. 12. Please identify location ofthe trash enclosure and design it to City standards. 13. Please describe/show how garbage is serviced for the project. 14. Please identify location of the NC units for residential and retail units. 15. Please indicate roof pitch on the elevations. The required roof pitch is 5:12 or greater. 16. Piease label the floor plans on units 7, 8 and 9. 17. Please add detailing to the south-facing, second-floor walls on units 6 and 9. 18. Please add architectural detail to the retail portion of the building on the south elevation. The original approved plans had a recessed area with an altemate stucco color. Furthemiore, the Design Review Board added condition No. 32 to DRB Resolution No. 309 to provide additional relief or detailing to the elevation that was proposed at the meeting. Please provide the details as to how this additional relief will be provided per the previous condition. 19. Please provide enhanced paving within the motorcourt driveway that directs visitors to the entrances of the residential units. This was also added as part of condition No. 32 of DRB Resolution No. 309 after discussion during the public hearing. 20. Please provide more detail in the letter of justification for your request of a standards modification. For example, you state the project will be incorporating green building products and options for future buyers. What kind of products and options will be available to buyers? In order to receive standards modifications for green building practices, the project must be achieving a Silver or higher LEED certification. 21. Please show the solar panels and water storage tank on the plans as you have indicated in the justification letter for standards modification. Fire: The Fire Department has the following comments: 1. Revise the sprinkler note to use the 2007 California Fire Code and NFPA 13 instead of the ICBO code. To discuss all Fire Department related concerns, please contact Dominic Fieri at (760) 602-4664. State Street Mixed Use 09/03/2009 Page 4 of 6 Building: The Building Department has the following comments: 1. A project with more than four (4) condominium units must contain accessible units and bathroom clearances must comply with Title 24. Engineering: The Building Department has the following comments: 1. Change the Sewer utility to the City of Carisbad in sheet Cl .0. 2. Add a North an^ow and a graphic scale to the site plan ASI .0. 3. The Retail Commercial area is 1288 sq ft per sheet AS1.0. The Site Data in sheet Cl .0 and the calculations in the engineering drawings use 999 sq ft. Clarify. 4. The setback dimension along the Oak Ave. Alley is shown as 5'-0" to the building wall in sheets AS1.0 and Al.O; the building cross-section in sheet A3.0 shows it as 5'-2" to an ornamental feature, not the wall, and the Motor Court West elevation in sheet A4.0 to the wall. Architectural sheets A1.0, /^.O, A3.0, A4.0, A4.1, L1.1, and Civil sheets 2 and 3 are inconsistent. The setbacks are shown as 5'-0", 5'-1" and 5'-2" throughout. See drawings. 5. The setback to the adjacent property to the southeast adds up to 5'-8'' in sheet AS 1.0; it is shown as 5'-0" in the building cross-section in sheet A3.0. 6. Submit a signed, filled-in Development Storm Water Standards Questionnaire. 7. Note comments in the Storm Water Management Plan. 8. Note comments in the enclosed redlined check prints. Please return the check prints with the formal application submittal to facilitate continued staff review. Landscape Plan review: The City's Landscape Plan Check consultant has the following comments: 1. Please cleariy show and label all property lines, right-of-ways and easements on the plans. 2. Please provide a north arrow on all plan sheets. 3 Please identify symbol S-4 in the legend. 4. Please indicate where ali vines are proposed on the plans. 5. Please show locations of all Phoenix roebelenii on the plans. State Street Mixed Use 09/03/2009 Page 5 of 6 6. Please indicate the size of the vine. 7. Generally identify all existing woody plant material to be removed or retained. Trees over 12" In caliper diameter shall be identified on the plan individually as to caliper size and type and labeled to be retained or removed. It is noted that there are two large Queen Palms existing along State Street. Please address what is to occur with these palms. 8. The applicant indicates a total ground level landscape area of 2,854 square feet. There appears to be less than 600 square feet of ground level landscape area. This small amount of landscape area Is not in scale with the proposed architectural mass and paving and needs to be expanded to provide better project enhancement and softening. Please review, adding landscape area as appropriate to provkJe a better balance and correct all square footage catoulations. See comment number 9 below. 9. Landscaping consisting of ground cover, shrubs, and trees shall be used to screen elements of unsightliness and screen/soften new improvements. Landscaping shall be used to accentuate and enhance architecture. Articulation of the State Street (west) elevation has been modified deleting architectural recesses and landscaping. Additional landscaping is needed to soften and enhance this elevation. No landscaping is proposed along the right (north) elevations. Landscaping to include trees or palms is needed to soften and enhance these elevations for views from the south. Please address all areas. 10. Please add landscape area with shrubs and vines to the north of unit 7 as shown on the red line plans. 11. 50% of the shrubs shall be a minimum 5 gallon size. Please revise sizes as appropriate. 12. All proposed shrubs are very low species and will provide little to no architectural elevation enhancement. Please add taller shrubs to better enhance elevations. 13. All utilities are to be screened. Landscape constmction drawings will be required to show and label all utilities and provide appropriate screening. 14. Please correct the scale on the plan view. It is recommended that a scale of r=10' be used to allow all work to be legible. 15. Please provide a written description of water conservation features including addressing xeriscape principles (see Appendix B) within the project. 16. Are these to be King or Queen Palms per the symbols legend or Phoenix roebelenii? Please clarify. Legend appears to indicate Phoenix since there are no King or Queen Palm quantities. Previous plans indicated King or Queen Palms. 17. Are these to be planted in pots? Please clarify. 18. Please clarify where planters are. 19. Please show all site furniture and plantings on the plans. State Street Mixed Use 09/03/2009 Page 6 of 6 20. Please add roof deck seating symbol to the legend. 21. Please identify all symbols used on the plans. Please add a BBQ per previously approved plans. 22. RETURN REDLINES and provide 2 copies of all plans (concept and water conservation) on the next submittal. Karnak Planning & Design Robert Richardson, Planner * Jim RosenLieb, Architect 2802 State Street, Suite C, Carlsbad, Ca 92008 (760) 434-8400 Fax (760) 434-8493 e-mail: IcarnakarchfSiaol.com August 21, 2009 Redevelopment and Housing CityofCarlsbad 2965 Roosevelt Street, Suite B Carlsbad, CA 92008 RE: Justification letter 3044 State Street LLC Mixed Use Project ATTN: Debbie Fountain, Director Austin Silva, Planner This is a letter of justification for refiling the 3044 State Street Mixed Use Project with changes. Since the city has developed new and improved standards to the redevelopment area of Downtown Carlsbad, we have decided to modify our 3044 State Street LLC Mixed Use Project with the following items: 1. Incorporate green building products and options for the future buyers. 2. Due to the change in the economy, we have chosen to reduce the size of the individual units to meet with today's real estate market. 3. Provide on site affordable housing unit instead of paying a fee for one. 4. The new standards can allow for three additional condominium units. 5. Provide solar panels options to integrate conservation features such as grey water collection and roof water into a storage tank that can be used for irrigation. We will design the landscape to drought tolerant plant material. 6. Update the design to the new ADA codes and revised building standards. 7. Provide design features that have been requested by Costal Commission and Debbie Fountain, Redevelopment and Housing Director City of Carlsbad. Such as parking for smart or mini cars, and providing hook ups for charging the electric cars. Provide housing close to mass transit, trains and buses. 8. Provide over 1200 sq.ft. of retail space. The above items are just a few ofthe many items we are going to add to this mixed use project. If you have any questions or comments please let us know. Respectfully submitted, Robert G. Richardson Kamak Planning and Design