Loading...
HomeMy WebLinkAboutRP 05-11; Hilton Carlsbad Beach Resort PC Exhibits; Redevelopment Permits (RP) ANNUAL SUPPLEMENTAL WATER REQUIREMENTS BY HYDROZONEWAVE CREST RESORT, CARLSBAD, CALIFORNIA HYDROZONEDESCRIPTION OF CALCULATIONS UNITS NO. 1 NO. 2 NO. 3 NO. 4 NO. 5 NO. 6 NO. 7TOTAL IRRIGATED AREA SFT 13,124 65,181 20,842 21,771 5,676 18,706 9,116ANNUAL ET RATE IN. 42.90 42.90 42.90 42.90 42.90 42.90 42.90ANNUAL RAINFALL IN. 14.10 14.10 14.10 14.10 14.10 14.10 14.10APPLIED RAINFALL (30% OF TOTAL) IN. 4.23 4.23 4.23 4.23 4.23 4.23 4.23HYDROZONE PLANT FACTOR % 0.800.500.300.200.900.600.60PROPOSED IRRIGATION METHOD N/A SPRAY SPRAY DRIP DRIP SPRAY SPRAY SPRAYIRR5IGATION EFFICIENCY % 0.650.650.900.900.650.650.65TOTAL WATER REQUIREMENT IN. 52.80 33.00 14.30 9.53 59.40 39.60 39.60SUPPLEMENTAL WATER REQUIREMENT IN. 48.57 28.77 10.07 5.30 55.17 35.37 35.37SUPPLEMENTAL WATER REQUIREMENT GALS. 397,361 1,168,992 130,834 71,974 195,207 412,445 200,997TOTAL S. WATER REQUIREMENT GALS. 2,577,810TOTAL S. WATER REQUIREMENT AC-FT 7.911TOTAL PROJECT LANDSCAPE AREA SFT 154,416TOTAL PROJECT LANDSCAPE AREA ACRES 3.54